← Back
Three families
187 RUSSELL STREET
BROOKLYN · BIN 3066417
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,192 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.6 FAR built · Flood zone X500
Locations of Work
Plumbing
Floor 31p · 1 filing · 14 docs
Floor 2
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAB ENGINEERING PC606/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BZ CONSTRUCTION OF NY LLCGeneral Contractor707/08/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
FSM ELECTRICAL CORPORATIOElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EAB ENGINEERING, PC2048606/06/2024
Building Lifecycle
All (99)Filed (6)Permit Issued (6)Signed Off (2)Violation (12)Inspection (7)Objection (36)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
08/29/2024
Signed off — Alteration
REMOVE ALL PLUMBING FIXTURES FROM CELLAR AND 2-3 FLOORS AND INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED HEREWITH.
B08015976-I1
07/01/2024
Signed off — Alteration
REMOVE / INSTALL PARTITIONS IN CELLAR AND 2-3 FLOORS. INSTALL NON-COMBUSTIBLE DECK AT REAR YARD. CREATE ACCESS DOOR TO REAR YARD FROM CELLAR AND 1ST FLOOR. INSTALL MINI SPLIT AC SYSTEM AND REPLACE SIDING AND WINDOWS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B08016368-I1
06/27/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2024
Filed — Alteration
REMOVE / INSTALL PARTITIONS IN CELLAR AND 2-3 FLOORS. INSTALL NON-COMBUSTIBLE DECK AT REAR YARD. CREATE ACCESS DOOR TO REAR YARD FROM CELLAR AND 1ST FLOOR. INSTALL MINI SPLIT AC SYSTEM AND REPLACE SIDING AND WINDOWS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B08016368-P2
06/04/2024
Special inspection requirement — Concrete - Cast-In-Place
Iraj Issapour
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
06/04/2024
Special inspection requirement — Mechanical Systems
Iraj Issapour
06/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Iraj Issapour
06/04/2024
Special inspection requirement — Structural Steel - Details
Iraj Issapour
06/04/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Iraj Issapour
06/04/2024
Special inspection requirement — Final
Iraj Issapour
06/04/2024
Special inspection requirement — Air barrier - visual inspection
Iraj Issapour
06/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Iraj Issapour
06/04/2024
Special inspection requirement — Lighting controls
Iraj Issapour
06/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Iraj Issapour
06/04/2024
Special inspection requirement — Interior lighting power
Iraj Issapour
06/04/2024
Special inspection requirement — Maintenance information
Iraj Issapour
06/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Iraj Issapour
06/04/2024
Special inspection requirement — Lighting in dwelling units
Iraj Issapour
06/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
06/04/2024
Special inspection requirement — Fenestration areas
Iraj Issapour
06/04/2024
Special inspection requirement — Fenestration air leakage
Iraj Issapour
05/29/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/11/2024
Violation issued (HPD, closed)
A
03/06/2024
Permit issued — Structural
B08016368-I1-GC-CX
02/16/2024
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES FROM CELLAR AND 2-3 FLOORS AND INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED HEREWITH.
B08015976-P2
02/01/2024
Permit issued — Plumbing
B08015976-I1-PL
01/31/2024
Violation issued (ECB, closed)
Unknown
08/02/2023
Permit issued — Structural
B08016368-I1-GC-CX
06/29/2023
Permit issued — Structural
B08016368-I1-GC-CX
03/24/2023
Violation issued (HPD, closed)
A
03/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/08/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection resolved — Addressed
02/28/2023
Objection resolved — Addressed
02/27/2023
Objection raised — Other
02/27/2023
Objection raised — Other
02/27/2023
Objection raised — Other
02/27/2023
Objection raised — Other
02/27/2023
Objection raised — Other
02/20/2023
Objection resolved — Addressed
02/20/2023
Objection resolved — Addressed
02/20/2023
Objection resolved — Addressed
02/20/2023
Objection resolved — Addressed
02/20/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/17/2023
Objection resolved — Addressed
02/11/2023
Objection raised — Other
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBZ CONSTRUCTION OF NY LLC03/06/2024
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC02/01/2024
DOB NOWStructuralSigned-offBZ CONSTRUCTION OF NY LLC08/02/2023
DOB NOWStructuralSigned-offBZ CONSTRUCTION OF NY LLC06/29/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/07/2022
DOB NOWStructuralSigned-offBZ CONSTRUCTION OF NY LLC11/28/2022
1 project · most recent 12/07/2022
General Wiring
FiledStatusContractorScope
12/07/2022CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/04/2024Concrete - Cast-In-PlaceIraj Issapourspecial
06/04/2024Fire-Resistant Penetrations and JointsIraj Issapourspecial
06/04/2024Mechanical SystemsIraj Issapourspecial
06/04/2024Structural Stability – Alterations of existing buildingsIraj Issapourspecial
06/04/2024Structural Steel - DetailsIraj Issapourspecial
06/04/2024Structural Steel - High Strength BoltingIraj Issapourspecial
06/04/2024FinalIraj Issapourprogress
06/04/2024Air barrier - visual inspectionIraj Issapourenergy_progress
06/04/2024HVAC-R and service water heating equipmentIraj Issapourenergy_progress
06/04/2024Lighting controlsIraj Issapourenergy_progress
06/04/2024HVAC-R and service water heating system controlsIraj Issapourenergy_progress
06/04/2024Interior lighting powerIraj Issapourenergy_progress
06/04/2024Maintenance informationIraj Issapourenergy_progress
06/04/2024Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
06/04/2024Lighting in dwelling unitsIraj Issapourenergy_progress
06/04/2024HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
06/04/2024Fenestration areasIraj Issapourenergy_progress
06/04/2024Fenestration air leakageIraj Issapourenergy_progress
01/26/2023Concrete - Cast-In-PlaceIraj Issapourspecial
01/26/2023Fire-Resistant Penetrations and JointsIraj Issapourspecial
01/26/2023Mechanical SystemsIraj Issapourspecial
01/26/2023Structural Stability – Alterations of existing buildingsIraj Issapourspecial
01/26/2023Structural Steel - DetailsIraj Issapourspecial
01/26/2023Structural Steel - High Strength BoltingIraj Issapourspecial
01/26/2023FinalIraj Issapourprogress
Latest 25 of 41.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08016368-P2Request digital key ↗
08/28/2026B08016368-I1Request digital key ↗
08/28/2026B08015976-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature28
09/27/2026B08016368-P2Open ↗
09/27/2026B08016368-P2Open ↗
09/27/2026B08016368-P2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026B08016368-P2Open ↗
09/27/2026B08016368-P2Open ↗
09/27/2026B08016368-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B08016368-P2Open ↗
08/28/2026B08016368-P1Open ↗
08/28/2026B08016368-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026B08016368-I1Open ↗
08/28/2026B08016368-P2Open ↗
08/28/2026B08015976-P1Open ↗
Showing 3 of 6 on file for this type