Two family frame
187 BANCROFT AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5052121
💬 Discuss this project
1935Year Built
2.5Stories
B2Building Class
R3XZoning
1,820 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUST CONSULTING ENGINEERING201/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Inspection (5)
02/15/2022
Signed off — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK AS PER PLAN:INSTALL (2) NEW BOILERS AND (2) HOT WATER HEATERS ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00624390-I1
02/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2022
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK AS PER PLAN:INSTALL (2) NEW BOILERS AND (2) HOT WATER HEATERS ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00624390-P1
01/21/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/02/2021
Permit issued — Plumbing
S00624390-I1-PL
11/19/2021
Filed — Alteration
RENOVATION OF EXISTING 2-FAMILY HOUSE WITH PLUMBING WORK AS PER PLAN:INSTALL (2) NEW BOILERS AND (2) HOT WATER HEATERS ON CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
S00624390-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/02/2021
1 project · most recent 11/02/2021
General Wiring
FiledStatusContractorScope
11/02/2021CompleteALL AROUND ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00624390-P1Request digital key ↗
08/25/2026S00624390-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026S00624390-P1Open ↗
08/25/2026S00624390-I1Open ↗