← Back
Orphanage
1870 SCHIEFFELIN PLACE
BRONX · BIN 2097408
💬 Discuss this project
1930Year Built
2Stories
N3Building Class
R5Zoning
35,325 sfGross Floor Area
1Units
14 Open Violations 0 unresolved · 14 paperwork only ▸FDNY Report ↗
Orphanage · 202,828 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 8 docs
Floor 12p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPMENT CORP2807/08/2026
ROCK GROUP NY1007/08/2026
NEW YORK CITY ECONOMIC DEVELOPMENT807/08/2026
NYCDDC303/22/2026
YMCA103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP HABIB & ASSOCIATES203/21/2022
MARVEL ARCHITECTS807/01/2021
POLISE CONSULTING ENGINEERS DPC306/29/2021
HC ARCHITECT, PC404/23/2021
JACOBS104/12/2021
ASIF JAMIL, RA301/31/2020
HOWARD I SHAPIRO & ASSOCIATES101/29/2020
THINK DESIGN ARCHITECTURE106/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.2503/21/2026
CAESAR BUSTAMANTE AIA203/21/2026
JP EXPEDITE803/21/2026
GREEN STUDIO603/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GILBANE RESIDENTIAL CONSTGeneral Contractor1007/08/2026
ROCK GROUP NY CORPGeneral Contractor407/08/2026
SIGNS CADScaffold307/08/2026
LONG ISLAND CONCRETE INCGeneral Contractor207/08/2026
ASHNU INTERNATIONAL INCGeneral Contractor203/21/2026
GILBANE BUILDING COMPANYGeneral Contractor203/21/2026
BOBTEK ELECTRICAL CORP.Electrical103/22/2026
SIGNS CAD CORPGeneral Contractor107/08/2026
ASPRO PLUMBING INCPlumbing107/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267306/29/2021
BEYOND ARCH LLC3600104/23/2021
Building Lifecycle
All (123)Filed (23)Permit Issued (15)Signed Off (11)Violation (4)Inspection (3)Objection (46)Special Inspection (21)
11/12/2025
Violation issued (FDNY_ORDER, closed)
11/12/2025
Violation issued (FDNY_ORDER, closed)
10/19/2023
Violation issued (FDNY_ORDER, closed)
10/19/2023
Violation issued (FDNY_ORDER, closed)
08/18/2022
Signed off — Alteration
Installation of temporary construction fence as per plans filed herewith. This application is filed in conjunction with DM-220721529.
X00296463-I1
06/30/2022
Signed off — Alteration
X00678457-I1
06/29/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/14/2022
Permit issued — Curb Cut
X00678457-I1-CC
04/20/2022
Signed off — Alteration
APPLICATION FILED FOR INSTALLATION OF 8'-0" HIGH TEMPORARY CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH NEW BUILDING # 210178065.
X00172202-I1
04/11/2022
Signed off — Alteration
installation of 30' curb cut including splays
X00071611-I1
03/21/2022
Filed — Alteration
X00678457-I1
03/21/2022
Permit issued — Curb Cut
X00071611-I1-CC
11/09/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00248307-I1
10/04/2021
Signed off — Alteration
X00500368-I1
10/04/2021
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY PYLON SIGN ON THE GROUND PYLON SIGN STRUCTURE #X00500396, INSIDE OF PROPERTY LINE,, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
X00500407-I1
10/04/2021
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN @SCHIEFFELIN PLACE ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
X00500361-I1
10/04/2021
Signed off — Alteration
ERECT ACCESSORY PYLON SIGN STRUCTURE AND CONCRETE FOOTING ON THE GROUND INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00500396-I1
09/27/2021
Signed off — Alteration
installation of 2 pool heaters
X00462646-I1
08/25/2021
Signed off — Alteration
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR HOSPITAL OCCUPANCY PURSUANT TO SECTION AC 28-111 IN CONJUNCTION WITH COVID 19 vaccinations.
