← Back
BuildNYC
Elevator apt, semi-fireproof without stores
187-11 HOLLIS AVENUE
QUEENS · Hollis · BIN 4625406
💬 Discuss this project
2024Year Built
4Stories
D1Building Class
R5DZoning
18,424 sfGross Floor Area
23Units
3 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 860 Investors · 8,178 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior demolition work49p · 6 filings · 20 docs
BulkheadFoundation and structural work for new building3p · 1 filing · 20 docs
Floor 4Foundation and structural work for new building66p · 5 filings · 20 docs
Floor 3Foundation and structural work for new building66p · 5 filings · 20 docs
Floor 2Interior demolition work67p · 6 filings · 20 docs
Floor 1860 Investors LLC70p · 7 filings · 20 docs
CellarFoundation and structural work for new building91p · 6 filings · 20 docs
Sub-CellarFoundation and structural work for new building26p · 5 filings · 20 docs
Site & exteriorConstruction fence installation39p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
860 Investors1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2018$1.1M—ARAN HOLDINGS, LLC → 860 Investors— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green Design1007/16/2026
RMM Design Studio204/16/2026
Enthink Engineers809/05/2025
MSM Engineering Services711/18/2024
LMW Engineering Group107/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Royal Expediting1503/21/2026
Ebc Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prime Construction USAGeneral Contractor804/09/2026
Royal Builders GroupScaffold604/09/2026
Royal Builders GroupGeneral Contractor607/08/2026
Prime Construction USAScaffold607/08/2026
Triera ContractingScaffold407/08/2026
Bruche Mechanical NYFire Protection205/15/2026
Plumbing P & HPlumbing207/08/2026
Solar ProGeneral Contractor107/08/2026
Lloyd G Drummond Plumbing & GenFire Protection107/08/2026
Lloyd G Drummond Plumbing & GenPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Butterfield & O'Connor4189907/16/2026
World Design Architecture9323204/16/2026
IP Concrete Testing and I6252409/05/2025
Enthink Engineers6247507/12/2023
Victor Suben6672207/12/2023
Building Lifecycle
All (158)Filed (28)Permit Issued (32)Signed Off (12)Violation (6)Inspection (8)Objection (42)Special Inspection (30)
09/02/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01360121-I1
08/31/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL PLANS - HEATING & COOLING SYSTEM FILED INCONJUNCTION WITH NB JOB# 421133543. NO CHANGE IN USE, EGRESS OCCUPANCY.
Q00465972-I1
08/31/2026
Signed off — Alteration
INSTALLATION OF PLUMBING, SPRINKLER SYSTEMS AND SIAMESE INCONJUNCTION WITH NB APPLICATION# 421133543. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00465950-I1
07/16/2026
Filed — Alteration
INSTALLATION OF MECHANICAL PLANS - HEATING & COOLING SYSTEM FILED INCONJUNCTION WITH NB JOB# 421133543. NO CHANGE IN USE, EGRESS OCCUPANCY.
Q00465972-P3
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Shutoff dampers
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Mechanical Systems
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Final
RONALD VILLANO
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Heating Systems
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — Maintenance information
BRIAN T. O'CONNOR
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Sprinkler Systems
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Electrical motors and elevators
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
05/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BRIAN T. O'CONNOR
05/05/2026
Permit issued — Solar
Q01360121-I1-SL
05/04/2026
Special inspection requirement — Air barrier - visual inspection
William Alicea
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
05/04/2026
Special inspection requirement — Final
RICHARD MUESCH JR.
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
05/03/2026
Filed — Alteration
INSTALLATION OF PLUMBING, SPRINKLER SYSTEMS AND SIAMESE INCONJUNCTION WITH NB APPLICATION# 421133543. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00465950-P4
04/18/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN T. O'CONNOR
04/17/2026
Special inspection requirement — Maintenance information
BRIAN T. O'CONNOR
04/17/2026
Special inspection requirement — Electrical motors and elevators
BRIAN T. O'CONNOR
04/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
04/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
04/16/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01360121-P1
04/13/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/10/2026
Signed off — Alteration
FILING FOR FOUNDATION AND STRUCTURAL WORK INCONJUNCTION WITH NEW BUILDING APPLICATION FILED UNDER JOB# 421133543
Q00464572-I1
03/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2026
Signed off — Alteration
FILING FOR SOE INCONJUNCTION WITH NB JOB FILED. NB JOB # 421133543
Q00464501-I1
03/23/2026
Signed off — Alteration
Q00510425-I1
03/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2026
Signed off — Alteration
Application filed in conjunction with New Building # 421133543 solely for a foundation and footing to vest into 421-A.
