← Back
Over six families without stores
186 CROSS STREET
BRONX · BIN 2091827
💬 Discuss this project
1900Year Built
3Stories
C1Building Class
R3AZoning
5,180 sfGross Floor Area
7Units
Rent Stabilized10 Open Violations 8 unresolved · 2 paperwork only ▸
Over six families without stores · Owner of record: A. INTERNATIONAL CITY ISLAND CORP. · 10,800 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 16 docs
Floor 34p · 2 filings · 7 docs
Floor 2
Floor 14p · 2 filings · 7 docs
Cellar6p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 186 CROSS ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JBA204/05/2024
CONSTANT AND BROWN ENGINEERING DPC211/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AYE CONSULTING GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILLIAM JAMES BUSHELL CORGeneral Contractor303/21/2026
BERGER QUALITY ELEC'L CONElectrical203/22/2026
MOSHE ROTHElectrical203/21/2026
FRED J. RIEHM INCPlumbing107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415104/05/2024
WORLD DESIGN ARCHITECTURE9323102/20/2024
CONSTANT AND BROWN ENGINE7565211/22/2021
Building Lifecycle
All (66)Filed (4)Permit Issued (3)Signed Off (1)Violation (47)Special Inspection (11)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
11/03/2025
Violation issued (ECB, closed)
Construction
11/03/2025
Violation issued (ECB, open)
Unknown
06/05/2025
Violation issued (HPD, open)
A
12/06/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO CHANGE IN BULK
X01001905-I1
04/10/2024
Permit issued — Solar
X01001905-I1-SL
04/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
04/08/2024
Special inspection requirement — Final
JEFFREY BELL
04/08/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
04/05/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO CHANGE IN BULK
X01001905-P1
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
04/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DOYUN KIM
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
04/05/2024
Special inspection requirement — Final
JEFFREY BELL
04/05/2024
Special inspection requirement — Air barrier - visual inspection
DOYUN KIM
04/02/2024
Violation issued (HPD, open)
A
02/20/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO CHANGE IN BULK
X01001905-I1
11/16/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, closed)
I
03/16/2022
Permit issued — Plumbing
X79243377-I1-PL
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, open)
A
11/30/2021
Permit issued — Plumbing
X00627861-I1-PL
11/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VLADIMIR CONSTANT
11/22/2021
Filed — Alteration
Removal of gas meters,gas piping fittings & riser valves;replacement of gas piping at cellar with new branch line,gas boiler and hot water tank, new gas shut-off valves; relocation/replacement of existing main gas meter ;installation of new gas dryers.
X00627861-P1
11/10/2021
Filed — Alteration
Removal of gas meters,gas piping fittings & riser valves;replacement of gas piping at cellar with new branch line,gas boiler and hot water tank, new gas shut-off valves; relocation/replacement of existing main gas meter ;installation of new gas dryers.
X00627861-I1
04/02/2021
Violation issued (HPD, closed)
A
03/01/2021
Violation issued (ECB, open)
Construction
03/01/2021
Violation issued (ECB, closed)
Construction
02/02/2020
Violation issued (HPD, closed)
B
10/10/2018
Violation issued (HPD, closed)
I
11/13/2017
Violation issued (HPD, closed)
I
03/09/2017
Violation issued (HPD, open)
A
03/09/2017
Violation issued (HPD, closed)
A
03/09/2017
Violation issued (HPD, closed)
B
03/09/2017
Violation issued (HPD, closed)
A
03/09/2017
Violation issued (HPD, closed)
A
03/09/2017
Violation issued (HPD, open)
A
10/07/2016
Violation issued (HPD, closed)
B
10/07/2016
Violation issued (HPD, closed)
B
10/07/2016
Violation issued (HPD, closed)
B
10/04/2016
Violation issued (HPD, closed)
A
10/04/2016
Violation issued (HPD, closed)
C
10/04/2016
Violation issued (HPD, closed)
B
10/04/2016
Violation issued (HPD, closed)
B
10/02/2015
Violation issued (HPD, closed)
I
02/04/2015
Violation issued (HPD, closed)
I
11/13/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2004
Violation issued (ECB, closed)
Construction
11/24/2003
Violation issued (ECB, closed)
Construction
08/08/2003
Violation issued (ECB, closed)
Construction
08/08/2003
Violation issued (ECB, closed)
Construction
01/27/2003
Violation issued (ECB, closed)
Construction
08/09/2002
Violation issued (ECB, closed)
Construction
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offWILLIAM JAMES BUSHELL COR04/10/2024
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN03/16/2022
DOB NOWPlumbingPermit IssuedFRED J. RIEHM INC11/30/2021
BISOTISSUEDKAMTECH RESTORATION CORP10/02/2018
BISOTISSUEDBEECHHUERTS MANAGEMENT CORP.12/05/2007
BISOTISSUEDBEECHHUERTS MANAGEMENT CORP.02/23/2007
BISSPISSUEDVIP FIRE SPRINKLER INC10/04/2006
BISOTISSUEDAFS DESIGNS/CONSTRUCTION COMPANY05/19/2004
1 project · most recent 11/22/2021
Gas
FiledStatusContractorScope
11/22/2021Permit IssuedFRED J RIEHM INCGas
3 projects · most recent 05/02/2024
General Wiring
FiledStatusContractorScope
05/02/2024Permit IssuedB.P. ELECTRIC CORPGeneral Wiring
04/02/2024CompleteB.P. ELECTRIC CORP—
11/14/2018CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/08/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/08/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
04/08/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
04/08/2024FinalJEFFREY BELLprogress
04/08/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
04/05/2024Fire-Resistant Penetrations and JointsDOYUN KIMspecial
04/05/2024Structural Stability – Alterations of existing buildingsDOYUN KIMspecial
04/05/2024Energy Code Compliance InspectionsDOYUN KIMprogress
04/05/2024FinalJEFFREY BELLprogress
04/05/2024Air barrier - visual inspectionDOYUN KIMenergy_progress
11/27/2021Fire-Resistant Penetrations and JointsVLADIMIR CONSTANTspecial
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026X00627861-I1Request digital key ↗
08/25/2026X00627861-P1Request digital key ↗
08/21/2026X01001905-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/14/2018240236240Open ↗
▸BISWORK PERMIT APPLICATION1
10/02/2018240236240Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026X01001905-I1Open ↗
08/26/2026X01001905-I1Open ↗
08/26/2026X01001905-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00627861-I1Open ↗
08/25/2026X00627861-P1Open ↗
08/13/2026X01001905-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026X00627861-I1Open ↗
08/26/2026X01001905-I1Open ↗
08/26/2026X01001905-P1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/14/2018240236240Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/14/2018240236240Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00627861-P1Open ↗
08/25/2026X00627861-I1Open ↗
08/13/2026X01001905-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/14/2018240236240Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/14/2018240236240Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/14/2018240236240Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/14/2018240236240Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01001905-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/14/2018240236240Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/14/2018240236240Open ↗
▸BISADDITIONAL INFORMATION1
09/20/2018240236240Open ↗