Hospital, sanitarium, mental institution
Jacobi Medical Center
1860 SEMINOLE AVENUE · BIN 2102972
💬 Discuss this project
1957Year Built
12Stories
I1Building Class
R4Zoning
1,453,318 sfGross Floor Area
4Units
LL97 Covered32 Active Violations 7 unresolved · 25 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 1,739,930 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsH+H Jacobi Medical CenterUnder Construction1 filing
RoofH+H Jacobi Medical Center3p · 2 filings · 20 docs
Floor 3H+H Jacobi Medical Center4p · 1 filing · 20 docs
Floor 2H+H Jacobi Medical Center4p · 1 filing · 20 docs
Floor 1H+H Jacobi Medical Center4p · 2 filings · 20 docs
CellarH+H Jacobi Medical Center7p · 2 filings · 20 docs
BasementH+H Jacobi Medical Center11p · 1 filing · 20 docs
Sub-BasementH+H Jacobi Medical Center1 filing · 20 docs
Site & exteriorH+H Jacobi Medical Center3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DGS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec2603/21/2026
Superstructures Engineering + Architects203/21/2026
Lizardos Engineering Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icon Contracting GroupGeneral Contractor1307/08/2026
Awl IndustriesGeneral Contractor1007/08/2026
MNK EnterprisesScaffold507/08/2026
Crescent ContractingFire Protection407/08/2026
MNK Enterprises NYScaffold407/08/2026
Sirina Fire ProtectionFire Protection307/08/2026
Crescent ContractingPlumbing307/08/2026
Eastern Plumbing & Mechanical ContractingPlumbing207/08/2026
Crescent ContractingGeneral Contractor207/08/2026
Park Contracting GroupScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections14711109/23/2026
Crosscheck Inspection Services544210/30/2025
Atlantic Engineeringlabor1381201/14/2022
Superstructures Engineering374201/14/2022
Building Lifecycle
All (148)Filed (22)Permit Issued (34)Signed Off (2)Facade (FISP) (15)Violation (9)Inspection (4)Objection (32)Special Inspection (30)
09/23/2026
Filed — Alteration
MECHANICAL PLANS FOR INTERIOR RENOVATION OF EXISTING GYMNASIUM AND ACCESSORY SPACES. NO CHANGE TO EGRESS, OCCUPANCY OR USE.
X00648428-P9
03/19/2026
Permit issued — General Construction
X00866159-S1-GC
01/16/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
01/16/2026
Special inspection requirement — Standpipe Systems
EUGENE BIFULCO
01/15/2026
Permit issued — Sprinklers
X00866159-I1-EW-SP
01/15/2026
Permit issued — Sprinklers
X00866159-I1-EW-SD
01/14/2026
Permit issued — Sprinklers
X00866159-I1-PL
01/06/2026
Objection resolved — Addressed
11/26/2025
Cycle 10 facade report signed — SWARMP
11/07/2025
Objection raised — Other
10/30/2025
Filed — Alteration
Remove existing ceiling and floor. Replace and patch ceilings after ACM abatement.
X00866159-P1
10/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACOB HAAS
10/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACOB HAAS
10/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
JACOB HAAS
10/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB HAAS
10/28/2025
Special inspection requirement — Electrical motors and elevators
JACOB HAAS
10/28/2025
Special inspection requirement — Mechanical Systems
JACOB HAAS
10/28/2025
Special inspection requirement — Final
JACOB HAAS
10/28/2025
Special inspection requirement — Ventilation and air distribution system
JACOB HAAS
10/28/2025
Special inspection requirement — Maintenance information
JACOB HAAS
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
10/23/2025
Special inspection requirement — Standpipe Systems
EUGENE BIFULCO
10/06/2025
Cycle 10 facade report submitted
09/18/2025
Cycle 10 facade inspection completed
07/28/2025
Permit issued — Sidewalk Shed
X00821832-I1-SH
07/08/2025
Permit issued — Standpipe
X00866159-I1-PL
03/19/2025
Permit issued — General Construction
X00866159-S1-GC
03/14/2025
Permit issued — Plumbing
X00866159-I1-PL
03/14/2025
Permit issued — Standpipe
X00866159-I1-EW-SD
03/14/2025
Permit issued — Sprinklers
X00866159-I1-EW-SP
03/10/2025
Permit issued — Foundation
X00648428-S1-GC-CX
02/27/2025
Cycle 8 facade report signed — SWARMP
02/10/2025
Permit issued — Sidewalk Shed
X00821832-I1-SH
01/29/2025
Cycle 8 facade report submitted
01/28/2025
Signed off — Alteration
Jacobi Bldg #04, Exterior facade repairs as per the plans filed including: Removal, replacement & restoration of cracked masonry units, stabilization pins, coping, concrete, window lintel & sill, sealant joints, stone, limestone & railing.