Q00753394-I1
03/06/2026
Signed off — Alteration
Application filed in conjunction with New Building # 421133543 solely for a foundation and footing to vest into 421-A.
Q00748142-I1
02/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/17/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01360121-I1
02/13/2026
Permit issued — Plumbing
Q63546356-I1-PL
02/09/2026
Permit issued — Plumbing
Q40426327-I1-EW-SP
01/23/2026
Violation issued (ECB, closed)
Unknown
01/06/2026
Permit issued — Construction Fence
Q00510425-I1-FN
01/04/2026
Violation issued (ECB, closed)
Construction
01/04/2026
Violation issued (ECB, closed)
Construction
12/16/2025
Permit issued — Earth Work
Q00464572-I1-GC-CX
10/07/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Other
09/05/2025
Filed — Alteration
FILING FOR FOUNDATION AND STRUCTURAL WORK INCONJUNCTION WITH NEW BUILDING APPLICATION FILED UNDER JOB# 421133543
Q00464572-P3
08/11/2025
Permit issued — Earth Work
Q00464572-I1-GC-CX
08/08/2025
Permit issued — Support of Excavation
Q00464501-I1-SE
08/04/2025
Objection resolved — Addressed
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSolar Pro05/05/2026
DOB NOWPlumbingSigned-offPlumbing P & H02/13/2026
DOB NOWSprinklersSigned-offBruche Mechanical NY02/09/2026
DOB NOWConstruction FenceSigned-offPrime Construction USA01/06/2026
DOB NOWEarth WorkSigned-offPrime Construction USA12/16/2025
DOB NOWEarth WorkSigned-offPrime Construction USA08/11/2025
DOB NOWSupport of ExcavationSigned-offPrime Construction USA08/08/2025
DOB NOWSupported ScaffoldSigned-offTriera Contracting12/27/2024
DOB NOWSidewalk ShedSigned-offTriera Contracting12/27/2024
DOB NOWConstruction FenceSigned-offPrime Construction USA12/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offTriera Contracting12/09/2024
DOB NOWConstruction FenceSigned-offRoyal Builders Group12/09/2024
DOB NOWMechanical SystemsSigned-offRoyal Builders Group11/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offTriera Contracting11/14/2024
DOB NOWPlumbingSigned-offPlumbing P & H10/11/2024
DOB NOWSprinklersSigned-offBruche Mechanical NY09/26/2024
DOB NOWSupported ScaffoldSigned-offPrime Construction USA09/11/2024
DOB NOWSprinklersSigned-offLloyd G. Drummond08/14/2024
DOB NOWProtection and Mechanical MethodsSigned-offPrime Construction USA07/30/2024
DOB NOWSidewalk ShedSigned-offPrime Construction USA07/22/2024
DOB NOWPlumbingSigned-offLloyd G Drummond Plumbing & Gen06/28/2024
DOB NOWStructuralSigned-offPrime Construction USA06/20/2024
DOB NOWFoundationSigned-offPrime Construction USA02/08/2024
DOB NOWConstruction FenceSigned-offPrime Construction USA02/07/2024
DOB NOWSupport of ExcavationSigned-offPrime Construction USA02/07/2024
DOB NOWFoundationSigned-offRoyal Builders Group06/23/2023
DOB NOWSupport of ExcavationSigned-offRoyal Builders Group06/22/2023
DOB NOWConstruction FenceSigned-offRoyal Builders Group05/22/2023
DOB NOWConstruction FenceSigned-offRoyal Builders Group11/22/2022
DOB NOWFoundationSigned-offRoyal Builders Group06/10/2022
DOB NOWFoundationSigned-offRoyal Builders Group06/02/2022
DOB NOWConstruction FenceSigned-offRoyal Builders Group05/10/2021
BIS—ISSUEDPrime Construction USA01/04/2026
BIS—ISSUEDPrime Construction USA12/12/2025
BIS—ISSUEDPrime Construction USA04/18/2025