X00498724-I1
07/06/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
07/02/2021
Objection resolved — Addressed
07/02/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
07/01/2021
Filed — No Work
X00359680-P4
06/30/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/29/2021
Filed — Alteration
installation of 2 pool heaters
X00462646-P2
06/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
PAULA M. ZIMIN
06/29/2021
Special inspection requirement — Maintenance information
PAULA M. ZIMIN
06/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
PAULA M. ZIMIN
06/29/2021
Special inspection requirement — Heating Systems
Matthew Wavro
06/21/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
06/11/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/04/2021
Filed — Alteration
installation of 2 pool heaters
X00462646-P1
05/28/2021
Special inspection requirement — Maintenance information
PAULA M. ZIMIN
05/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
PAULA M. ZIMIN
05/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
PAULA M. ZIMIN
05/28/2021
Special inspection requirement — Heating Systems
Matthew Wavro
05/17/2021
Permit issued — Boiler Equipment
X00462646-I1-BE
04/27/2021
Permit issued — Structural
X00500396-I1-ST
04/23/2021
Filed — Alteration
ERECT ACCESSORY PYLON SIGN STRUCTURE AND CONCRETE FOOTING ON THE GROUND INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00500396-I1
04/23/2021
Permit issued — Sign
X00500361-I1-SG
04/23/2021
Permit issued — Sign
X00500407-I1-SG
04/23/2021
Permit issued — Sign
X00500368-I1-SG
04/16/2021
Filed — Alteration
X00500368-I1
04/16/2021
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY PYLON SIGN ON THE GROUND PYLON SIGN STRUCTURE #X00500396, INSIDE OF PROPERTY LINE,, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
X00500407-I1
04/16/2021
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY WALL SIGN @SCHIEFFELIN PLACE ELEVATION, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
X00500361-I1
04/15/2021
Permit issued — General Construction
X00498724-I1-GC
04/12/2021
Filed — Alteration
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR HOSPITAL OCCUPANCY PURSUANT TO SECTION AC 28-111 IN CONJUNCTION WITH COVID 19 vaccinations.
X00498724-I1
04/08/2021
Special inspection requirement — Concrete - Cast-In-Place
Hackjong Choi
04/08/2021
Special inspection requirement — Final
Hackjong Choi
04/08/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Hackjong Choi
04/02/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
03/29/2021
Permit issued — Construction Fence
X00172202-I1-FN
03/25/2021
Objection resolved — Addressed
02/19/2021
Objection raised — Other
02/18/2021
Objection raised — Scope
02/17/2021
Filed — Alteration
installation of 2 pool heaters
X00462646-I1
02/17/2021
Filed — No Work
X00359712-P1
02/17/2021
Filed — No Work
X00359706-P1
02/17/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
02/17/2021
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Wavro
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLONG ISLAND CONCRETE INC06/14/2022
DOB NOWCurb CutSigned-offGILBANE BUILDING COMPANY03/21/2022
DOB NOWBoiler EquipmentSigned-offASPRO PLUMBING INC05/17/2021
DOB NOWStructuralSigned-offSIGNS CAD CORP04/27/2021
DOB NOWSignSigned-offFRANK ZANFARDINO04/23/2021
DOB NOWSignSigned-offFRANK ZANFARDINO04/23/2021
DOB NOWSignSigned-offFRANK ZANFARDINO04/23/2021
DOB NOWGeneral ConstructionSigned-offERNEST KURIQI04/15/2021
DOB NOWConstruction FenceSigned-offGILBANE RESIDENTIAL CONST03/29/2021
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP09/25/2020
DOB NOWConstruction FenceSigned-offLONG ISLAND CONCRETE INC01/30/2020
DOB NOWConstruction FenceSigned-offGILBANE RESIDENTIAL CONST01/09/2020
DOB NOWConstruction FenceSigned-offGILBANE RESIDENTIAL CONST12/31/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP11/06/2019
DOB NOWConstruction FenceSigned-offGILBANE RESIDENTIAL CONST06/10/2019
8 projects · most recent 07/03/2021
