Hospital, sanitarium, mental institution
H+H_10409_Jacobi Medical Center
1400 PELHAM PARKWAY SOUTH · BIN 2102972
💬 Discuss this project
1957Year Built
12Stories
I1Building Class
R4Zoning
1,453,318 sfGross Floor Area
4Units
LL97 Covered34 Open Violations 7 unresolved · 27 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 1,739,930 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof45p · 2 filings · 20 docs
PenthouseUnder Construction18p · 1 filing · 16 docs
Floor 13Under Construction15p · 1 filing · 16 docs
Floor 12Under Construction16p · 1 filing · 16 docs
Floor 11Under Construction17p · 1 filing · 16 docs
Floor 10Under Construction16p · 1 filing · 16 docs
Floor 9Under Construction16p · 1 filing · 16 docs
Floor 8Under Construction17p · 1 filing · 16 docs
Floor 7Under Construction17p · 1 filing · 16 docs
Floor 6Under Construction16p · 1 filing · 16 docs
Floor 5Under Construction16p · 1 filing · 16 docs
Floor 4Under Construction16p · 1 filing · 16 docs
Floor 3Under Construction35p · 2 filings · 20 docs
Floor 2Under Construction35p · 2 filings · 20 docs
Floor 1Under Construction35p · 3 filings · 20 docs
Cellar19p · 3 filings · 20 docs
Sub-BasementUnder Construction60p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES1307/08/2026
HHC 819103/22/2026
NYC HEALTH AND HOSPITALS103/22/2026
DGS103/21/2026
BILLY CONTRACTORS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2603/21/2026
SUPERSTRUCTURES ENG + ARCH203/21/2026
LIZARDOS ENGINEERING ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ICON CONTRACTING GROUPGeneral Contractor1307/08/2026
AWL INDUSTRIES INCGeneral Contractor1007/08/2026
MNK ENTERPRISES LLCGeneral Contractor507/08/2026
CRESCENT CONTRACTING CORPFire Protection407/08/2026
MNK ENTERPRISES NY INCGeneral Contractor407/08/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
CRESCENT CONTRACTING CORPPlumbing307/08/2026
EASTERN PLBG & MECH CONTRPlumbing207/08/2026
CRESCENT CONTRACTING CORPGeneral Contractor207/08/2026
PARK CONTRACTING GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544210/30/2025
20/20 INSPECTIONS INC14711001/09/2024
ATLANTIC ENGINEERINGLABOR1381201/14/2022
SUPERSTRUCTURES ENGINEERI374201/14/2022
Building Lifecycle
All (148)Filed (21)Permit Issued (34)Signed Off (2)Facade (FISP) (15)Violation (9)Inspection (5)Objection (32)Special Inspection (30)
03/19/2026
Permit issued — General Construction
X00866159-S1-GC
01/16/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Standpipe Systems
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
01/15/2026
Permit issued — Sprinklers
X00866159-I1-EW-SP
01/15/2026
Permit issued — Sprinklers
X00866159-I1-EW-SD
01/14/2026
Permit issued — Standpipe
X00866159-I1-PL
01/06/2026
Objection resolved — Addressed
11/26/2025
Cycle 10 facade report signed — SWARMP
11/07/2025
Objection raised — Other
10/30/2025
Filed — Alteration
Remove existing ceiling and floor. Replace and patch ceilings after ACM abatement.
X00866159-P1
10/23/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Standpipe Systems
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
10/06/2025
Cycle 10 facade report submitted
09/18/2025
Cycle 10 facade inspection completed
07/28/2025
Permit issued — Sidewalk Shed
X00821832-I1-SH
07/08/2025
Permit issued — Standpipe
X00866159-I1-PL
03/19/2025
Permit issued — General Construction
X00866159-S1-GC
03/14/2025
Permit issued — Sprinklers
X00866159-I1-PL
03/14/2025
Permit issued — Standpipe
X00866159-I1-EW-SD
03/14/2025
Permit issued — Sprinklers
X00866159-I1-EW-SP
03/10/2025
Permit issued — Foundation
X00648428-S1-GC-CX
02/27/2025
Cycle 8 facade report signed — SWARMP
02/10/2025
Permit issued — Sidewalk Shed
X00821832-I1-SH
01/29/2025
Cycle 8 facade report submitted
01/28/2025
Signed off — Alteration
Jacobi Bldg #04, Exterior facade repairs as per the plans filed including: Removal, replacement & restoration of cracked masonry units, stabilization pins, coping, concrete, window lintel & sill, sealant joints, stone, limestone & railing.
