186-28 MIDLAND PARKWAY
QUEENS · BIN 4156251
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R1-2Zoning
1,848 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 7,354 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction4p · 1 filing · 20 docs
CellarUnder Construction2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2024$1.8M—— → —$974/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS606/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
GERALD J CALIENDO R A P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB RENOVATION & MODELINGGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519306/26/2026
Building Lifecycle
All (52)Filed (6)Permit Issued (2)Violation (2)Objection (12)Special Inspection (30)
07/07/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
07/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/07/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/07/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/07/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/07/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/07/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/07/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
07/07/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
07/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
07/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
07/07/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/07/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/07/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/07/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/07/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/07/2026
Special inspection requirement — Fireplaces
Younes Abouyaala
07/07/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
07/07/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/26/2026
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION AND VERTICAL EXTENSION OF AN EXISTING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOR WORK, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE, OCCUPANCY OREGRESS.
Q01126500-P3
04/27/2026
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION AND VERTICAL EXTENSION OF AN EXISTING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOR WORK, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE, OCCUPANCY OREGRESS.
Q01126500-P2
04/27/2026
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
04/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/16/2026
Violation issued (ECB, closed)
Construction
04/10/2026
Violation issued (ECB, closed)
Construction
03/04/2026
Permit issued — Construction Fence
Q01119910-I1-FN
03/03/2026
Permit issued — Structural
Q01126500-I1-GC-CX
02/12/2025
Objection raised — Other
02/12/2025
Objection resolved — Addressed
01/29/2025
Objection resolved — Addressed
01/29/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/19/2024
Objection raised — Other
12/19/2024
Objection raised — Scope
12/17/2024
Objection raised — Other
12/12/2024
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION AND VERTICAL EXTENSION OF AN EXISTING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOR WORK, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE, OCCUPANCY OREGRESS.
Q01126500-P1
12/09/2024
Objection resolved — Addressed
12/05/2024
Objection raised — Other
12/02/2024
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION AND VERTICAL EXTENSION OF AN EXISTING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOR WORK, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE, OCCUPANCY OREGRESS.
Q01126500-S1
11/12/2024
Objection raised — Other
11/05/2024
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION AND VERTICAL EXTENSION OF AN EXISTING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOR WORK, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO USE, OCCUPANCY OREGRESS.
Q01126500-I1
10/01/2024
Filed — Alteration
Q01119910-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSB RENOVATION & MODELING03/04/2026
DOB NOWStructuralPermit IssuedSB RENOVATION & MODELING03/03/2026
1 project · most recent 06/26/2026
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2026Permit IssuedSB RENOVATION & MODELINGHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-FS06NA 400,000 BTU · Split System ×9
Heating
Mitsubishi Electric MSZ-FS06NA 400,000 BTU · Split System ×9
Ventilation
Mitsubishi Electric MXZ-4C36NA2 400,000 BTU · Heat Pump Outdoor ×9
1 project · most recent 06/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/26/2026——Gas, Storm, Water/Sanitary
1 project · most recent 06/26/2026
Wood
FiledStatusContractorScope
06/26/2026Permit IssuedSB RENOVATION & MODELINGWood
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
07/07/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/07/2026Fenestration areasYounes Abouyaalaenergy_progress
07/07/2026Shutoff dampersYounes Abouyaalaenergy_progress
07/07/2026Interior lighting powerYounes Abouyaalaenergy_progress
07/07/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/07/2026Fenestration air leakageYounes Abouyaalaenergy_progress
07/07/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/07/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/07/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/07/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/07/2026Mechanical SystemsYounes Abouyaalaspecial
07/07/2026Subgrade InspectionsYounes Abouyaalaspecial
07/07/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
07/07/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
07/07/2026Footing and FoundationYounes Abouyaalaprogress
07/07/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/07/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/07/2026Structural Wood FrameYounes Abouyaalaprogress
07/07/2026FinalNAVEEN KUMARprogress
07/07/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/07/2026Permanent certificateYounes Abouyaalaenergy_progress
07/07/2026Lighting controlsYounes Abouyaalaenergy_progress
07/07/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/07/2026FireplacesYounes Abouyaalaenergy_progress
07/07/2026Maintenance informationYounes Abouyaalaenergy_progress
Latest 25 of 68.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01119910-I1Request digital key ↗
08/17/2026Q01126500-P3Request digital key ↗
08/17/2026Q01126500-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026Q01126500-P2Open ↗
08/17/2026Q01126500-P3Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/13/2026Q01126500-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q01126500-P2Open ↗
08/29/2026Q01126500-P2Open ↗
08/29/2026Q01126500-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q01126500-P2Open ↗
08/29/2026Q01126500-P2Open ↗
08/29/2026Q01126500-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01126500-I1Open ↗
08/17/2026Q01126500-P1Open ↗
08/17/2026Q01126500-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/15/2026Q01126500-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/17/2026Q01126500-P2Open ↗
08/17/2026Q01126500-P3Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01126500-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWPlot Diagram3
08/17/2026Q01126500-P3Open ↗
08/17/2026Q01126500-P2Open ↗
08/13/2026Q01126500-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01126500-I1Open ↗