BIS—RE-ISSUEDRoyal Builders Group12/11/2024
BIS—ISSUEDPrime Construction USA02/08/2024
BIS—ISSUEDPrime Construction USA02/08/2024
BIS—ISSUEDRoyal Builders Group06/27/2023
BIS—ISSUEDRoyal Builders Group06/27/2023
1 project · most recent 07/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Signed-offRoyal Builders GroupHeating and Air Conditioning Systems, Ventilation Systems
Ventilation
Islandaire EZLT12B2C1S40AL 12,000 BTU · Ptac ×26
EZLT09B2C1S40AL 9,000 CFM · Ptac ×22
Greenheck CUE-099-A 600 CFM · Kitchen Exhaust ×9
CUE-095-VG 450 CFM · Kitchen Exhaust ×6
CUE-100-VG 750 CFM · Kitchen Exhaust ×3
G-095-VG 300 CFM · Exhaust Fan ×3
GREENHECK BSQ-180 4,400 CFM · Exhaust Fan ×3
ERVe-35-15H 2,250 CFM · Erv ×2
Renewaire ERVe-35-15H 2,250 CFM · Erv ×1
Heat / Cool
Amana PTH123G35AXXX 12,000 BTU · Ptac ×48
PTH093G35AXXX 9,000 CFM · Ptac ×46
1 project · most recent 05/03/2026
FiledStatusContractorScope
05/03/2026Signed-offLloyd G Drummond Plumbing & Gen900 heads
1 project · most recent 05/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/03/2026Signed-offLloyd G Drummond Plumbing & GenStorm, Water/Sanitary
5 projects · most recent 09/08/2026
General Wiring
FiledStatusContractorScope
09/08/2026CompleteWCK ElectricGeneral Wiring
02/17/2026CompleteFlow State Electric—
11/04/2024CancelledKwong Ming Electric—
07/22/2024CompleteRichard Neu—
06/27/2023CompleteJoseph Weinstein Electric1 meters, 1 new_meters
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026Signed-offSolar Pro16 panels, 9.44 kw, 4,211.81 roof_area_sqft
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/13/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/02/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
07/16/2026Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
07/16/2026Shutoff dampersBRIAN T. O'CONNORenergy_progress
07/16/2026HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
07/16/2026Maintenance informationBRIAN T. O'CONNORenergy_progress
07/16/2026HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
07/16/2026HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
07/16/2026FinalRONALD VILLANOprogress
07/16/2026Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
07/16/2026Mechanical SystemsBRIAN T. O'CONNORspecial
07/16/2026Heating SystemsBRIAN T. O'CONNORspecial
05/13/2026HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
05/13/2026HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
05/13/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN T. O'CONNORspecial
05/13/2026Sprinkler SystemsBRIAN T. O'CONNORspecial
05/13/2026Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
05/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBRIAN T. O'CONNORspecial
05/13/2026Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
05/13/2026Electrical motors and elevatorsBRIAN T. O'CONNORenergy_progress
05/13/2026HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
05/04/2026Air barrier - visual inspectionWilliam Aliceaenergy_progress
05/04/2026Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
05/04/2026Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/04/2026FinalRICHARD MUESCH JR.progress
05/04/2026Energy Code Compliance InspectionsWilliam Aliceaprogress
04/18/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN T. O'CONNORspecial
Latest 25 of 90.
