← Back
Walk-up cooperative
187 PINEHURST AVENUE
MANHATTAN · BIN 1064354
💬 Discuss this project
1925Year Built
5Stories
C6Building Class
R7-2Zoning
34,200 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸
Walk-up cooperative · 10,000 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
187 PINEHURST OWNERS1907/08/2026
187 PINEHURST ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA304/05/2023
SRL ASSOCIATES112/27/2022
GREGORY V. PEROTTO, P.E.210/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE GENERAL CONSTRUCTIGeneral Contractor1707/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing203/22/2026
KING'S PLAZA PLBG & HTG IPlumbing207/08/2026
M & M PIPING AND HEATINGPlumbing203/22/2026
KINGS PLAZA P & H INCPlumbing207/08/2026
APOLLO PLBG & HTG INCPlumbing107/08/2026
NY PRO INTERIORSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519404/05/2023
BUTTERFIELD & O'CONNOR4189102/16/2023
GREGORY V. PEROTTO, P.E.947210/28/2021
Building Lifecycle
All (72)Filed (6)Permit Issued (13)Signed Off (6)Violation (34)Inspection (2)Special Inspection (11)
05/05/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/04/2026
Violation issued (ECB, open)
Construction
09/06/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
C
08/05/2025
Violation issued (HPD, closed)
B
02/25/2025
Violation issued (ECB, closed)
Construction
12/02/2024
Signed off — Alteration
Work in apartment 2G to repair damage to the finishes caused by fire. Update finishes repair fire damage areas, complete gut of apartment. No structural work, no changing of beams or structure under this application. No change in use egress or occupancy
M00803206-I1
07/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2023
Signed off — Alteration
INTERIOR RENOVATION INSIDE APARTMENTS 1C (1ST FL), 5C AND 5G (5TH FL) LIMITED TO FLOORING, SHEET-ROCK REPLACEMENT, AND PAINTING THROUGHOUT APARTMENT.
M00806436-I1
11/15/2023
Violation issued (HPD, closed)
I
10/11/2023
Permit issued — General Construction
M00806436-I1-GC
10/11/2023
Permit issued — General Construction
M00803206-I1-GC
09/19/2023
Signed off — Alteration
HEREWITH FILING TO COMBINE APARTMENTS 3H & 3G IN COMPLIANCE WITH TPPN #3/97. CAP AND REMOVE ALL GAS AND PLUMBING PIPING FROM THE KITCHEN ON APT 3G. CREATE TWO NEW OPENINGS ON EXIST. NON-LOAD BEARING PARTITIONS AS PER PLANS.
M00850156-I1
09/19/2023
Signed off — Alteration
HEREWITH FILING TO COMBINE APARTMENTS 3H & 3G IN COMPLIANCE WITH TPPN #3/97. CAP AND REMOVE ALL GAS AND PLUMBING PIPING FROM THE KITCHEN ON APT 3G. CREATE TWO NEW OPENINGS ON EXIST. NON-LOAD BEARING PARTITIONS AS PER PLANS.
M00850152-I1
07/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/14/2023
Permit issued — General Construction
M00850152-I1-GC
06/01/2023
Permit issued — General Construction
M00803206-I1-GC
06/01/2023
Permit issued — Plumbing
M00850156-I1-PL
06/01/2023
Permit issued — General Construction
M00806436-I1-GC
04/05/2023
Filed — Alteration
HEREWITH FILING TO COMBINE APARTMENTS 3H & 3G IN COMPLIANCE WITH TPPN #3/97. CAP AND REMOVE ALL GAS AND PLUMBING PIPING FROM THE KITCHEN ON APT 3G. CREATE TWO NEW OPENINGS ON EXIST. NON-LOAD BEARING PARTITIONS AS PER PLANS.
M00850156-I1
04/04/2023
Filed — Alteration
HEREWITH FILING TO COMBINE APARTMENTS 3H & 3G IN COMPLIANCE WITH TPPN #3/97. CAP AND REMOVE ALL GAS AND PLUMBING PIPING FROM THE KITCHEN ON APT 3G. CREATE TWO NEW OPENINGS ON EXIST. NON-LOAD BEARING PARTITIONS AS PER PLANS.
M00850152-I1
04/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
03/30/2023
Violation issued (ECB, closed)
Construction
03/27/2023
Special inspection requirement — Final
Vicente Varela
03/23/2023
Permit issued — General Construction
M00803206-I1-GC
03/21/2023
Permit issued — General Construction
M00806436-I1-GC
02/16/2023
Filed — Alteration
INTERIOR RENOVATION INSIDE APARTMENTS 1C (1ST FL), 5C AND 5G (5TH FL) LIMITED TO FLOORING, SHEET-ROCK REPLACEMENT, AND PAINTING THROUGHOUT APARTMENT.
