← Back
Two stories - detached, small or mid-size
1860 MARINE PARKWAY
BROOKLYN · BIN 3238678
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4Zoning
1,645 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,100 sf lot · 0.53 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CMYHANDIWORK109/12/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGER WILLIAMS, PE206/21/2026
Building Lifecycle
All (16)Filed (2)Special Inspection (14)
06/21/2026
Filed — Alteration
FILING FOR ENLARGEMENT TO EXISTING ONE FAMILY RESIDENCE,WORK INCLUDED GENERAL CONSTRUCTION, WALLS AND PARTITION INSTALLATIONS,NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01401329-S1
06/19/2026
Special inspection requirement — Final
06/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/19/2026
Special inspection requirement — Subgrade Inspections
06/19/2026
Special inspection requirement — Concrete - Cast-In-Place
06/16/2026
Filed — Alteration
FILING FOR ENLARGEMENT TO EXISTING ONE FAMILY RESIDENCE,WORK INCLUDED GENERAL CONSTRUCTION, WALLS AND PARTITION INSTALLATIONS,NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01401329-I1
06/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/09/2026
Special inspection requirement — Fenestration areas
06/09/2026
Special inspection requirement — Protection of exposed foundation insulation
06/09/2026
Special inspection requirement — Lighting in dwelling units
06/09/2026
Special inspection requirement — Concrete - Cast-In-Place
06/09/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Special inspection requirement — Subgrade Inspections
06/09/2026
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 06/21/2026
Wood
FiledStatusContractorScope
06/21/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/19/2026Final—progress
06/19/2026Fire-Resistant Penetrations and Joints—special
06/19/2026Structural Stability – Alterations of existing buildings—special
06/19/2026Subgrade Inspections—special
06/19/2026Concrete - Cast-In-Place—special
06/16/2026Subsurface Investigations (Borings/Test Pits)—special
06/09/2026Fenestration areas—energy_progress
06/09/2026Protection of exposed foundation insulation—energy_progress
06/09/2026Lighting in dwelling units—energy_progress
06/09/2026Concrete - Cast-In-Place—special
06/09/2026Excavations - Sheeting, Shoring, and Bracing—special
06/09/2026Fire-Resistant Penetrations and Joints—special
06/09/2026Subgrade Inspections—special
06/09/2026Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01401329-S1Request digital key ↗
08/16/2026B01401329-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01401329-S1Open ↗
08/16/2026B01401329-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01401329-S1Open ↗
08/16/2026B01401329-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026B01401329-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026B01401329-I1Open ↗