← Back
Two family converted from one family
1869 RANDALL AVENUE
BRONX · BIN 2021890
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R5Zoning
2,300 sfGross Floor Area
2Units
Two family converted from one family · 2,500 sf lot · 0.92 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUN YAN, PE106/25/2025
NMI ARCHITECTURE, PLLC103/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VENTURE HOME IMPROVEMENTGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUN YAN, PE7170106/25/2025
Building Lifecycle
All (25)Filed (2)Permit Issued (1)Signed Off (1)Objection (14)Special Inspection (7)
10/07/2025
Signed off — Alteration
APPLICATION IS FILED FOR FRAMING & REPAIR WORK ON A PORTION OF THE EAST SIDE FACADE AT THE 1ST FLOOR DUE TO FIRE DAMAGE, REPLACE ST. WALL STUDS AND EXTERIOR SIDING, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01244529-I1
07/24/2025
Permit issued — Structural
X01244529-I1-ST
06/25/2025
Filed — Alteration
APPLICATION IS FILED FOR FRAMING & REPAIR WORK ON A PORTION OF THE EAST SIDE FACADE AT THE 1ST FLOOR DUE TO FIRE DAMAGE, REPLACE ST. WALL STUDS AND EXTERIOR SIDING, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01244529-I1
06/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUN YAN
06/20/2025
Special inspection requirement — Structural Wood Frame
JUN YAN
06/20/2025
Special inspection requirement — Final
JUN YAN
05/21/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/29/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Plumbing
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Code
03/24/2025
Objection raised — Scope
03/24/2025
Objection raised — Scope
03/24/2025
Objection raised — Fire_Protection
03/24/2025
Objection raised — Zoning
03/24/2025
Objection raised — Code
03/18/2025
Filed — Alteration
APPLICATION IS FILED TO REPAIR THE 1st FLOOR& CEL PART OF THE 2 FAMILY BUILDING AFTER FIRE DAMAGE, AND SMOKE DAMAGE, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X01142599-I1
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2025
Special inspection requirement — Insulation placement and R values
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
02/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offVENTURE HOME IMPROVEMENT07/24/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/20/2025Structural Stability – Alterations of existing buildingsJUN YANspecial
06/20/2025Structural Wood FrameJUN YANprogress
06/20/2025FinalJUN YANprogress
02/27/2025Fire-Resistant Penetrations and Joints—special
02/27/2025Insulation placement and R values—energy_progress
02/27/2025Energy Code Compliance Inspections—progress
02/27/2025Fire-Resistance Rated Construction—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01142599-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01142599-I1Open ↗
08/13/2026X01244529-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026X01244529-I1Open ↗
08/31/2026X01244529-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026X01244529-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01142599-I1Open ↗
08/13/2026X01244529-I1Open ↗