X00557111-I1
01/17/2025
Cycle 8 facade inspection completed
11/27/2024
Permit issued — General Construction
X00557111-I1-GC
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
08/01/2024
Objection raised — Other
07/26/2024
Permit issued — Plumbing
X00648428-S2-EW-SP
07/22/2024
Filed — Alteration
Remove existing ceiling and floor. Replace and patch ceilings after ACM abatement.
X00866159-S1
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
07/01/2024
Objection resolved — Addressed
06/25/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
05/15/2024
Objection resolved — Addressed
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCrescent Contracting03/19/2026
DOB NOWSprinklersPermit IssuedApex Mechanical01/15/2026
DOB NOWStandpipePermit IssuedApex Mechanical01/15/2026
DOB NOWPlumbingPermit IssuedCrescent Contracting01/14/2026
DOB NOWSidewalk ShedPermit IssuedPark Contracting Group07/28/2025
DOB NOWPlumbingPermit IssuedCrescent Contracting07/08/2025
DOB NOWGeneral ConstructionPermit IssuedCrescent Contracting03/19/2025
DOB NOWPlumbingPermit IssuedCrescent Contracting03/14/2025
DOB NOWStandpipePermit IssuedApex Mechanical03/14/2025
DOB NOWSprinklersPermit IssuedApex Mechanical03/14/2025
DOB NOWFoundationPermit IssuedAwl Industries03/10/2025
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises NY02/10/2025
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group11/27/2024
DOB NOWSprinklersSigned-offSirina Fire Protection07/26/2024
DOB NOWGeneral ConstructionPermit IssuedAwl Industries03/18/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises NY02/13/2024
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group02/12/2024
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group11/27/2023
DOB NOWMechanical SystemsPermit IssuedAwl Industries06/15/2023
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting04/13/2023
DOB NOWMechanical SystemsPermit IssuedAwl Industries03/15/2023
DOB NOWGeneral ConstructionPermit IssuedAwl Industries03/13/2023
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises02/01/2023
DOB NOWSprinklersSigned-offSirina Fire Protection01/26/2023
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group01/25/2023
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group11/28/2022
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group10/06/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises05/24/2022
DOB NOWPlumbingSigned-offEastern Plumbing & Mechanical Contracting04/27/2022
DOB NOWMechanical SystemsPermit IssuedAwl Industries03/24/2022
DOB NOWSprinklersSigned-offSirina Fire Protection03/16/2022
DOB NOWGeneral ConstructionPermit IssuedAwl Industries03/10/2022
DOB NOWGeneral ConstructionSigned-offIcon Contracting Group02/18/2022
DOB NOWSidewalk ShedSigned-offMNK Enterprises01/13/2021
BISPLISSUEDShaw Mechanical08/30/2013
BISSPISSUEDAccurate Mechanical02/20/2013
BIS—ISSUEDKenstar Construction08/23/2012
BISMHISSUEDGMDV Trans08/03/2012
BISSPISSUEDDependable Mechanical05/22/2012
BISFSISSUEDMetropolitan HT & Power Co01/16/2012
+ 29 more permits on file
1 project · most recent 09/23/2026
Cooling Towers Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2026Permit IssuedAwl IndustriesCooling Towers, Heating Systems
Heating
Cooling Tower
2 projects · most recent 09/23/2026
Sprinkler System
FiledStatusContractorScope
09/23/2026Signed-offSirina Fire ProtectionSprinkler System
10/30/2025Permit IssuedCrescent ContractingSprinkler System
2 projects · most recent 09/23/2026
Water/Sanitary
FiledStatusContractorScope
09/23/2026Signed-offEastern Plumbing & Mechanical ContractingWater/Sanitary
10/30/2025Permit IssuedCrescent ContractingWater/Sanitary
4 projects · most recent 08/06/2026
General Wiring Lighting
FiledStatusContractorScope
08/06/2026Permit IssuedMac Fhionnghaile & SonsGeneral Wiring
03/02/2026Permit IssuedOhm's ElectricalLighting
02/02/2023Permit IssuedRichard Neu—
01/13/2021Permit IssuedRichard Neu—
2 projects · most recent 09/23/2026
Steel Masonry
FiledStatusContractorScope
09/23/2026Permit IssuedAwl IndustriesSteel, Masonry
09/13/2022——1 scope_items
1 project · most recent 02/01/2023
Sidewalk Shed
FiledStatusContractorScope
02/01/2023Permit IssuedPark Contracting GroupSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
01/16/2026Sprinkler SystemsEUGENE BIFULCOspecial
01/16/2026Post-installed AnchorsEUGENE BIFULCOspecial
01/16/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
01/16/2026Standpipe SystemsEUGENE BIFULCOspecial
10/28/2025HVAC-R and service water heating equipmentJACOB HAASenergy_progress
10/28/2025HVAC-R and service water heating system controlsJACOB HAASenergy_progress
10/28/2025Duct leakage testing, insulation and designJACOB HAASenergy_progress
10/28/2025HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
10/28/2025Electrical motors and elevatorsJACOB HAASenergy_progress
10/28/2025Mechanical SystemsJACOB HAASspecial
10/28/2025FinalJACOB HAASprogress
10/28/2025Ventilation and air distribution systemJACOB HAASenergy_progress
10/28/2025Maintenance informationJACOB HAASenergy_progress
10/23/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
