Two family brick
187 TERRACE PLACE
BROOKLYN · BIN 3121801
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R5BZoning
2,400 sfGross Floor Area
2Units
Two family brick · 2,380 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 2 filings · 16 docs
Floor 1
Cellar2p · 1 filing · 5 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2021$2.1M—Private party → Private party$875/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC106/14/2024
ROGER DE ELECTRIC CO.302/03/2023
M JUST ARCHITECTURE PC107/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE103/21/2026
SALAMON ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTER RENOVATION INCGeneral Contractor303/21/2026
TUMEN, INCGeneral Contractor303/21/2026
J.A.J CONTRACTING CORPGeneral Contractor203/21/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247106/14/2024
SALAMON ENGINEERING PLLC1264202/03/2023
CONSULTING ENGINEER5093107/27/2021
Building Lifecycle
All (28)Filed (5)Permit Issued (4)Signed Off (4)Inspection (5)Objection (2)Special Inspection (8)
03/19/2025
Signed off — Alteration
B01055141-I1
03/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/14/2024
Permit issued — Earth Work
B01055141-I1-GC-CX
06/14/2024
Filed — Alteration
B01055141-I1
02/06/2023
Signed off — Alteration
Interior renovations, installation of new door on west facade, and installation of exterior stairs.
B00659027-I1
02/03/2023
Filed — Alteration
Interior renovations, installation of new door on west facade, and installation of exterior stairs.
B00659027-P1
02/03/2023
Special inspection requirement — Final
David Salamon
02/03/2023
Special inspection requirement — Lighting in dwelling units
David Salamon
02/03/2023
Special inspection requirement — Masonry
David Salamon
01/31/2023
Signed off — Alteration
B00658976-I1
01/31/2023
Special inspection requirement — Lighting in dwelling units
David Salamon
01/31/2023
Special inspection requirement — Masonry
David Salamon
01/31/2023
Special inspection requirement — Final
David Salamon
06/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2022
Permit issued — Plumbing
B00658976-I1-PL
01/31/2022
Permit issued — General Construction
B00659027-I1-GC
01/25/2022
Filed — Alteration
Interior renovations, installation of new door on west facade, and installation of exterior stairs.
B00659027-I1
01/25/2022
Filed — Alteration
B00658976-I1
09/15/2021
Signed off — Alteration
general construction to include removal and disposal of interior partitions, doors, replace concrete slab at cellar indicated on drawings filed herewith. No change in use egress or occupancy under this application.
B00559484-I1
08/31/2021
Permit issued — General Construction
B00559484-I1-GC
07/28/2021
Objection raised — Scope
07/28/2021
Objection resolved — Addressed
07/27/2021
Filed — Alteration
general construction to include removal and disposal of interior partitions, doors, replace concrete slab at cellar indicated on drawings filed herewith. No change in use egress or occupancy under this application.
B00559484-I1
07/16/2021
Special inspection requirement — Final
John Natoli
07/16/2021
Special inspection requirement — Concrete - Cast-In-Place
John Natoli
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offINTER RENOVATION INC08/14/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC02/10/2022
DOB NOWGeneral ConstructionSigned-offTUMEN, INC01/31/2022
DOB NOWGeneral ConstructionSigned-offJ.A.J CONTRACTING CORP08/31/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/03/2023FinalDavid Salamonprogress
02/03/2023Lighting in dwelling unitsDavid Salamonenergy_progress
02/03/2023MasonryDavid Salamonspecial
01/31/2023Lighting in dwelling unitsDavid Salamonenergy_progress
01/31/2023MasonryDavid Salamonspecial
01/31/2023FinalDavid Salamonprogress
07/16/2021FinalJohn Natoliprogress
07/16/2021Concrete - Cast-In-PlaceJohn Natolispecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00658976-I1Request digital key ↗
08/31/2026B00659027-P1Request digital key ↗
08/31/2026B00659027-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00559484-I1Open ↗
08/31/2026B00658976-I1Open ↗
08/31/2026B00659027-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B00659027-P1Open ↗
09/02/2026B00659027-P1Open ↗
09/01/2026B00559484-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00659027-P1Open ↗
09/01/2026B00559484-I1Open ↗
08/27/2026B00659027-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00658976-I1Open ↗
08/31/2026B00659027-I1Open ↗
08/31/2026B00659027-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/31/2026B00659027-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01055141-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01055141-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01055141-I1Open ↗
▸Other Documents3
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01055141-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01055141-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
08/13/2026B01055141-I1Open ↗