ECB12/04/2025NOTED: VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER DUE TO EXCESSIVE AMOUNT OF CONSTRUCTION DEBRIS. ATOI OBSERVED AT EXPO # 3 EXCESSIVE CONSTRUCTION DEBRIS STORED ON THE EXTEROIR O$12K due
ECB12/04/2025FULL VACATE ORDER ISSUED FOR THE GARAGE . ATOI OBSERVED A HUGE AMOUNT OF CONSTRUCTION DEBRIS APOPX 2 STORY IN HEIGHT PILED UP AGAINST THE RESIDENTS GARAGE AT EXPO # 3 WHICH IS A HAZZARD TO ANYONE INSIDE DUE TO$12K due
ECB12/04/2025WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL ELECTRICAL WORK BEING DONE ON THE INTERIOR OF THE ENTIRE RESIDENT, OBTAIN PERMIT$8K due
ECB09/25/2025WORK WITHOUT PERMIT. FSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE INTERIOR OF THE ENTIRE RESIDENT, OBTAIN PERMIT$12K due
ECB09/25/2025WORK WITHOUT PERMIT: FSWO ISSUED FOR ALL GENERAL CONSTRUCTION. CARPENTRY DEMOLITION STRUCTURAL ECT WORK BEING DONE ON THE HORIZONTAL AND VERTICAL STRUCTURES. ALONG WITH ALL INTERIOR WORK. ATOI OBSERVED AN UNPER$12K due
ECB09/25/2025FULL VACATE ORDER ISSUED ON THE UNPERMITTED TWO STORY HORIZONTAL AND VERTICAL STRUCTURE AT EXPO # 3. AND THE ENTIRE RESIDENTIAL BUILDING ATTRACTED TO THE ILLEGAL STRUCTURE, OBTAIN PERMIT$12K due
Two stories - detached, small or mid-size · 3,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.