Walk-up apt, over six families with stores
Williamsburg Houses
202 GRAHAM AVENUE · BIN 3344948
💬 Discuss this project
1938Year Built
4Stories
C7Building Class
R6Zoning
345,248 sfGross Floor Area
486Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: WILLIAMSBURG PACT LLC · 283,200 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Roof6p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 41p · 1 filing · 8 docs
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 13p · 2 filings · 20 docs
Cellar2p · 2 filings · 14 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
170 FROEHLICH FARM BLVD W203/22/2026
MDG DESIGN CONSTR203/22/2026
NYCHA203/21/2026
GEOMAR REALTY INC103/21/2026
NYC HOUSING AUTHORITY203/21/2026
MDG DESIGN + CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHARIS CONSULTING803/21/2026
DVA Advisors603/21/2026
WILLIAM VITACCO ASSOCIATES403/21/2026
A1 EXPEDITING SERVICE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MDG DESIGN & CONSTR LLCGeneral Contractor507/08/2026
SNS ORGNIZATION LTDGeneral Contractor303/21/2026
DELCO ELECTRICAL CORP.Electrical303/22/2026
YARKS NYC INCGeneral Contractor207/08/2026
KTB ELECTRIC INC.Electrical103/22/2026
SIMETI, SALVATOREElectrical103/21/2026
TRADELINE PLUMBING INCPlumbing107/08/2026
A1 EXPEDITING SERVICE CORElectrical103/21/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
CRAIG, RISHIElectrical103/21/2026
FOY, REMERElectrical103/21/2026
H&F IRON WORKSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LORJAN AGALLIU ARCHITECT61041011/13/2023
DOMANI INSPECTION SERVICE843209/01/2023
Building Lifecycle
All (112)Filed (14)Permit Issued (8)Signed Off (7)Violation (6)Inspection (5)Objection (42)Special Inspection (30)
02/27/2025
Signed off — Alteration
Interior renovations to include the demo & replacement of existing plumbing fixtures, kitchen appliances, millwork and windows. Additional partition removal and construction to meet UFAS requirements. New ADA accessible entrances being provided.
B08003173-I1
02/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/18/2024
Signed off — Alteration
Additions & modification to existing plumbing system and related piping. Filed in conjunction with GC #B00492025-I1 & MS #B00492752-I1. No change in use, egress or occupancy.
B00493462-I1
11/22/2024
Permit issued — General Construction
B08003173-I1-GC
10/25/2024
Objection raised — Other
10/25/2024
Objection resolved — Addressed
10/15/2024
Filed — Alteration
Interior renovations to include the demo & replacement of existing plumbing fixtures, kitchen appliances, millwork and windows. Additional partition removal and construction to meet UFAS requirements. New ADA accessible entrances being provided.
B08003173-P1
08/23/2024
Signed off — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00764949-I1
08/09/2024
Signed off — Alteration
All plumbing work in tank room of boiler room associated plumbing (Domestic Hot & Cold Valves) install (3) new Turbo Max. (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727255-I1
08/06/2024
Signed off — Alteration
Additions / modifications to existing HVAC system and related piping. Filed in conjunction with GC #B00492025-I1 & PL #B00493462-I1. No change in use, egress or occupancy.
B00492752-I1
02/15/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00818123-I1
01/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2024
Permit issued — Plumbing
B00727255-I1-PL
12/12/2023
Signed off — Alteration
B00492025-I1
12/11/2023
Objection resolved — Addressed
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
11/27/2023
Objection resolved — Addressed
11/21/2023
Objection raised — Scope
11/13/2023
Filed — Alteration
Additions & modification to existing plumbing system and related piping. Filed in conjunction with GC #B00492025-I1 & MS #B00492752-I1. No change in use, egress or occupancy.
B00493462-P3
10/13/2023
Violation issued (ECB, closed)
Construction
09/20/2023
Objection raised — Other
09/13/2023
Filed — Alteration
Interior renovations to include the demo & replacement of existing plumbing fixtures, kitchen appliances, millwork and windows. Additional partition removal and construction to meet UFAS requirements. New ADA accessible entrances being provided.
