← Back
Four families
1864 WEST 4 STREET
BROOKLYN · Gravesend (West) · BIN 3178219
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R4-1Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · 2,608 sf lot · 1.23 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JX FLAME SOLUTION INC209/21/2021
NYX ENGINEERING, PLLC209/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATMAN PLUMBING INCPlumbing707/08/2026
JABBIE INDUSTRIES INCORP*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118209/07/2021
Building Lifecycle
All (45)Filed (4)Permit Issued (2)Signed Off (2)Violation (7)Inspection (4)Objection (6)Special Inspection (20)
05/06/2026
Violation issued (HPD, closed)
A
06/11/2025
Violation issued (HPD, closed)
A
04/12/2024
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
10/20/2021
Signed off — Alteration
B00521493-I1
10/13/2021
Signed off — Alteration
RENOVATION OF AN EXISTING BUILDING AT 1ST AND 2ND FLOOR FRONT APARTMENTS. REMOVE PARTITIONS AND REPAIR AND PAINT EXISTING WALL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00480446-I1
09/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
09/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
09/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
09/21/2021
Filed — Alteration
B00521493-P1
09/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
09/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
09/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
09/08/2021
Special inspection requirement — Fenestration air leakage
Xiao Huang
09/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
09/08/2021
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
09/08/2021
Special inspection requirement — Final
Xiao Huang
09/08/2021
Special inspection requirement — Fenestration areas
Xiao Huang
09/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
09/08/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
09/07/2021
Filed — Alteration
RENOVATION OF AN EXISTING BUILDING AT 1ST AND 2ND FLOOR FRONT APARTMENTS. REMOVE PARTITIONS AND REPAIR AND PAINT EXISTING WALL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00480446-P1
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
09/07/2021
Special inspection requirement — Fenestration air leakage
Xiao Huang
09/07/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
09/07/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
09/07/2021
Special inspection requirement — Fenestration areas
Xiao Huang
09/07/2021
Special inspection requirement — Final
Xiao Huang
09/07/2021
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
07/01/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2021
Permit issued — Plumbing
B00521493-I1-PL
05/27/2021
Filed — Alteration
B00521493-I1
04/13/2021
Violation issued (HPD, closed)
A
04/05/2021
Permit issued — General Construction
B00480446-I1-GC
03/25/2021
Objection resolved — Addressed
03/22/2021
Objection resolved — Addressed
03/17/2021
Objection resolved — Addressed
03/15/2021
Objection raised — Energy
03/15/2021
Objection raised — Inspections
03/15/2021
Objection raised — Other
03/11/2021
Filed — Alteration
RENOVATION OF AN EXISTING BUILDING AT 1ST AND 2ND FLOOR FRONT APARTMENTS. REMOVE PARTITIONS AND REPAIR AND PAINT EXISTING WALL. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00480446-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC06/03/2021
DOB NOWGeneral ConstructionSigned-offJABBIE INDUSTRIES INCORP*04/05/2021
1 project · most recent 04/29/2021
General Wiring
FiledStatusContractorScope
04/29/2021CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/22/2021HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/22/2021HVAC-R and service water heating system controlsXiao Huangenergy_progress
09/22/2021HVAC-R and service water heating equipmentXiao Huangenergy_progress
09/20/2021HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/20/2021HVAC-R and service water heating system controlsXiao Huangenergy_progress
09/20/2021HVAC-R and service water heating equipmentXiao Huangenergy_progress
09/08/2021Fenestration air leakageXiao Huangenergy_progress
09/08/2021Fire-Resistant Penetrations and JointsXiao Huangspecial
09/08/2021Energy Code Compliance InspectionsXiao Huangprogress
09/08/2021FinalXiao Huangprogress
09/08/2021Fenestration areasXiao Huangenergy_progress
09/08/2021HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/08/2021Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
09/07/2021Fire-Resistant Penetrations and JointsXiao Huangspecial
09/07/2021Fenestration air leakageXiao Huangenergy_progress
09/07/2021Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
09/07/2021HVAC-R and service water piping design and insulationXiao Huangenergy_progress
09/07/2021Fenestration areasXiao Huangenergy_progress
09/07/2021FinalXiao Huangprogress
09/07/2021Energy Code Compliance InspectionsXiao Huangprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00480446-P1Request digital key ↗
09/01/2026B00521493-I1Request digital key ↗
09/01/2026B00521493-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026B00521493-P1Open ↗
08/27/2026B00521493-I1Open ↗
08/26/2026B00480446-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00480446-I1Open ↗
09/01/2026B00480446-P1Open ↗
09/01/2026B00521493-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00480446-I1Open ↗
08/23/2026B00480446-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00480446-P1Open ↗
08/15/2026B00480446-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00480446-I1Open ↗
08/13/2026B00521493-I1Open ↗