X00557111-I1
01/17/2025
Cycle 8 facade inspection completed
11/27/2024
Permit issued — General Construction
X00557111-I1-GC
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
07/26/2024
Permit issued — Plumbing
X00648428-S2-EW-SP
07/22/2024
Filed — Alteration
Remove existing ceiling and floor. Replace and patch ceilings after ACM abatement.
X00866159-S1
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
06/25/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
04/22/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/18/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/05/2024
Special inspection requirement — Lighting controls
JACOB HAAS
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
04/05/2024
Special inspection requirement — Final
JACOB HAAS
04/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
JACOB HAAS
04/05/2024
Special inspection requirement — Interior lighting power
JACOB HAAS
04/04/2024
Objection raised — Other
04/04/2024
Objection raised — Structural
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCRESCENT CONTRACTING CORP03/19/2026
DOB NOWSprinklersPermit IssuedAPEX MECHANICAL CORP01/15/2026
DOB NOWSprinklersPermit IssuedAPEX MECHANICAL CORP01/15/2026
DOB NOWStandpipePermit IssuedCRESCENT CONTRACTING CORP01/14/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/28/2025
DOB NOWStandpipePermit IssuedCRESCENT CONTRACTING CORP07/08/2025
DOB NOWGeneral ConstructionPermit IssuedCRESCENT CONTRACTING CORP03/19/2025
DOB NOWSprinklersPermit IssuedCRESCENT CONTRACTING CORP03/14/2025
DOB NOWStandpipePermit IssuedAPEX MECHANICAL CORP03/14/2025
DOB NOWSprinklersPermit IssuedAPEX MECHANICAL CORP03/14/2025
DOB NOWFoundationPermit IssuedAWL INDUSTRIES INC03/10/2025
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC02/10/2025
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP11/27/2024
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP07/26/2024
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC03/18/2024
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC02/13/2024
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP02/12/2024
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP11/27/2023
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC06/15/2023
DOB NOWSprinklersSigned-offEASTERN PLBG & MECH CONTR04/13/2023
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC03/15/2023
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC03/13/2023
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES LLC02/01/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/26/2023
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP01/25/2023
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP11/28/2022
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP10/06/2022
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC05/24/2022
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR04/27/2022
DOB NOWMechanical SystemsPermit IssuedAWL INDUSTRIES INC03/24/2022
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/16/2022
DOB NOWGeneral ConstructionPermit IssuedAWL INDUSTRIES INC03/10/2022
DOB NOWGeneral ConstructionSigned-offICON CONTRACTING GROUP02/18/2022
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC01/13/2021
BISPLISSUEDSHAW MECHANICAL INC08/30/2013
BISSPISSUEDACCURATE MECHANICAL INC02/20/2013
BIS—ISSUEDKENSTAR CONSTRUCTION CORP08/23/2012
BISMHISSUEDGMDV TRANS INC08/03/2012
BISSPISSUEDDEPENDABLE MECHANICAL COR05/22/2012
BISFSISSUEDMETROPOLITAN HT&POWER CO01/16/2012
+ 29 more permits on file
1 project · most recent 04/02/2024
Cooling Towers Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/02/2024Permit IssuedAWL INDUSTRIES INCCooling Towers, Heating Systems
Heating
Cooling Tower
2 projects · most recent 10/30/2025
Sprinkler System
FiledStatusContractorScope
10/30/2025Permit IssuedCRESCENT CONTRACTING CORPSprinkler System
04/02/2024Signed-offSIRINA FIRE PROT CORPSprinkler System
2 projects · most recent 10/30/2025
Water/Sanitary
FiledStatusContractorScope
10/30/2025Permit IssuedCRESCENT CONTRACTING CORPWater/Sanitary
04/02/2024Signed-offEASTERN PLBG & MECH CONTRWater/Sanitary
4 projects · most recent 08/06/2026
General Wiring Lighting
FiledStatusContractorScope
08/06/2026Permit IssuedMAC FHIONNGHAILE & SONSGeneral Wiring
03/02/2026Permit IssuedOHM'S ELECTRICAL CORPLighting
02/02/2023Permit IssuedRICHARD NEU—
01/13/2021Permit IssuedRICHARD NEU—
2 projects · most recent 04/02/2024
Steel Masonry
FiledStatusContractorScope
04/02/2024Permit IssuedAWL INDUSTRIES INCSteel, Masonry
09/13/2022——1 scope_items
1 project · most recent 02/01/2023
Sidewalk Shed
FiledStatusContractorScope
02/01/2023Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/22/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/18/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/16/2026Sprinkler SystemsEUGENE BIFULCOspecial
01/16/2026Standpipe SystemsEUGENE BIFULCOspecial
01/16/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
