← Back
BuildNYC
Two stories - detached, small or mid-size
186-30 JORDAN AVENUE
QUEENS · St. Albans · BIN 4221645
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,792 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,600 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop solar installation3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect202/07/2025
Etrecte108/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jbi Construction Group203/21/2026
Kamtech Restoration403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jbi Construction Groupspecialty_contractor303/21/2026
Kamtech Restorationspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854202/07/2025
Etrecte8116108/08/2024
Building Lifecycle
03/17/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01166378-I1
02/07/2025
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01166378-P1
02/07/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKamtech Restoration01/14/2025
DOB NOWSolarPermit IssuedJ.B.I. Construction Group08/16/2024
2 projects · most recent 02/10/2025
FiledStatusContractorScope
02/10/2025CompleteBerger Quality Electrical—
08/05/2024Permit IssuedJSP Electl CNTNG—
1 project · most recent 08/08/2024
FiledStatusContractorScope
08/08/2024Permit IssuedJ.B.I. Construction Group—
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/07/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
02/07/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
02/07/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/07/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/07/2025Energy Code Compliance InspectionsTOM PETERSENprogress
02/07/2025FinalTOM PETERSENprogress
02/07/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
02/07/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
02/07/2025FinalTOM PETERSENprogress
02/07/2025Energy Code Compliance InspectionsTOM PETERSENprogress
07/30/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
07/30/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
07/30/2024FinalVYACHESLAV NECHAYEVprogress
07/30/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
07/30/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account