← Back
Elevator apt, converted
186 FRANKLIN STREET
MANHATTAN · BIN 1002113
💬 Discuss this project
1890Year Built
6Stories
D5Building Class
C6-2AZoning
24,700 sfGross Floor Area
8Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Elevator apt, converted · Owner of record: FRANKLIN STREET LOFTS LLC · 4,444 sf lot · 5.56 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 20 docs
Floor 55p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 22p · 1 filing · 11 docs
Floor 12p · 1 filing · 20 docs
4 jobs · most recent 10/16/2023
General Wiring
FiledStatusContractorScope
10/16/2023CompleteWORD OF LIGHT ELECT LLCGeneral Wiring
08/14/2023CompleteWORD OF LIGHT ELECT LLC7 meters, 1 new_meters
01/18/2021CompleteHI-RITE ELECTRIC CORPGeneral Wiring
06/20/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
Building Lifecycle
All (144)Filed (15)Permit Issued (13)Signed Off (9)Violation (60)Inspection (6)Objection (16)Special Inspection (25)
03/25/2026
Signed off — Alteration
Mechanical filing design includes the replacement of an existing 20 ton split air conditioning unit with a new 12 ton split heat pump unit to service the commercial space. No change in use, egress, or occupancy under this application.
M01324856-I1
03/24/2026
Filed — Alteration
Mechanical filing design includes the replacement of an existing 20 ton split air conditioning unit with a new 12 ton split heat pump unit to service the commercial space. No change in use, egress, or occupancy under this application.
M01324856-P1
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Liangkai Xia
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
03/24/2026
Special inspection requirement — Final
Liangkai Xia
03/24/2026
Special inspection requirement — Mechanical Systems
Liangkai Xia
03/24/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Liangkai Xia
03/02/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Liangkai Xia
03/02/2026
Special inspection requirement — Final
Liangkai Xia
03/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/02/2026
Special inspection requirement — Mechanical Systems
Liangkai Xia
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liangkai Xia
02/17/2026
Permit issued — Mechanical Systems
M01324856-I1-MS
12/19/2025
Filed — Alteration
Mechanical filing design includes the replacement of an existing 20 ton split air conditioning unit with a new 12 ton split heat pump unit to service the commercial space. No change in use, egress, or occupancy under this application.
M01324856-I1
10/01/2025
Signed off — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-S1
04/01/2024
Violation issued (HPD, closed)
A
12/07/2023
Filed — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-P2
12/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
12/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/03/2023
Signed off — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-S2
11/02/2023
Permit issued — Plumbing
M00829731-S1-PL
11/01/2023
Signed off — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-I1
10/27/2023
Permit issued — Mechanical Systems
M00829731-S2-MS
10/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Other
09/06/2023
Filed — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-S2
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
08/18/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/14/2023
Permit issued — Plumbing
M00829731-S1-PL
03/30/2023
Permit issued — Plumbing
M00829731-S1-PL
03/30/2023
Permit issued — General Construction
M00829731-I1-GC
03/10/2023
Filed — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-S1
03/10/2023
Special inspection requirement — Mechanical Systems
Belal Salim
03/10/2023
Special inspection requirement — Final
Belal Salim
03/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
02/21/2023
Objection raised — Structural
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Scope
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Accessibility
02/21/2023
Objection resolved — Addressed
02/21/2023
Objection raised — Other
02/21/2023
Objection resolved — Addressed
02/17/2023
Filed — Alteration
INSTALLATION OF NEW DUCTED SPLIT HVAC SYSTEMS FOR THE 5TH FLOOR RESIDENTIAL UNIT ONLY. FILED IN CONJUNCTION WITH GC #M00829731-I1
M00829731-I1
02/15/2023
Signed off — Alteration
REMOVAL OF RES SINK & DISHWASHER IN UNIT #5R IN CONJUNCTION WITH THE COMBINATION OF UNITS #5F & 5R AS PER TPPN3/79. GENERAL CONSTRUCITON FILED UNDER #M08017072-I1
M08017072-S1
02/15/2023
Special inspection requirement — Final
Belal Salim
02/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
02/13/2023
Signed off — Alteration
REMOVAL OF RES SINK & DISHWASHER IN UNIT #5R IN CONJUNCTION WITH THE COMBINATION OF UNITS #5F & 5R AS PER TPPN3/79. GENERAL CONSTRUCITON FILED UNDER #M08017072-I1
M08017072-I1
02/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2023
Permit issued — Plumbing
M08017072-S1-PL
01/12/2023
Permit issued — General Construction
M08017072-I1-GC
12/14/2022
Filed — Alteration
REMOVAL OF RES SINK & DISHWASHER IN UNIT #5R IN CONJUNCTION WITH THE COMBINATION OF UNITS #5F & 5R AS PER TPPN3/79. GENERAL CONSTRUCITON FILED UNDER #M08017072-I1
