← Back
Two family brick
186 WEST 9 STREET
💬 Discuss this project
1901Year Built
3Stories
B1Building Class
R6BZoning
2,250 sfGross Floor Area
2Units
Two family brick · 1,875 sf lot · 1.2 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingFire Protection
Floor 311p · 2 filings · 20 docs
Floor 29p · 1 filing · 20 docs
Floor 111p · 2 filings · 20 docs
Cellar9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/05/2022$1.9M—BABEL REAL ESTATE CORPORATION → Private party$840/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOLLINGEN LLC307/28/2023
APPLIED HVAC ENGINEERING, PLLC207/28/2023
IVAN HEREDIA ARCHITECT312/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SQUARE ELEMENT ARCHITECTURE P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JBJ CONCRETE RENOVATIONSGeneral Contractor203/21/2026
PRO STAR PLBG,HTG&MECH INPlumbing207/08/2026
FIVE BORO ASSOCIATES INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
APPLIED HVAC ENGINEERING,7563807/28/2023
OUTSOURCE SPECIAL INSPECT2827112/23/2022
Building Lifecycle
All (77)Filed (8)Permit Issued (4)Signed Off (2)Inspection (7)Objection (26)Special Inspection (30)
04/03/2024
Signed off — Alteration
HEREWITH FILING FOR NEW SPRINKLER SYSTEM AS PER PLANS IN CONJUNCTION WITH ALT CO # B00729446
B00777000-I1
03/27/2024
Signed off — Alteration
HEREWITH FILING FOR PLUMBING MODIFICATIONS TO INCLUDE REMOVAL AND INSTALLATION OF NEW FIXTURES AS PER PLANS
B00745550-I1
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
08/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Ivan Heredia
08/21/2023
Objection resolved — Addressed
08/04/2023
Objection resolved — Resolved
08/03/2023
Objection raised — Admin
08/03/2023
Objection raised — Other
07/28/2023
Filed — Alteration
HEREWITH FILING FOR PLUMBING MODIFICATIONS TO INCLUDE REMOVAL AND INSTALLATION OF NEW FIXTURES AS PER PLANS
B00745550-P2
07/28/2023
Filed — Alteration
HEREWITH FILING FOR NEW SPRINKLER SYSTEM AS PER PLANS IN CONJUNCTION WITH ALT CO # B00729446
B00777000-P1
07/26/2023
Special inspection requirement — Sprinkler Systems
Alexandra Herrera
07/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
06/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ivan Heredia
01/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Ivan Heredia
01/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ivan Heredia
01/20/2023
Special inspection requirement — Fenestration areas
Ivan Heredia
01/20/2023
Special inspection requirement — Air barrier - visual inspection
Ivan Heredia
01/20/2023
Special inspection requirement — Interior lighting power
Ivan Heredia
01/20/2023
Special inspection requirement — Lighting in dwelling units
Ivan Heredia
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
01/18/2023
Filed — Alteration CO
B00729446-P2
01/16/2023
Special inspection requirement — Air barrier - visual inspection
Ivan Heredia
01/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Ivan Heredia
01/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Ivan Heredia
01/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Ivan Heredia
01/16/2023
Special inspection requirement — Interior lighting power
Ivan Heredia
01/16/2023
Special inspection requirement — Lighting in dwelling units
Ivan Heredia
01/16/2023
Special inspection requirement — Fenestration areas
Ivan Heredia
01/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
01/10/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/28/2022
Filed — Alteration
HEREWITH FILING FOR PLUMBING MODIFICATIONS TO INCLUDE REMOVAL AND INSTALLATION OF NEW FIXTURES AS PER PLANS
B00745550-P1
12/23/2022
Filed — Alteration CO
B00729446-P1
12/22/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JONAR MADRIAGA
12/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexandra Herrera
12/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
Ivan Heredia
12/18/2022
Special inspection requirement — Air barrier - visual inspection
Ivan Heredia
12/18/2022
Special inspection requirement — Interior lighting power
Ivan Heredia
12/18/2022
Special inspection requirement — Lighting in dwelling units
Ivan Heredia
12/18/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Ivan Heredia