10/23/2025Post-installed AnchorsEUGENE BIFULCOspecial
10/23/2025Sprinkler SystemsEUGENE BIFULCOspecial
10/23/2025Standpipe SystemsEUGENE BIFULCOspecial
07/11/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/05/2024Interior lighting powerJACOB HAASenergy_progress
04/05/2024Lighting controlsJACOB HAASenergy_progress
04/05/2024Fire-Resistance Rated ConstructionJACOB HAASprogress
04/05/2024FinalJACOB HAASprogress
04/05/2024Energy Code Compliance InspectionsJACOB HAASprogress
04/05/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
03/29/2024Fire-Resistance Rated Construction—progress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
H+H Jacobi Medical CenterMedical / HealthcareEntire building
Project X00866159 Alteration · Permit Entire · 03/18/2024
Project X00821832 Alteration · Permit Entire · 02/01/2023
Project X00778415 Alteration · Filing Withdrawn · 09/13/2022
Project X00648428 Alteration · Permit Entire · 12/16/2021
Project X00557111 Alteration · LOC Issued · 09/13/2021
Project X00453123 Alteration · LOC Issued · 01/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 405 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch20
08/25/2026X00557111-I1Request digital key ↗
08/25/2026X00557111-P1Request digital key ↗
08/24/2026X00778415-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00453123-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/21/2026X01004461-I1Request digital key ↗
▸Applications & Permits97
▸BISPLAN / WORK APPROVAL APPLICATION45
05/30/2014220141031Open ↗
02/10/2014220014339Open ↗
07/26/2013220014703Open ↗
Showing 3 of 45 on file for this type
▸BISWORK PERMIT APPLICATION34
08/31/2013220066988Open ↗
08/06/2013220066988Open ↗
02/20/2013220066988Open ↗
Showing 3 of 34 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-11318
07/05/2014220014320Open ↗
07/05/2014220014339Open ↗
07/05/2014220014703Open ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
06/16/2011210067336Open ↗
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013220066988Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/25/2026X00453123-I1Open ↗
08/25/2026X00557111-I1Open ↗
08/24/2026X00778415-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/30/2026X00648428-S2Open ↗
09/23/2026X00557111-P1Open ↗
08/31/2026X00648428-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026X00648428-S2Open ↗
09/23/2026X00557111-P1Open ↗
09/23/2026X00557111-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
▸Trade Schedules & Equipment50
▸BISSELF-CERT PLUMBING NOTICE15
05/29/2014220066988Open ↗
05/29/2014220066988Open ↗
02/14/2014210075390Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING13
10/09/2012210114366Open ↗
12/01/2011220066988Open ↗
01/25/2011220014703Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
12/03/2013210114455Open ↗
11/06/2013220014339Open ↗
11/01/2013220141013Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS5
08/16/2011220083969Open ↗
08/16/2011220083969Open ↗
08/16/2011220083969Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
02/14/2014210075390Open ↗
12/13/2013220066988Open ↗
05/29/2012210075390Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/15/2011210078832Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/16/2011220083969Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026X00866159-P1Open ↗
08/13/2026X00866159-I1Open ↗
▸BISSPRINKLER-STANDPIPE ELECTRICAL LETTER1
09/02/2010220066988Open ↗
▸Environmental & Asbestos15
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
04/01/2011220111215Open ↗
09/22/2010220083969Open ↗
09/13/2010220082531Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS INSPECTION REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026X00648428-S1Open ↗
08/14/2026X00648428-I1Open ↗
▸Approvals, Objections & Sign-offs88
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
08/25/2026X00453123-I1Open ↗
08/25/2026X00557111-I1Open ↗
08/15/2026X00866159-P1Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
09/21/2011220141013Open ↗
09/21/2011220141031Open ↗
08/19/2011220133077Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/23/2014220111215Open ↗
06/21/2014220066988Open ↗
02/25/2014220066988Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026X00648428-S3Open ↗
08/13/2026X00648428-P6Open ↗
08/13/2026X00648428-P4Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013210114455Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/15/2026X00866159-S1Open ↗
08/14/2026X00866159-I1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
09/09/2011220129439Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X00557111-I1Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT35
06/23/2014220111215Open ↗
12/03/2013220066988Open ↗
12/03/2013210114455Open ↗
Showing 3 of 35 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
07/16/2011220129439Open ↗
04/01/2011220111215Open ↗
09/22/2010220083969Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
01/31/2011220014320Open ↗
11/17/2010210075390Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
06/03/2011220014320Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00648428-S1Open ↗