Elevator apt, semi-fireproof with stores
186 GRAND STREET
MANHATTAN · SoHo-Little Italy-Hudson Square · BIN 1006970
💬 Discuss this project
1900Year Built
6Stories
D7Building Class
C6-2GZoning
15,833 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 186 MULBERRY LLC · 2,485 sf lot · 6.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 56p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
186 MULBERRY2503/22/2026
KEN CHEUNG REALTY103/22/2026
KEN CHENG REALTY CONST CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JORGE I AGUIRRE, P.E.501/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRAXIS WORKSHOP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BECKMAN STUDIO DESIGN BUIGeneral Contractor303/21/2026
HVAC EXPERTS, INCGeneral Contractor104/09/2026
APOLLO PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COMPLY BUILDING GROUP8622501/07/2026
Building Lifecycle
All (76)Filed (5)Permit Issued (3)Violation (26)Inspection (6)Objection (16)Special Inspection (20)
04/29/2026
Violation issued (HPD, closed)
A
03/05/2026
Permit issued — Mechanical Systems
M01139989-S2-MS
01/29/2026
Objection resolved — Addressed
01/23/2026
Objection raised — Admin
01/07/2026
Filed — Alteration
Plumbing work in conjunction with General Construction DOB# M01139989-I1 for the renovation work of the 5th-floor apartment unit. There are no changes in use or occupancy under this application.
M01139989-S2
12/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
12/26/2025
Special inspection requirement — Lighting in dwelling units
ANA ACCETTA
12/26/2025
Special inspection requirement — Interior lighting power
ANA ACCETTA
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
ANA ACCETTA
12/26/2025
Special inspection requirement — Final
ANA ACCETTA
12/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANA ACCETTA
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
ANA ACCETTA
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANA ACCETTA
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANA ACCETTA
12/16/2025
Special inspection requirement — Maintenance information
ANA ACCETTA
12/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
ANA ACCETTA
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Special inspection requirement — Final
ANA ACCETTA
12/12/2025
Special inspection requirement — Mechanical Systems
ANA ACCETTA
12/02/2025
Objection raised — Other
12/02/2025
Objection raised — Other
11/18/2025
Filed — Alteration
Plumbing work in conjunction with General Construction DOB# M01139989-I1 for the renovation work of the 5th-floor apartment unit. There are no changes in use or occupancy under this application.
M01139989-P1
11/04/2025
Filed — Alteration
Plumbing work in conjunction with General Construction DOB# M01139989-I1 for the renovation work of the 5th-floor apartment unit. There are no changes in use or occupancy under this application.
M01139989-P2
10/02/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
ANA ACCETTA
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANA ACCETTA
10/01/2025
Special inspection requirement — Interior lighting power
ANA ACCETTA
10/01/2025
Special inspection requirement — Lighting in dwelling units
ANA ACCETTA
10/01/2025
Special inspection requirement — Final
ANA ACCETTA
04/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2025
Permit issued — Plumbing
M01139989-S1-PL
02/26/2025
Objection resolved — Addressed
02/26/2025
Objection resolved — Addressed
02/26/2025
Objection resolved — Addressed
02/26/2025
Objection resolved — Addressed
02/26/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Plumbing
02/07/2025
Objection raised — Plumbing
02/07/2025
Objection raised — Admin
02/07/2025
Objection raised — Plumbing
02/07/2025
Objection raised — Other
01/30/2025
Filed — Alteration
Plumbing work in conjunction with General Construction DOB# M01139989-I1 for the renovation work of the 5th-floor apartment unit. There are no changes in use or occupancy under this application.
M01139989-S1
01/17/2025
Permit issued — General Construction
M01139989-I1-GC
11/27/2024
Filed — Alteration
Plumbing work in conjunction with General Construction DOB# M01139989-I1 for the renovation work of the 5th-floor apartment unit. There are no changes in use or occupancy under this application.