12/18/2022
Special inspection requirement — Fenestration areas
Ivan Heredia
12/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Ivan Heredia
12/15/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/05/2022
Permit issued — Sprinklers
B00777000-I1-EW-SP
09/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Permit issued — Plumbing
B00745550-I1-PL
08/02/2022
Permit issued — Plumbing
B00745550-I1-PL
07/28/2022
Objection raised — Admin
07/28/2022
Objection resolved — Addressed
07/28/2022
Objection raised — Structural
07/28/2022
Objection resolved — Addressed
07/28/2022
Objection raised — Structural
07/28/2022
Objection resolved — Addressed
07/28/2022
Objection raised — Mechanical
07/28/2022
Objection resolved — Addressed
07/28/2022
Objection raised — Scope
07/28/2022
Objection resolved — Addressed
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC10/05/2022
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN08/29/2022
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN08/02/2022
DOB NOWGeneral ConstructionPermit IssuedJBJ CONCRETE RENOVATIONS07/13/2022
2 projects · most recent 05/02/2024
General Wiring
FiledStatusContractorScope
05/02/2024CompleteKRISCORP ELECL CONTNG INCGeneral Wiring
12/09/2022CompleteKRISCORP ELECL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/25/2023Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
08/25/2023Energy Code Compliance InspectionsIvan Herediaprogress
07/26/2023Sprinkler SystemsAlexandra Herreraspecial
07/26/2023Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
01/20/2023Fire-Resistance Rated ConstructionIvan Herediaprogress
01/20/2023Energy Code Compliance InspectionsIvan Herediaprogress
01/20/2023Fenestration and door U-factor and product ratingsIvan Herediaenergy_progress
01/20/2023Fenestration areasIvan Herediaenergy_progress
01/20/2023Air barrier - visual inspectionIvan Herediaenergy_progress
01/20/2023Interior lighting powerIvan Herediaenergy_progress
01/20/2023Lighting in dwelling unitsIvan Herediaenergy_progress
01/20/2023Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
01/16/2023Air barrier - visual inspectionIvan Herediaenergy_progress
01/16/2023Energy Code Compliance InspectionsIvan Herediaprogress
01/16/2023Fire-Resistance Rated ConstructionIvan Herediaprogress
01/16/2023Fenestration and door U-factor and product ratingsIvan Herediaenergy_progress
01/16/2023Interior lighting powerIvan Herediaenergy_progress
01/16/2023Lighting in dwelling unitsIvan Herediaenergy_progress
01/16/2023Fenestration areasIvan Herediaenergy_progress
01/16/2023Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
12/22/2022Mastic and Intumescent Fire-resistant CoatingsJONAR MADRIAGAspecial
12/18/2022Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
12/18/2022Fire-Resistance Rated ConstructionIvan Herediaprogress
12/18/2022Air barrier - visual inspectionIvan Herediaenergy_progress
12/18/2022Interior lighting powerIvan Herediaenergy_progress
Latest 25 of 31.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026B00745550-P1Request digital key ↗
08/29/2026B00745550-I1Request digital key ↗
08/27/2026B00729446-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00729446-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature22
09/19/2026B00729446-P1Open ↗
09/19/2026B00729446-P1Open ↗
09/19/2026B00729446-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/19/2026B00729446-P1Open ↗
09/19/2026B00729446-P1Open ↗
08/31/2026B00745550-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/29/2026B00745550-P2Open ↗
08/29/2026B00745550-P1Open ↗
08/29/2026B00745550-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/27/2026B00729446-I1Open ↗
08/27/2026B00729446-P1Open ↗
08/27/2026B00729446-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00729446-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026B00745550-P1Open ↗
08/29/2026B00745550-I1Open ↗
08/27/2026B00729446-P2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00729446-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/27/2026B00729446-I1Open ↗
08/27/2026B00729446-P1Open ↗
08/27/2026B00729446-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00729446-I1Open ↗