General Wiring
FiledStatusContractorScope
07/03/2021CompleteLERCO ELECTRIC LLCGeneral Wiring
07/01/2021CompleteLERCO ELECTRIC LLCGeneral Wiring
05/04/2021CompleteARK SYSTEMS ELEC. CORP—
12/07/2020CompleteLERCO ELECTRIC LLCGeneral Wiring
06/12/2020CompleteTUXEDO ELEC'L CONTR'G INC—
10/23/2019CompleteB.P. ELECTRIC CORP—
08/06/2019CompleteLERCO ELECTRIC LLCGeneral Wiring
08/06/2019CompleteLERCO ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/29/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2021Pass-Final Boiler Equipment InspectionPassView ↗
06/11/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/06/2021Public Assembly Emergency LightingMatthew Wavroprogress
07/02/2021Public Assembly Emergency LightingMatthew Wavroprogress
06/29/2021HVAC-R and service water heating equipmentPAULA M. ZIMINenergy_progress
06/29/2021Maintenance informationPAULA M. ZIMINenergy_progress
06/29/2021HVAC-R and service water heating system controlsPAULA M. ZIMINenergy_progress
06/29/2021Heating SystemsMatthew Wavrospecial
06/21/2021Public Assembly Emergency LightingMatthew Wavroprogress
05/28/2021Maintenance informationPAULA M. ZIMINenergy_progress
05/28/2021HVAC-R and service water heating equipmentPAULA M. ZIMINenergy_progress
05/28/2021HVAC-R and service water heating system controlsPAULA M. ZIMINenergy_progress
05/28/2021Heating SystemsMatthew Wavrospecial
04/08/2021Concrete - Cast-In-PlaceHackjong Choispecial
04/08/2021FinalHackjong Choiprogress
04/08/2021Structural Steel - High Strength BoltingHackjong Choispecial
04/02/2021Public Assembly Emergency LightingMatthew Wavroprogress
02/17/2021Public Assembly Emergency LightingMatthew Wavroprogress
02/17/2021Public Assembly Emergency LightingMatthew Wavroprogress
06/18/2020Public Assembly Emergency LightingMatthew Wavroprogress
06/18/2020Public Assembly Emergency LightingMatthew Wavroprogress
02/03/2020Finalasif jamilprogress
01/14/2020FinalLawrence Shapiroprogress
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch - Place of Assembly8
08/25/2026X00359706-I1Request digital key ↗
08/25/2026X00359680-P4Request digital key ↗
08/15/2026X00359712-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch7
08/25/2026X00498724-I1Request digital key ↗
08/25/2026X00500368-I1Request digital key ↗
08/25/2026X00500361-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
08/26/2026X00248307-P2Request digital key ↗
08/26/2026X00248307-I1Request digital key ↗
08/15/2026X00248307-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/25/2026X00462646-I1Request digital key ↗
08/25/2026X00462646-P1Request digital key ↗
08/15/2026X00462646-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
08/26/2026X00172202-I1Request digital key ↗
08/26/2026X00296463-I1Request digital key ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/26/2026X00172202-I1Open ↗
08/26/2026X00248307-P1Open ↗
08/26/2026X00248307-P2Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026X00359712-P1Open ↗
09/01/2026X00359680-P4Open ↗
08/29/2026X00359712-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026X00462646-P1Open ↗
08/26/2026X00500396-I1Open ↗
08/26/2026X00500396-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00462646-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00462646-I1Open ↗
▸Approvals, Objections & Sign-offs37
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/25/2026X00359706-I1Open ↗
08/25/2026X00462646-I1Open ↗
08/25/2026X00462646-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/13/2026X00248307-I1Open ↗
08/13/2026X00678457-I1Open ↗
08/13/2026X00462646-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/13/2026X00500407-I1Open ↗
08/13/2026X00500368-I1Open ↗
08/13/2026X00500396-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents5
▸DOB NOWSupporting Document2
08/13/2026X00360117-I1Open ↗
08/13/2026X00359680-I1Open ↗
▸DOB NOWAdditional Documents (Photos)2
08/13/2026X00359693-I1Open ↗
08/13/2026X00359693-I1Open ↗
▸DOB NOWAlternate Plan 11
08/15/2026X00360117-I1Open ↗