M01139989-I1
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHVAC EXPERTS, INC03/05/2026
DOB NOWPlumbingPermit IssuedAPOLLO PLBG & HTG INC03/21/2025
DOB NOWGeneral ConstructionPermit IssuedBECKMAN STUDIO DESIGN BUI01/17/2025
BISBLISSUEDACCESS PLBG & HTG CORP03/29/2016
BISPLISSUEDACCESS PLBG & HTG CORP11/18/2015
BISPLISSUEDACCESS PLBG & HTG CORP11/18/2015
BISBLISSUEDACCESS PLBG & HTG CORP05/13/2015
BISOTISSUEDBECKMAN STUDIO DESIGN BUI08/28/2014
BIS—ISSUEDBECKMAN STUDIO DESIGN BUI08/28/2014
BISMHISSUEDBECKMAN STUDIO DESIGN BUI08/28/2014
BISPLISSUEDACCESS PLBG & HTG CORP08/19/2014
BISSPISSUEDACCESS PLBG & HTG CORP07/31/2014
BISMHISSUEDBECKMAN STUDIO DESIGN BUI07/30/2014
BIS—ISSUEDBECKMAN STUDIO DESIGN BUI06/02/2014
BISOTISSUEDBECKMAN STUDIO DESIGN BUI06/02/2014
BISPLISSUEDACCESS PLBG & HTG CORP08/08/2013
BISOTISSUEDBECKMAN STUDIO DESIGN BUI05/20/2013
BIS—ISSUEDBECKMAN STUDIO DESIGN BUI05/20/2013
BISBLISSUEDACCESS PLBG & HTG CORP01/23/2013
BISFPISSUEDNY FIRE LLC08/06/2012
BISPLISSUEDACCESS PLBG & HTG CORP06/15/2012
BIS—ISSUEDBECKMAN STUDIO DESIGN BUI05/15/2012
BISOTISSUEDBECKMAN STUDIO DESIGN BUI05/15/2012
BISPLISSUEDACCESS PLBG & HTG CORP04/27/2012
BISOTISSUEDBECKMAN STUDIO DESIGN BUI04/25/2012
BISEQISSUEDEVEREST SCAFFOLDING INC04/08/2011
BISEQISSUEDEVEREST SCAFFOLDING INC04/08/2011
BISOTISSUEDBECKMAN STUDIO DESIGN BUI01/18/2011
BISPLISSUEDACCESS PLBG & HTG CORP12/28/2010
BISOTISSUEDBECKMAN STUDIO DESIGN BUI12/14/2010
BIS—ISSUEDBECKMAN STUDIO DESIGN BUI08/03/2010
BISOTISSUEDH&M CONTRACTORS INC10/06/2009
BISEQISSUEDOUTDOOR INSTALLATIONS LLC05/30/2007
BISOTISSUEDBERGER SIGNS INC.07/20/2005
BISOTISSUEDBERGER SIGNS INC.07/20/2005
BISOTISSUEDBERGER SIGNS INC.07/20/2005
BISOTISSUEDCLEAR COMMUNICATIONS GROUP05/14/2001
BIS—ISSUEDWAI-LAN MOK YOUNG01/03/2001
BISEQISSUEDNYC. CONST. INC.10/16/2000
1 project · most recent 01/07/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/07/2026Permit IssuedHVAC EXPERTS, INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PEFY-L12NMAU-A 13,500 BTU · Vrf Indoor ×2
MXZ-SM60NL 66,000 BTU · Heat Pump Outdoor ×1
PEFY-L08NMSU-A 8,900 BTU · Vrf Indoor ×1
PEFY-L36NMAU-A 40,000 BTU · Vrf Indoor ×1
Ventilation
Greenheck CSP-B90 50 CFM · Exhaust Fan ×3
SP-A 150 CFM · Exhaust Fan ×1
1 project · most recent 01/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/07/2026Permit IssuedAPOLLO PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 04/26/2026
General Wiring Lighting
FiledStatusContractorScope
04/26/2026Permit IssuedY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/02/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/26/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
12/26/2025Lighting in dwelling unitsANA ACCETTAenergy_progress
12/26/2025Interior lighting powerANA ACCETTAenergy_progress
12/26/2025Energy Code Compliance InspectionsANA ACCETTAprogress
12/26/2025FinalANA ACCETTAprogress
12/16/2025HVAC-R and service water heating system controlsANA ACCETTAenergy_progress
12/16/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
12/16/2025Energy Code Compliance InspectionsANA ACCETTAprogress
12/16/2025HVAC-R and service water piping design and insulationANA ACCETTAenergy_progress
12/16/2025HVAC-R and service water heating equipmentANA ACCETTAenergy_progress
12/16/2025Maintenance informationANA ACCETTAenergy_progress
12/16/2025Duct leakage testing, insulation and designANA ACCETTAenergy_progress
12/12/2025FinalANA ACCETTAprogress
12/12/2025Mechanical SystemsANA ACCETTAspecial
10/01/2025Energy Code Compliance InspectionsANA ACCETTAprogress
10/01/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
10/01/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
10/01/2025Interior lighting powerANA ACCETTAenergy_progress
10/01/2025Lighting in dwelling unitsANA ACCETTAenergy_progress
10/01/2025FinalANA ACCETTAprogress
▾Documents — 234 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026M01139989-I1Request digital key ↗
08/25/2026M01139989-P1Request digital key ↗
