← Back
BuildNYC
Three families
187 RUSSELL STREET
BROOKLYN · Greenpoint · BIN 3066417
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6BZoning
3,192 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.6 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstall partitions and AC system24p · 1 filing · 20 docs
Floor 3Install partitions and AC system34p · 2 filings · 20 docs
Floor 2Unit 2R33p · 2 filings · 20 docs
Floor 1Install partitions and AC system24p · 1 filing · 20 docs
CellarInstall partitions and AC system33p · 2 filings · 20 docs
Site & exteriorInstall partitions and AC system24p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eab Engineering606/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BZ Construction of NYGeneral Contractor507/08/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
BZ Constructionspecialty_contractor203/21/2026
FSM ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eab Engineering2048606/06/2024
Building Lifecycle
05/05/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/10/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
08/29/2024
Signed off — Alteration
REMOVE ALL PLUMBING FIXTURES FROM CELLAR AND 2-3 FLOORS AND INSTALL NEW PLUMBING FIXTURES AS PER PLAN SUBMITTED HEREWITH.
B08015976-I1
07/01/2024
Signed off — Alteration
REMOVE / INSTALL PARTITIONS IN CELLAR AND 2-3 FLOORS. INSTALL NON-COMBUSTIBLE DECK AT REAR YARD. CREATE ACCESS DOOR TO REAR YARD FROM CELLAR AND 1ST FLOOR. INSTALL MINI SPLIT AC SYSTEM AND REPLACE SIDING AND WINDOWS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B08016368-I1
06/27/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBZ Construction of NY03/06/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/01/2024
DOB NOWGeneral ConstructionSigned-offBZ Construction of NY08/02/2023
DOB NOWMechanical SystemsSigned-offBZ Construction of NY06/29/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating12/07/2022
DOB NOWMechanical SystemsSigned-offBZ Construction of NY11/28/2022
1 project · most recent 12/07/2022
General Wiring
FiledStatusContractorScope
12/07/2022CompleteFSM ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/27/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2024Fail-Final General Construction Non-Directive 14FailView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/21/2024Fenestration air leakageIraj Issapourenergy_progress
06/21/2024HVAC-R and service water heating equipmentIraj Issapourenergy_progress
06/21/2024Interior lighting powerIraj Issapourenergy_progress
06/21/2024Air barrier - visual inspectionIraj Issapourenergy_progress
06/21/2024HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
06/21/2024Fire-Resistant Penetrations and JointsIraj Issapourspecial
06/21/2024Concrete - Cast-In-PlaceIraj Issapourspecial
06/21/2024Structural Steel - High Strength BoltingIraj Issapourspecial
06/21/2024Structural Steel - DetailsIraj Issapourspecial
06/21/2024Mechanical SystemsIraj Issapourspecial
06/21/2024Structural Stability – Alterations of existing buildingsIraj Issapourspecial
06/21/2024FinalIraj Issapourprogress
06/21/2024HVAC-R and service water heating system controlsIraj Issapourenergy_progress
06/21/2024Lighting in dwelling unitsIraj Issapourenergy_progress
06/21/2024Maintenance informationIraj Issapourenergy_progress
06/21/2024Fenestration areasIraj Issapourenergy_progress
06/21/2024Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
06/21/2024Lighting controlsIraj Issapourenergy_progress
06/04/2024Fenestration air leakageIraj Issapourenergy_progress
06/04/2024Concrete - Cast-In-PlaceIraj Issapourspecial
06/04/2024Fire-Resistant Penetrations and JointsIraj Issapourspecial
06/04/2024Mechanical SystemsIraj Issapourspecial
06/04/2024Structural Stability – Alterations of existing buildingsIraj Issapourspecial
06/04/2024Structural Steel - DetailsIraj Issapourspecial
06/04/2024Structural Steel - High Strength BoltingIraj Issapourspecial
Latest 25 of 59.
77 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account