M08017072-S1
12/12/2022
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
10/31/2022
Filed — Alteration
REMOVAL OF RES SINK & DISHWASHER IN UNIT #5R IN CONJUNCTION WITH THE COMBINATION OF UNITS #5F & 5R AS PER TPPN3/79. GENERAL CONSTRUCITON FILED UNDER #M08017072-I1
M08017072-I1
10/06/2022
Special inspection requirement — Final
Belal Salim
04/19/2022
Signed off — Alteration
NEW TOIL, TUB, SHOWER & (2)LAVS. CAP&REMOVE TUB. REPLACEMENT OF (3)LAVS & TOIL; RELOCATION OF EXIST'G SHOWER, TUB, LAV, (2)TOILETS, ELEC WASHER, RES SINK & DW. NEW GAS STOVE CONNECTED TO EXISTING GAS RISER. NO CHANGE OF USE, EGRESS OR OCCUPANCY
M00339022-I1
Latest 60 of 144 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAX REAL ESTATE3009/13/2026
SN BUILDER INC SAKANDER R203/22/2026
186 FRANKLIN STREET903/22/2026
BRESON2603/22/2026
L.C.C. REALTY203/22/2026
THE OWNER OF103/22/2026
BRESOR CORP COMMODITIE103/22/2026
PHAZE CONSULTANT103/22/2026
186 KT403/21/2026
MYRIAD RESTAURANT GROUP103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2019$37.4M—186 FRANKLIN STREET LLC → FRANKLIN STREET LOFTS LLC$1,513/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING P.C.203/24/2026
KUSHNER STUDIOS1312/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS1303/21/2026
ADAM MAISER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTA PLBG & HTG CORPPlumbing507/08/2026
GLENNS PLUMBING SVCS INCPlumbing407/08/2026
FRANKLYLOFTY CONSTRUCTIONGeneral Contractor307/08/2026
HI-RITE ELECTRIC CORPElectrical203/22/2026
BUILT NYG INCGeneral Contractor104/09/2026
WORD OF LIGHT ELECT LLCElectrical103/22/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL CITY ENGINEERING PC7115203/24/2026
BFS ARCHITECT PC7477512/07/2023
CROSSCHECK INSPECTION SER544509/08/2021
SHAHRISH CONSULTING LLC5702210/01/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBUILT NYG INC02/17/2026
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC11/02/2023
DOB NOWMechanical SystemsSigned-offFRANKLYLOFTY CONSTRUCTION10/27/2023
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC06/14/2023
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC03/30/2023
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION03/30/2023
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC02/03/2023
DOB NOWGeneral ConstructionSigned-offFRANKLYLOFTY CONSTRUCTION01/12/2023
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP05/18/2021
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP05/13/2021
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP10/26/2020
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP08/27/2020
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP10/19/2019
BISOTISSUEDFORTIS CAPITAL CONS INC12/18/2020
BISOTISSUEDFORTIS CAPITAL CONS INC10/12/2020
BISOTISSUEDFORTIS CAPITAL CONS INC09/29/2020
BISOTISSUEDFORTIS CAPITAL CONS INC09/29/2020
BISPLISSUEDARISTA PLBG & HTG CORP09/17/2020
BISOTISSUEDFORTIS CAPITAL CONS INC08/20/2020
BISSPISSUEDGO PRO FIRE PROTECTION C02/03/2020
BISOTISSUEDFORTIS CAPITAL CONS INC10/04/2019
BISOTISSUEDFORTIS CAPITAL CONS INC10/04/2019
BISPLISSUEDARISTA PLBG & HTG CORP09/20/2019
BISOTISSUEDGLOBAL GREEN ENERGY INC08/29/2019
BISPLRE-ISSUEDBORIS MECHANICAL INC05/11/2018
BISOTISSUEDNEW CLASSIC RESTORATION L04/10/2018
BISPLISSUEDAMOK INC03/14/2014
BISPLISSUEDAMOK INC03/14/2014
BISSPISSUEDAMOK INC03/14/2014
BISMHISSUEDSTATEWIDE REFRIGERATION C10/31/2013
BIS—ISSUEDCLASSIC RESTORATION CORP06/27/2013
BISOTISSUEDCLASSIC RESTORATION CORP06/25/2013
BIS—ISSUEDCLASSIC RESTORATION CORP02/12/2013
BISPLISSUEDAMOK INC12/12/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/07/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT11/02/2012
BISOTISSUEDCLASSIC RESTORATION CORP10/18/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT10/16/2012
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT10/10/2012
BISSPISSUEDAMOK INC09/28/2012
+ 23 more permits on file
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/24/2026Tenant Protection Plan ComplianceLiangkai Xiaspecial
03/24/2026Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
03/24/2026FinalLiangkai Xiaprogress
03/24/2026Mechanical SystemsLiangkai Xiaspecial
03/24/2026Exhaust and Vent Systems in Plenums and DuctsLiangkai Xiaspecial
03/02/2026Exhaust and Vent Systems in Plenums and DuctsLiangkai Xiaspecial
03/02/2026FinalLiangkai Xiaprogress
03/02/2026Tenant Protection Plan Compliance—special
03/02/2026Mechanical SystemsLiangkai Xiaspecial
03/02/2026Fire-Resistant Penetrations and JointsLiangkai Xiaspecial
12/05/2023Fire-Resistant Penetrations and JointsBelal Salimspecial
12/05/2023Tenant Protection Plan Compliance—special
09/06/2023Fire-Resistant Penetrations and JointsBelal Salimspecial
03/10/2023Mechanical SystemsBelal Salimspecial
03/10/2023FinalBelal Salimprogress
03/10/2023Tenant Protection Plan ComplianceBelal Salimspecial
02/15/2023FinalBelal Salimprogress
02/15/2023Tenant Protection Plan ComplianceBelal Salimspecial
12/12/2022Tenant Protection Plan ComplianceBelal Salimspecial