B08003173-I1
09/08/2023
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (ECB, closed)
Construction
09/08/2023
Violation issued (ECB, closed)
Construction
09/08/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2023
Filed — Alteration
INSTALLATION OF ACCESSIBLE RAMPS ON EXTERIOR OF BUILDING. THE STRUCTURAL DESIGN WORK DOES NOT CONSTITUTE ADDITION TO THE EXISTING BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00764949-P1
09/01/2023
Special inspection requirement — Masonry
lorjan agalliu
09/01/2023
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
lorjan agalliu
09/01/2023
Special inspection requirement — Interior lighting power
lorjan agalliu
09/01/2023
Special inspection requirement — Lighting controls
lorjan agalliu
09/01/2023
Special inspection requirement — Lighting in dwelling units
lorjan agalliu
09/01/2023
Special inspection requirement — Exterior lighting power
lorjan agalliu
09/01/2023
Special inspection requirement — Energy Code Compliance Inspections
lorjan agalliu
09/01/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Hadiprawira Djohan
09/01/2023
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
lorjan agalliu
09/01/2023
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Footing and Foundation
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Final
JOHN MCMONAGLE
09/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
lorjan agalliu
09/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
lorjan agalliu
09/01/2023
Special inspection requirement — Final
lorjan agalliu
08/31/2023
Filed — Alteration
B00492025-P3
08/08/2023
Special inspection requirement — Final
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Footing and Foundation
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
08/08/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Hadiprawira Djohan
08/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2023
Special inspection requirement — Final
lorjan agalliu
07/26/2023
Filed — Alteration
All plumbing work in tank room of boiler room associated plumbing (Domestic Hot & Cold Valves) install (3) new Turbo Max. (2) HWCP (Hot Water Circulating Pumps), Mixing Valves (TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00727255-I1
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC11/22/2024
DOB NOWPlumbingSigned-offTRADELINE PLUMBING INC01/04/2024
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/20/2023
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC07/05/2023
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD06/14/2023
DOB NOWGeneral ConstructionSigned-offMDG DESIGN & CONSTR LLC05/19/2023
DOB NOWSidewalk ShedSigned-offYARKS NYC INC02/15/2023
DOB NOWSidewalk ShedSigned-offYARKS NYC INC01/27/2023
BISPLISSUEDRAYTONE PLBG SPEC INC03/21/2006
6 projects · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025CompleteDELCO ELECTRICAL CORP.General Wiring
07/16/2025CompleteDELCO ELECTRICAL CORP.General Wiring
07/12/2025CompleteKTB ELECTRIC INC.General Wiring
08/28/2023CompleteDELCO ELECTRICAL CORP.General Wiring
08/28/2023CompleteDELCO ELECTRICAL CORP.General Wiring
10/09/2020CompleteJEMCO ELECT. CONTRS INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
12/11/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
09/01/2023Masonrylorjan agalliuspecial
09/01/2023Post-installed AnchorsJOHN MCMONAGLEspecial
09/01/2023Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
09/01/2023Interior lighting powerlorjan agalliuenergy_progress
09/01/2023Lighting controlslorjan agalliuenergy_progress
09/01/2023Lighting in dwelling unitslorjan agalliuenergy_progress
09/01/2023Exterior lighting powerlorjan agalliuenergy_progress
09/01/2023Energy Code Compliance Inspectionslorjan agalliuprogress
09/01/2023Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
09/01/2023Subsurface Investigations (Borings/Test Pits)Hadiprawira Djohanspecial
09/01/2023Subgrade InspectionsJOHN MCMONAGLEspecial
09/01/2023Tenant Protection Plan Compliancelorjan agalliuspecial
09/01/2023Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
09/01/2023Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
09/01/2023Footing and FoundationJOHN MCMONAGLEprogress
09/01/2023FinalJOHN MCMONAGLEprogress
09/01/2023Fire-Resistance Rated Constructionlorjan agalliuprogress
09/01/2023Fire-Resistant Penetrations and Jointslorjan agalliuspecial
09/01/2023Finallorjan agalliuprogress
08/08/2023FinalJOHN MCMONAGLEprogress
08/08/2023Footing and FoundationJOHN MCMONAGLEprogress
08/08/2023Subgrade InspectionsJOHN MCMONAGLEspecial
08/08/2023Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
08/08/2023Post-installed AnchorsJOHN MCMONAGLEspecial
Latest 25 of 54.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026B00492752-I1Request digital key ↗
08/31/2026B00493462-P1Request digital key ↗
08/31/2026B00492025-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit12
08/31/2026B00492752-I1Open ↗
08/31/2026B00493462-P1Open ↗
08/15/2026B00764949-I1Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026B00764949-P1Open ↗
08/28/2026B00492025-P3Open ↗
08/28/2026B00492025-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00727255-I1Open ↗
08/31/2026B00764949-P1Open ↗
08/31/2026B00764949-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00492752-I1Open ↗
08/31/2026B00493462-P3Open ↗
08/31/2026B00493462-P1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026B00492752-I1Open ↗
08/31/2026B00492025-I1Open ↗
08/15/2026B00493462-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026B00727255-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00492025-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/15/2026B00764949-I1Open ↗
08/13/2026B00764949-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00764949-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/31/2026B00492752-I1Open ↗
08/31/2026B00493462-P1Open ↗
08/31/2026B00492025-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00492752-I1Open ↗
08/31/2026B00492025-I1Open ↗
08/15/2026B00493462-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00818123-P1Open ↗
▸Other Documents6
▸DOB NOWProof of Historic Building4
08/15/2026B00764949-I1Open ↗
08/13/2026B08003173-I1Open ↗
08/13/2026B08003173-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026B00818123-I1Open ↗
08/13/2026B00818123-P1Open ↗