▾Documents — 281 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch12
08/27/2026Q00510425-I1Request digital key ↗
08/26/2026Q00748142-I1Request digital key ↗
08/26/2026Q00753394-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Foundation5
08/25/2026Q00464572-I1Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Earthwork5
08/25/2026Q00464572-P3Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
08/25/2026Q00464572-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural5
08/25/2026Q00464572-I1Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction5
08/25/2026Q00464572-I1Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
08/25/2026Q00464572-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026Q00465950-P2Request digital key ↗
08/17/2026Q00465950-I1Request digital key ↗
08/17/2026Q00465950-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/25/2026Q00465972-P2Request digital key ↗
08/25/2026Q00465972-P1Request digital key ↗
08/25/2026Q00465972-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Support of Excavation4
08/25/2026Q00464501-P1Request digital key ↗
08/25/2026Q00464501-P3Request digital key ↗
08/15/2026Q00464501-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/17/2026Q00465950-P1Request digital key ↗
08/17/2026Q00465950-P2Request digital key ↗
08/17/2026Q00465950-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00464594-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION14
02/18/2026421133543Open ↗
07/07/2025440664559Open ↗
04/24/2025421133543Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION9
06/27/2025421133543Open ↗
06/27/2025421133543Open ↗
06/27/2025421133543Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/28/2022440664559Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/06/2026421133543Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING DIAGRAM5
04/25/2025421133543Open ↗
02/27/2023421133543Open ↗
01/30/2023421133543Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P1Open ↗
08/25/2026Q00464572-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/30/2022421133543Open ↗
▸BISVERIFY TAX LOT1
02/14/2026421133543Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/14/2026421133543Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/30/2022421133543Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature32
08/31/2026Q01360121-P1Open ↗
08/31/2026Q01360121-P1Open ↗
08/31/2026Q01360121-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/27/2026Q00464594-I1Open ↗
08/26/2026Q00753394-I1Open ↗
08/25/2026Q00464572-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026Q00464501-P1Open ↗
09/01/2026Q00464501-P1Open ↗
08/31/2026Q01360121-P1Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/05/2021440664559Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/05/2021440664559Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/06/2023421133543Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P1Open ↗
08/25/2026Q00464572-I1Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/18/2026421133543Open ↗
12/20/2022421133543Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/20/2022421133543Open ↗
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
12/30/2022421133543Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
02/22/2023421133543Open ↗
03/04/2022421133543Open ↗
02/05/2021440664559Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/04/2022421133543Open ↗
▸BISSTREET TREE SIGNOFF1
02/12/2026421133543Open ↗
▸Environmental & Asbestos44
▸DOB NOWOER: Notice to Proceed30
08/25/2026Q00464572-I1Open ↗
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/25/2026Q00464572-I1Open ↗
08/25/2026Q00464572-I1Open ↗
08/13/2026Q00465950-I1Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/04/2022421133543Open ↗
02/05/2021440664559Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/22/2023421133543Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/06/2023421133543Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/27/2023421133543Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/30/2022421133543Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/25/2026Q00464572-I1Open ↗
▸Inspections & Test Reports8
▸BISDEMOLITION (DM) JOB SIGNOFF2
06/27/2023421133543Open ↗
06/27/2023421133543Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/27/2023421133543Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/22/2023421133543Open ↗
▸BISSOIL REPORT1
03/04/2022421133543Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/06/2023421133543Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/06/2023421133543Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/27/2023421133543Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE6
04/24/2025421133543Open ↗
04/02/2025421133543Open ↗
03/10/2025421133543Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
07/03/2025421133543Open ↗
05/15/2025421133543Open ↗
05/06/2025421133543Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
07/03/2025421133543Open ↗
05/15/2025421133543Open ↗
05/06/2025421133543Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
08/25/2026Q00464572-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/25/2026Q00464572-I1Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
07/23/2025440664559Open ↗
07/12/2024440664559Open ↗
07/12/2024440664559Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
07/03/2025421133543Open ↗
05/15/2025421133543Open ↗
05/06/2025421133543Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/05/2021440664559Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/05/2021440664559Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial3
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P1Open ↗
08/25/2026Q00464572-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P1Open ↗
08/25/2026Q00464572-I1Open ↗
▸DOB NOWPlot Diagram3
08/25/2026Q00464572-P3Open ↗
08/25/2026Q00464572-P1Open ↗
08/25/2026Q00464572-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/25/2026Q00464572-I1Open ↗
08/13/2026Q00464501-I1Open ↗
▸BISLOWEST FLOOR ELEVATION1
06/27/2023421133543Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/28/2022440664559Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/05/2021440664559Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/27/2023421133543Open ↗
▸BISPLOT DIAGRAM1
12/30/2022421133543Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/22/2023421133543Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/25/2026Q00464572-I1Open ↗