← Back
Four families
186 ST MARKS AVENUE
BROOKLYN · BIN 3028408
💬 Discuss this project
1893Year Built
4Stories
C3Building Class
R6BZoning
4,640 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: TOWNHOUSE RENTAL VII, L.L.C. · 2,565 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof43p · 1 filing · 20 docs
Floor 437p · 1 filing · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 238p · 1 filing · 20 docs
Floor 140p · 1 filing · 20 docs
Cellar41p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOWNHOUSE RENTAL VII, L.L.C.203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2024$7.0M—186 VENTURES LLC → TOWNHOUSE RENTAL II, L.L.C.$1,509/sf building
11/16/2022$3.1M—Private party → 186 VENTURES LLC$668/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL CHRISTAKOS ARCHITECTURE901/02/2024
BGM ENGINEERING101/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VADEM BRODSKY803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HLB CONSTRUCTION CORPGeneral Contractor1007/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514101/26/2023
Building Lifecycle
All (124)Filed (10)Permit Issued (5)Signed Off (3)Violation (22)Inspection (6)Objection (62)Special Inspection (16)
04/11/2024
Violation issued (HPD, closed)
A
01/02/2024
Filed — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-P6
12/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/29/2023
Signed off — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-S2
11/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2023
Signed off — Alteration
INTERIOR, NON-STRUCTURAL DEMOLITION OF EXISTING 3-FAMILY DWELLING. NO CHANGE TO ZONING, USE, OR EGRESS.
B08041754-I1
11/17/2023
Filed — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-P5
11/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Christakos
11/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Christakos
11/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Christakos
11/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Christakos
11/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Christakos
11/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Christakos
11/13/2023
Objection raised — Other
11/13/2023
Objection resolved — Addressed
11/13/2023
Objection raised — Other
11/13/2023
Objection resolved — Addressed
11/07/2023
Objection resolved — Addressed
10/31/2023
Signed off — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-S1
10/30/2023
Objection raised — Other
10/25/2023
Objection raised — Other
10/25/2023
Objection resolved — Addressed
10/23/2023
Filed — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-P4
10/20/2023
Objection resolved — Addressed
10/20/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Other
10/16/2023
Objection resolved — Addressed
10/11/2023
Objection raised — Other
10/08/2023
Objection resolved — Addressed
10/08/2023
Objection resolved — Addressed
10/08/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
10/03/2023
Objection raised — Scope
10/03/2023
Objection raised — Zoning
10/03/2023
Objection raised — Zoning
10/03/2023
Objection raised — Zoning
10/01/2023
Filed — Alteration CO
PLUMBING WORK FILED AS SUBSEQUENT FILING WITH ALTERATION DOBNOW JOB NO. B08025966-I1
B08025966-P3
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
09/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Christakos
09/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Christakos
09/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Christakos
09/20/2023
Objection raised — Accessibility
09/20/2023
Objection raised — Admin
09/20/2023
Objection raised — Scope
09/20/2023
Objection raised — Zoning
09/20/2023
Objection raised — Accessibility
09/20/2023
Objection raised — Scope
09/20/2023
Objection raised — Scope
09/20/2023
Objection raised — Zoning
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHLB CONSTRUCTION CORP04/14/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/27/2023
DOB NOWFoundationSigned-offHLB CONSTRUCTION CORP02/02/2023
DOB NOWGeneral ConstructionPermit IssuedHLB CONSTRUCTION CORP01/14/2023
DOB NOWGeneral ConstructionSigned-offHLB CONSTRUCTION CORP12/05/2022
1 project · most recent 01/02/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/02/2024Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
1 project · most recent 11/30/2023
General Wiring
FiledStatusContractorScope
11/30/2023CompleteAMERICAN POWER ELECT CONSGeneral Wiring
1 project · most recent 01/02/2024
Steel
FiledStatusContractorScope
01/02/2024Signed-offPLBG P & H INCSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/17/2023HVAC-R and service water heating system controlsPaul Christakosenergy_progress
11/17/2023HVAC-R and service water piping design and insulationPaul Christakosenergy_progress
11/17/2023HVAC-R and service water heating equipmentPaul Christakosenergy_progress
11/17/2023HVAC-R and service water heating system controlsPaul Christakosenergy_progress
11/17/2023HVAC-R and service water heating equipmentPaul Christakosenergy_progress
11/17/2023HVAC-R and service water piping design and insulationPaul Christakosenergy_progress
09/29/2023HVAC-R and service water piping design and insulationPaul Christakosenergy_progress
09/29/2023HVAC-R and service water heating equipmentPaul Christakosenergy_progress
09/29/2023HVAC-R and service water heating system controlsPaul Christakosenergy_progress
01/24/2023Structural Cold-Formed SteelRAUL VELASQUEZ MARTINEZspecial
01/24/2023Construction Operations Influencing Adjacent StructuresRAUL VELASQUEZ MARTINEZspecial
01/24/2023Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
01/24/2023Footing and FoundationRAUL VELASQUEZ MARTINEZprogress
01/24/2023FinalRAUL VELASQUEZ MARTINEZprogress
01/24/2023Structural Steel - DetailsRAUL VELASQUEZ MARTINEZspecial
12/02/2022FinalPaul Christakosprogress
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08041754-I1Request digital key ↗
08/26/2026B08025966-S2Request digital key ↗
08/26/2026B08025966-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/13/2026B08025966-P3Open ↗
08/13/2026B08025966-I1Open ↗
08/13/2026B08025966-S1Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08025966-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B08025966-P5Open ↗
09/01/2026B08025966-P5Open ↗
09/01/2026B08025966-P5Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B08025966-P5Open ↗
08/26/2026B08025966-I1Open ↗
08/26/2026B08025966-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B08025966-S1Open ↗
08/23/2026B08025966-S1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/26/2026B08025966-P6Open ↗
08/15/2026B08025966-P1Open ↗
08/15/2026B08025966-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026B08025966-I1Open ↗
08/13/2026B08025966-S1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08025966-S1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026B08025966-P5Open ↗
08/26/2026B08025966-S2Open ↗
08/26/2026B08025966-P3Open ↗
Showing 3 of 10 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/26/2026B08025966-P6Open ↗
08/15/2026B08025966-P1Open ↗
08/15/2026B08025966-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08025966-S1Open ↗