10/06/2022FinalBelal Salimprogress
09/10/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/31/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/30/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/02/2020Fire-Resistant Penetrations and JointsShahrish Shuvospecial
09/30/2020Fire-Resistant Penetrations and JointsShahrish Shuvospecial
▾Documents — 443 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch8
09/01/2026M08017072-S1Request digital key ↗
09/01/2026M08017072-I1Request digital key ↗
08/28/2026M00829731-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00205378-I1Request digital key ↗
09/04/2026M00339022-P2Request digital key ↗
09/04/2026M00339022-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION52
10/29/2020140910218Open ↗
10/01/2020123761036Open ↗
10/01/2020140910218Open ↗
Showing 3 of 52 on file for this type
▸BISWORK PERMIT APPLICATION29
10/12/2020140950095Open ↗
08/20/2020140910218Open ↗
02/03/2020123806266Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWLPC Approval/Permit15
09/04/2026M00339022-P2Open ↗
09/04/2026M00339022-P1Open ↗
08/15/2026M00339022-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPLACE OF ASSEMBLY2
10/16/2014120847833Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
10/01/2019123806266Open ↗
10/01/2019123806266Open ↗
08/29/2019123662198Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026M01324856-P1Open ↗
09/25/2026M01324856-P1Open ↗
09/25/2026M01324856-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/04/2026M00339022-P2Open ↗
09/04/2026M00339022-I1Open ↗
09/04/2026M00339022-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/25/2026M01324856-P1Open ↗
09/23/2026M01324856-I1Open ↗
09/02/2026M00829731-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
▸Trade Schedules & Equipment37
▸BISSELF-CERT PLUMBING NOTICE9
02/11/2015120631165Open ↗
04/14/2014121335652Open ↗
04/07/2014120631165Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
09/26/2019123761036Open ↗
06/26/2019123761036Open ↗
05/03/2019123806266Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
10/23/2020123761036Open ↗
10/01/2020123761036Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
07/02/2015122415252Open ↗
07/02/2015122415252Open ↗
Showing 2 of 5 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
06/02/2022140910218Open ↗
06/28/2021123761036Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL2
06/02/2022140910218Open ↗
06/28/2021123761036Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
04/04/2014121377492Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/15/2019123806266Open ↗
▸Safety & Tenant Protection15
▸DOB NOWTenant Protection Plan7
09/04/2026M00339022-P2Open ↗
09/04/2026M00339022-P1Open ↗
08/15/2026M00339022-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes6
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
09/13/2019123806266Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/04/2026M00339022-P1Open ↗
09/04/2026M00339022-P2Open ↗
09/03/2026M00386218-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
08/15/2019123806266Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/14/2019121226761Open ↗
02/09/2018121226761Open ↗
07/02/2015122415252Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
08/23/2019123761045Open ↗
08/14/2019123761045Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/02/2022140910218Open ↗
09/10/2021140950095Open ↗
06/28/2021123761036Open ↗
Showing 3 of 8 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7201
12/16/2019121483064Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs47
▸BISLETTERS - SUPPORTING DOCUMENTATION12
09/10/2020140950095Open ↗
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL12
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
08/29/2019123662198Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
06/03/2022140910218Open ↗
09/10/2021140950095Open ↗
06/28/2021123761036Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
12/15/2017121226761Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT25
06/02/2022140910218Open ↗
09/10/2021140950095Open ↗
06/28/2021123761036Open ↗
Showing 3 of 25 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
10/06/2020140950095Open ↗
▸Filing & Intake Forms58
▸BISADDITIONAL INFORMATION21
01/08/2021140910218Open ↗
12/28/2020140910218Open ↗
12/07/2020140910218Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM18
02/04/2020103863918Open ↗
12/16/2019103863918Open ↗
09/26/2019123761036Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET17
08/29/2019123662198Open ↗
08/14/2019123761045Open ↗
06/26/2019123761036Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/10/2020140950095Open ↗
06/16/2020140910218Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
10/28/2020123761036Open ↗
09/16/2020140910218Open ↗
09/01/2020140910218Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026M00829731-I1Open ↗
08/13/2026M01324856-P1Open ↗
08/13/2026M01324856-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDHCR Document2
08/13/2026M01324856-I1Open ↗
08/13/2026M01324856-P1Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type