2 Open Violations 0 unresolved · 2 paperwork only▸
ECB08/18/2022AT TIME OF INSPECTION ON AN ACTIVE 2 STORY ALT JOB SITE WHEN ASKING FOR THE FOLLOWING REQUIRED ON SITE DOCUMENTS NONE COULD BE PROVIDED. 1.)SITE SAFETY PLAN, 2.)FOUNDATION WALL DETAIL DRAWINGS, 3.)TOOLBOX TALKSNothing owed — awaiting certificate of correction
ECB08/18/2022AT TIME OF INSPECTION ON AN ACTIVE 2 STORY ALT JOBSITE I OBSERVED 4 WORKERS PERFORMING EXCAVATION/FORM WORK AT EXP.2 FOUNDATION TRENCH. WHEN ASKING FOR THE DESIGNATED COMPETENT PERSON OR SUPERINTENDENT ON SITENothing owed — awaiting certificate of correction
One story - permanent living quarter · 6,000 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.