01/16/2026Post-installed AnchorsEUGENE BIFULCOspecial
10/23/2025Post-installed AnchorsEUGENE BIFULCOspecial
10/23/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/23/2025Standpipe SystemsEUGENE BIFULCOspecial
10/23/2025Sprinkler SystemsEUGENE BIFULCOspecial
07/11/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/05/2024Lighting controlsJACOB HAASenergy_progress
04/05/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
04/05/2024Energy Code Compliance InspectionsJACOB HAASprogress
04/05/2024FinalJACOB HAASprogress
04/05/2024Fire-Resistance Rated ConstructionJACOB HAASprogress
04/05/2024Interior lighting powerJACOB HAASenergy_progress
03/29/2024Fire-Resistance Rated Construction—progress
03/29/2024Energy Code Compliance Inspections—progress
03/29/2024Fire-Resistant Penetrations and Joints—special
03/28/2024Lighting controlsJACOB HAASenergy_progress
03/28/2024FinalJACOB HAASprogress
03/28/2024Interior lighting powerJACOB HAASenergy_progress
02/12/2024Public Assembly Emergency LightingMostafa Osmanprogress
01/11/2024HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
01/11/2024Sprinkler SystemsJACOB HAASspecial
01/03/2024HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
Latest 25 of 37.
▾Documents — 405 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch20
08/25/2026X00557111-I1Request digital key ↗
08/25/2026X00557111-P1Request digital key ↗
08/24/2026X00778415-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00453123-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/21/2026X01004461-I1Request digital key ↗
▸Applications & Permits97
▸BISPLAN / WORK APPROVAL APPLICATION45
05/30/2014220141031Open ↗
02/10/2014220014339Open ↗
07/26/2013220014703Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION34
08/31/2013220066988Open ↗
08/06/2013220066988Open ↗
02/20/2013220066988Open ↗
Showing 3 of 34 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-11318
07/05/2014220014320Open ↗
07/05/2014220014339Open ↗
07/05/2014220014703Open ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
06/16/2011210067336Open ↗
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013220066988Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/25/2026X00453123-I1Open ↗
08/25/2026X00557111-I1Open ↗
08/24/2026X00778415-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/30/2026X00648428-S2Open ↗
09/23/2026X00557111-P1Open ↗
08/31/2026X00648428-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026X00648428-S2Open ↗
09/23/2026X00557111-P1Open ↗
09/23/2026X00557111-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE15
05/29/2014220066988Open ↗
05/29/2014220066988Open ↗
02/14/2014210075390Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING13
10/09/2012210114366Open ↗
12/01/2011220066988Open ↗
01/25/2011220014703Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
12/03/2013210114455Open ↗
11/06/2013220014339Open ↗
11/01/2013220141013Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS5
08/16/2011220083969Open ↗
08/16/2011220083969Open ↗
08/16/2011220083969Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
02/14/2014210075390Open ↗
12/13/2013220066988Open ↗
05/29/2012210075390Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/15/2011210078832Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/16/2011220083969Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026X00866159-I1Open ↗
08/13/2026X00866159-P1Open ↗
▸BISSPRINKLER-STANDPIPE ELECTRICAL LETTER1
09/02/2010220066988Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
04/01/2011220111215Open ↗
09/22/2010220083969Open ↗
09/13/2010220082531Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026X00648428-S1Open ↗
08/14/2026X00648428-I1Open ↗
▸Approvals, Objections & Sign-offs88
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/25/2026X00453123-I1Open ↗
08/25/2026X00557111-I1Open ↗
08/15/2026X00866159-P1Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
09/21/2011220141013Open ↗
09/21/2011220141031Open ↗
08/19/2011220133077Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/23/2014220111215Open ↗
06/21/2014220066988Open ↗
02/25/2014220066988Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026X00648428-S1Open ↗
08/13/2026X00648428-I1Open ↗
08/13/2026X00648428-S2Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013210114455Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/15/2026X00866159-S1Open ↗
08/14/2026X00866159-I1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
09/09/2011220129439Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00557111-I1Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT35
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013210114455Open ↗
Showing 3 of 35 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
09/22/2010220083969Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
01/31/2011220014320Open ↗
11/17/2010210075390Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
06/03/2011220014320Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00648428-S1Open ↗