Predominantly retail with other uses
1872 EAST TREMONT AVENUE
BRONX · Soundview-Bruckner-Bronx River · BIN 2028719
💬 Discuss this project
1929Year Built
1Stories
K4Building Class
R8XZoning
22,787 sfGross Floor Area
4Units
9 Open Violations 8 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: 1872 EAST TREMONT CORP. · 11,394 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 1 filing · 20 docs
Floor 116p · 3 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Filed — no permit issued16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1872 EAST TREMONT803/22/2026
Gopuff507/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC1803/21/2026
ARCTONE GROUP INC ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COCHRANE PLBG & HTGPlumbing407/08/2026
TONY'S CONTRACTINGGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing307/08/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,13521102/12/2025
Building Lifecycle
All (92)Filed (13)Permit Issued (7)Signed Off (2)Violation (17)Inspection (9)Objection (14)Special Inspection (30)
02/10/2026
Filed — No Work
X01357100-I1
02/08/2026
Special inspection requirement — Public Assembly Emergency Lighting
Olusoji Ojeyemi
08/27/2025
Signed off — Alteration
APPLICATION FILED FOR MINOR INTERIOR CHANGES CONSISTING OF REMOVING RACKS AND INSTALLING NEW EQUIPMENT FOR NEW SALES ITEMS IN EXISTING 1ST FLOOR COMMERCIAL SPACE AT EXISTING 1 STOR Y COMMERCIAL BUILDING. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X01168717-S1
08/27/2025
Signed off — Alteration
APPLICATION FILED FOR MINOR INTERIOR CHANGES CONSISTING OF REMOVING RACKS AND INSTALLING NEW EQUIPMENT FOR NEW SALES ITEMS IN EXISTING 1ST FLOOR COMMERCIAL SPACE AT EXISTING 1 STOR Y COMMERCIAL BUILDING. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X01168717-I1
07/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/16/2025
Permit issued — Plumbing
X01168717-S1-PL
04/23/2025
Permit issued — General Construction
X01168717-I1-GC
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Other
02/12/2025
Filed — Alteration
APPLICATION FILED FOR MINOR INTERIOR CHANGES CONSISTING OF REMOVING RACKS AND INSTALLING NEW EQUIPMENT FOR NEW SALES ITEMS IN EXISTING 1ST FLOOR COMMERCIAL SPACE AT EXISTING 1 STOR Y COMMERCIAL BUILDING. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X01168717-S1
02/12/2025
Objection raised — Admin
02/05/2025
Filed — Alteration
APPLICATION FILED FOR MINOR INTERIOR CHANGES CONSISTING OF REMOVING RACKS AND INSTALLING NEW EQUIPMENT FOR NEW SALES ITEMS IN EXISTING 1ST FLOOR COMMERCIAL SPACE AT EXISTING 1 STOR Y COMMERCIAL BUILDING. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
X01168717-I1
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
01/27/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
01/27/2025
Special inspection requirement — Maintenance information
JOHN SEMIOLI
01/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
01/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
01/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
02/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/25/2023
Violation issued (ECB, open)
Unknown
07/27/2022
Objection resolved — Addressed
07/26/2022
Objection raised — Admin
07/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
07/26/2022
Special inspection requirement — HVAC and service water heating system controls
JOHN SEMIOLI
07/26/2022
Special inspection requirement — Maintenance information
JOHN SEMIOLI
07/26/2022
Special inspection requirement — HVAC and service water heating equipment
JOHN SEMIOLI
07/26/2022
Special inspection requirement — Post-installed Anchors
JOHN SEMIOLI
07/25/2022
Filed — Alteration
INSTALLATION OF HEATING AND COOLING SYSTEM IN CONJUNCTION WITH ALT 1 APPLICATION # 240282564. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00436574-P2
07/25/2022
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH ALT 1 APPLICATION # 240282564. NO CHANG IN USE, EGRESS OR OCCUPANCY..
X00434109-P3
03/04/2022
Special inspection requirement — HVAC insulation and sealing
JOHN SEMIOLI
03/04/2022
Special inspection requirement — Mechanical Systems
JOHN SEMIOLI
03/04/2022
Special inspection requirement — Final
JOHN SEMIOLI
03/04/2022
Special inspection requirement — HVAC and service water heating system controls
JOHN SEMIOLI
03/04/2022
Special inspection requirement — HVAC and service water heating equipment
JOHN SEMIOLI
03/04/2022
Special inspection requirement — Shutoff dampers
JOHN SEMIOLI
03/04/2022
Special inspection requirement — Maintenance information
JOHN SEMIOLI
03/03/2022
Special inspection requirement — HVAC and service water heating system controls
JOHN SEMIOLI
03/03/2022
Special inspection requirement — Maintenance information
JOHN SEMIOLI
03/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
03/03/2022
Special inspection requirement — Post-installed Anchors
JOHN SEMIOLI
03/03/2022
Special inspection requirement — HVAC and service water heating equipment
JOHN SEMIOLI
02/21/2022
Permit issued — Plumbing
X00434109-I1-PL
02/08/2022
Permit issued — Plumbing
X00434109-I1-PL
01/11/2022
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH ALT 1 APPLICATION # 240282564. NO CHANG IN USE, EGRESS OR OCCUPANCY..