M00806436-I1
02/01/2023
Signed off — Alteration
INSTALL 3" DIAMETER X APPROXIMATELY 20' GAS LINE FROM NEW OSP METER TO NEW DUAL FUEL BURNER IN CELLAR. BURNER FILED UNDER PW1# 123778974. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00186104-I1
01/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/19/2023
Permit issued — General Construction
M00803206-I1-GC
01/11/2023
Signed off — Alteration
INSTALL 3" DIAMETER X APPROXIMATELY 20' GAS LINE FROM NEW OSP METER TO NEW DUAL FUEL BURNER IN CELLAR. BURNER FILED UNDER PW1# 123778974. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00186104-S1
01/02/2023
Special inspection requirement — Final
Vicente Varela
01/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
12/27/2022
Filed — Alteration
Work in apartment 2G to repair damage to the finishes caused by fire. Update finishes repair fire damage areas, complete gut of apartment. No structural work, no changing of beams or structure under this application. No change in use egress or occupancy
M00803206-I1
12/15/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2022
Permit issued — Plumbing
M00186104-I1-PL
11/02/2022
Violation issued (HPD, closed)
I
02/16/2022
Violation issued (HPD, closed)
A
01/21/2022
Violation issued (HPD, closed)
I
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
B
01/10/2022
Violation issued (HPD, closed)
C
01/10/2022
Violation issued (HPD, closed)
C
01/10/2022
Violation issued (HPD, closed)
B
11/05/2021
Permit issued — Plumbing
M00186104-S1-PL
10/28/2021
Filed — Alteration
INSTALL 3" DIAMETER X APPROXIMATELY 20' GAS LINE FROM NEW OSP METER TO NEW DUAL FUEL BURNER IN CELLAR. BURNER FILED UNDER PW1# 123778974. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00186104-S1
10/26/2021
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
10/26/2021
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
10/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
10/26/2021
Special inspection requirement — Energy Code Compliance Inspections
Gregory Perotto
10/26/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
10/26/2021
Special inspection requirement — Maintenance information
Gregory Perotto
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI10/11/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI10/11/2023
DOB NOWGeneral ConstructionSigned-offNY PRO INTERIORS06/14/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI06/01/2023
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC06/01/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI06/01/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI03/23/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI03/21/2023
DOB NOWGeneral ConstructionSigned-offUNIQUE GENERAL CONSTRUCTI01/19/2023
DOB NOWPlumbingSigned-offKING'S PLAZA PLBG & HTG I11/25/2022
DOB NOWPlumbingSigned-offKINGS PLAZA P & H INC11/05/2021
DOB NOWPlumbingSigned-offKING'S PLAZA PLBG & HTG I03/03/2021
DOB NOWPlumbingSigned-offKINGS PLAZA P & H INC07/26/2019
BISFBISSUEDS.J. FUEL CO., INC03/29/2021
BISPLISSUEDWF PLUMBING AND HEATING L07/21/2017
BISOTISSUEDNY PRO INTERIORS06/27/2017
BISOTISSUEDNY PRO INTERIORS07/11/2016
BISOTISSUEDCHAMPION SERVICES INC04/04/2012
BISEQISSUEDS.P.S. NY CONSTRUCTION CO05/31/2011
2 projects · most recent 04/29/2023
General Wiring
FiledStatusContractorScope
04/29/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
02/22/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/03/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
03/27/2023FinalVicente Varelaprogress
01/25/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/02/2023FinalVicente Varelaprogress
01/02/2023Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
10/26/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
10/26/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
10/26/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
10/26/2021Energy Code Compliance InspectionsGregory Perottoprogress
10/26/2021HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
10/26/2021Maintenance informationGregory Perottoenergy_progress
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026M00186104-S1Request digital key ↗
09/01/2026M00803206-I1Request digital key ↗
08/31/2026M00806436-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00186104-I1Request digital key ↗
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION9
03/29/2021123778974Open ↗
03/29/2021123778974Open ↗
07/23/2019123778974Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
03/16/2021123778974Open ↗
07/23/2019123778974Open ↗
04/29/2016122702753Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026M00806436-I1Open ↗
09/01/2026M00850152-I1Open ↗
08/25/2026M00186104-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/23/2019123778974Open ↗
05/25/2016122702753Open ↗
04/29/2016122702753Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00186104-S1Open ↗
09/03/2026M00186104-I1Open ↗
09/01/2026M00803206-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00806436-I1Open ↗
09/02/2026M00806436-I1Open ↗
09/01/2026M00850152-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/23/2019123778974Open ↗
11/02/2011120706584Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/23/2019123778974Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/03/2011120706584Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/10/2020123778974Open ↗
07/23/2019123778974Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/29/2016122702753Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
07/23/2019123778974Open ↗
04/29/2016122702753Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00186104-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00186104-S1Open ↗
09/03/2026M00186104-I1Open ↗
09/01/2026M00803206-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/23/2019123778974Open ↗
04/29/2016122702753Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/03/2011120706584Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/22/2012120982302Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/23/2019123778974Open ↗
05/25/2016122702753Open ↗
04/29/2016122702753Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
10/07/2021123778974Open ↗
10/13/2017122702753Open ↗
08/10/2012120982302Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/07/2021123778974Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/22/2012120982302Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00186104-S1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2021123778974Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/07/2021123778974Open ↗
10/13/2017122702753Open ↗
08/10/2012120982302Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
03/22/2012120982302Open ↗
06/03/2011120706584Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
10/07/2021123778974Open ↗
07/23/2019123778974Open ↗
10/13/2017122702753Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026M00186104-I1Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
07/23/2019123778974Open ↗
04/29/2016122702753Open ↗
03/22/2012120982302Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/29/2021123778974Open ↗
03/29/2021123778974Open ↗
10/13/2017122702753Open ↗
▸BISADDITIONAL INFORMATION2
06/08/2020123778974Open ↗
05/25/2016122702753Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/10/2012120982302Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
04/06/2012120982302Open ↗