← Back
BuildNYC
Two stories - detached, small or mid-size
187-28 MANGIN AVENUE
QUEENS · St. Albans · BIN 4221675
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
1,386 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/28/2014$400K—Rosh Acquisition → Private party$289/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Solar ElectlElectrical103/22/2026
Sunrun Installation ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/14/2025
Building Lifecycle
04/08/2026
Signed off — Alteration
Q01299989-I1
10/16/2025
Permit issued — Solar
Q01299989-I1-SL
10/14/2025
Filed — Alteration
Q01299989-I1
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service10/16/2025
3 projects · most recent 10/17/2025
General Wiring
FiledStatusContractorScope
10/17/2025CompleteCunningham ElectricGeneral Wiring
10/14/2025CompleteSunrun Solar Electl—
03/21/2025Permit IssuedIsland Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/08/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/08/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/08/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/08/2025FinalWalid Abdullaprogress
10/08/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account