08/25/2026M01139989-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits57
▸BISPLAN / WORK APPROVAL APPLICATION34
12/31/2020121718597Open ↗
07/13/2020121718597Open ↗
01/18/2017110362697Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION19
04/13/2016121177154Open ↗
05/15/2015121177154Open ↗
09/05/2014120488999Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY4
12/31/2020121718597Open ↗
07/13/2020121718597Open ↗
03/27/2017121718597Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/27/2017121718597Open ↗
12/20/2016120488999Open ↗
12/05/2016120488999Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M01139989-S2Open ↗
09/23/2026M01139989-S2Open ↗
09/23/2026M01139989-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026M01139989-P1Open ↗
08/25/2026M01139989-I1Open ↗
08/25/2026M01139989-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026M01139989-S2Open ↗
09/23/2026M01139989-S2Open ↗
09/02/2026M01139989-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/02/2011120590672Open ↗
02/01/2011120590725Open ↗
10/07/2010120488999Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
02/02/2011120590672Open ↗
02/01/2011120590725Open ↗
10/07/2010120488999Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING11
11/04/2013120488999Open ↗
10/23/2013120488999Open ↗
03/07/2013121511195Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
04/16/2015121511195Open ↗
04/16/2015121511195Open ↗
04/16/2015121511195Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT8
02/18/2016121177154Open ↗
02/18/2016121177154Open ↗
02/19/2013121177154Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
06/04/2015121511195Open ↗
02/11/2015121511195Open ↗
11/26/2012120488999Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/21/2016102798634Open ↗
09/06/2016120488999Open ↗
07/12/2016120488999Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/07/2012121159021Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
03/10/2015121511195Open ↗
▸BISEQUIPMENT USE PERMITS1
03/11/2015121511195Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
09/18/2009120160351Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026M01139989-S1Open ↗
08/25/2026M01139989-P1Open ↗
08/25/2026M01139989-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
07/18/2011120756404Open ↗
11/29/2010120488999Open ↗
10/07/2010120488999Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/02/2011120590672Open ↗
02/01/2011120590725Open ↗
09/18/2009120160351Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
08/27/2012121177154Open ↗
08/27/2012121177154Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/16/2015121511195Open ↗
03/07/2013121511195Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/16/2015121511195Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
05/10/2017120488999Open ↗
02/07/2017120488999Open ↗
02/07/2017120488999Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
03/07/2013121511195Open ↗
07/24/2012121159021Open ↗
07/18/2011120756404Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/13/2020121718597Open ↗
03/27/2017121718597Open ↗
08/08/2014121511195Open ↗
Showing 3 of 7 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
03/11/2014121718597Open ↗
05/15/2014121718597Open ↗
▸BISSUPERSEDING LETTER1
08/26/2020121718597Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
12/05/2016120488999Open ↗
07/25/2016121177154Open ↗
04/16/2015121511195Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION11
02/12/2021121718597Open ↗
01/27/2021121718597Open ↗
01/22/2021121718597Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET7
03/07/2013121511195Open ↗
08/07/2012121177154Open ↗
07/24/2012121159021Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM1
07/13/2020121718597Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
03/27/2017121718597Open ↗
04/13/2011120590672Open ↗
04/13/2011120590725Open ↗
▸BISLOFT BOARD CERTIFICATE1
11/15/2012121177154Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
12/21/2015120488999Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/25/2011120590725Open ↗