← Back
Two stories - detached, small or mid-size
186-30 JORDAN AVENUE
QUEENS · St. Albans · BIN 4221645
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,792 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,600 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC202/07/2025
ETRECTE LLC108/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
KAMTECH RESTORATION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854202/07/2025
ETRECTE LLC8116108/08/2024
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (1)Special Inspection (15)
03/17/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01166378-I1
02/07/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01166378-P1
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
02/07/2025
Special inspection requirement — Final
TOM PETERSEN
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
02/07/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
02/07/2025
Special inspection requirement — Final
TOM PETERSEN
02/07/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
01/14/2025
Permit issued — Solar
Q01166378-I1-SL
01/13/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01166378-I1
08/16/2024
Permit issued — Solar
Q01088503-I1-SL
08/08/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
Q01088503-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
07/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
07/30/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
07/30/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP01/14/2025
DOB NOWSolarPermit IssuedJ.B.I. CONSTRUCTION GROUP08/16/2024
2 projects · most recent 02/10/2025
FiledStatusContractorScope
02/10/2025CompleteBERGER QUALITY ELEC'L CON—
08/05/2024Permit IssuedJSP ELECTL CNTNG CORP—
1 project · most recent 08/08/2024
FiledStatusContractorScope
08/08/2024Permit IssuedJ.B.I. CONSTRUCTION GROUP15 panels, 6.15 kw, 316.81 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/07/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/07/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/07/2025FinalTOM PETERSENprogress
02/07/2025Energy Code Compliance InspectionsTOM PETERSENprogress
02/07/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
02/07/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/07/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/07/2025Energy Code Compliance InspectionsTOM PETERSENprogress
02/07/2025FinalTOM PETERSENprogress
02/07/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
07/30/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
07/30/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
07/30/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
07/30/2024FinalVYACHESLAV NECHAYEVprogress
07/30/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01088503-I1Request digital key ↗
08/21/2026Q01166378-I1Request digital key ↗
08/21/2026Q01166378-P1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026Q01166378-P1Open ↗
09/02/2026Q01166378-P1Open ↗
09/02/2026Q01166378-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026Q01166378-P1Open ↗
09/02/2026Q01166378-P1Open ↗
08/31/2026Q01166378-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01166378-I1Open ↗
08/13/2026Q01166378-P1Open ↗
08/13/2026Q01088503-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01166378-I1Open ↗
08/13/2026Q01088503-I1Open ↗
08/13/2026Q01166378-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01166378-I1Open ↗