X00434109-P2
01/10/2022
Special inspection requirement — HVAC and service water heating equipment
JOHN SEMIOLI
01/10/2022
Special inspection requirement — Maintenance information
JOHN SEMIOLI
01/10/2022
Special inspection requirement — HVAC and service water heating system controls
JOHN SEMIOLI
01/10/2022
Special inspection requirement — Post-installed Anchors
JOHN SEMIOLI
01/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
11/24/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/04/2021
Permit issued — Plumbing
X00434109-I1-PL
08/20/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/18/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2021
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM FOR THE ENTIRE BUILDING IN CONJUNCTION ALT 1 APPLICATION 3 240282564. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00437397-P1
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC05/16/2025
DOB NOWGeneral ConstructionSigned-offTONY'SCONTRACTINGALP LLC04/23/2025
DOB NOWPlumbingPermit IssuedCOCHRANE PLBG & HTG02/21/2022
DOB NOWPlumbingPermit IssuedCOCHRANE PLBG & HTG02/08/2022
DOB NOWPlumbingPermit IssuedCOCHRANE PLBG & HTG11/04/2021
DOB NOWPlumbingPermit IssuedCOCHRANE PLBG & HTG05/05/2021
DOB NOWSprinklersPermit IssuedUNIVERSAL FIRE SPR LLC05/05/2021
BIS—ISSUEDFREEDOM GS INC01/17/2022
BIS—ISSUEDFREEDOM GS INC07/21/2021
BIS—ISSUEDFREEDOM GS INC12/22/2020
BIS—ISSUEDGOLDHAMMER WITTENSTEIN GOOD05/30/1990
1 project · most recent 07/25/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/25/2022——Air Conditioning Systems
Cooling
Trane PUMY-P36NKMU3 3 tons · Vrf Outdoor ×2
YSC120H3RHA-K7 10 tons · Condensing Unit ×2
YSD150G3RHC-K7 13 tons · Chiller ×2
YSD240G3RHC-K7 20 tons · Rooftop Unit ×2
1 project · most recent 06/04/2021
FiledStatusContractorScope
06/04/2021Permit IssuedUNIVERSAL FIRE SPR LLC116 heads
1 project · most recent 07/25/2022
Gas Water/Sanitary
FiledStatusContractorScope
07/25/2022Permit IssuedCOCHRANE PLBG & HTGGas, Water/Sanitary
2 projects · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025CompleteTITANIUM ELECTRICAL CORPGeneral Wiring
01/30/2023CompleteIZZO ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/24/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/20/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
02/08/2026Public Assembly Emergency LightingOlusoji Ojeyemiprogress
01/27/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
01/27/2025Energy Code Compliance InspectionsJOHN SEMIOLIprogress
01/27/2025Maintenance informationJOHN SEMIOLIenergy_progress
01/27/2025HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
01/27/2025HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
01/27/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
01/27/2025HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
07/26/2022Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
07/26/2022HVAC and service water heating system controls JOHN SEMIOLIenergy_progress
07/26/2022Maintenance informationJOHN SEMIOLIenergy_progress
07/26/2022HVAC and service water heating equipment JOHN SEMIOLIenergy_progress
07/26/2022Post-installed AnchorsJOHN SEMIOLIspecial
03/04/2022HVAC insulation and sealing JOHN SEMIOLIenergy_progress
03/04/2022Mechanical SystemsJOHN SEMIOLIspecial
03/04/2022FinalJOHN SEMIOLIprogress
03/04/2022HVAC and service water heating system controls JOHN SEMIOLIenergy_progress
03/04/2022HVAC and service water heating equipment JOHN SEMIOLIenergy_progress
03/04/2022Shutoff dampersJOHN SEMIOLIenergy_progress
03/04/2022Maintenance informationJOHN SEMIOLIenergy_progress
03/03/2022HVAC and service water heating system controls JOHN SEMIOLIenergy_progress
03/03/2022Maintenance informationJOHN SEMIOLIenergy_progress
03/03/2022Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
03/03/2022Post-installed AnchorsJOHN SEMIOLIspecial
03/03/2022HVAC and service water heating equipment JOHN SEMIOLIenergy_progress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
goBRANDSRetailFloor 1
Project X01168717 Alteration · LOC Issued · 02/05/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00434109-P2Request digital key ↗
08/25/2026X00434109-I1Request digital key ↗
08/25/2026X00434109-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/25/2026X00436574-I1Request digital key ↗
08/15/2026X00436574-P1Request digital key ↗
08/15/2026X00436574-P2Request digital key ↗
▸DOB NOWPlans/Sketch2
08/20/2026X01168717-I1Request digital key ↗
08/20/2026X01168717-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/25/2026X00437397-P1Request digital key ↗
08/14/2026X00437397-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
08/25/2026X00428392-I1Request digital key ↗
08/17/2026X01357100-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION8
03/31/2025240282564Open ↗
02/09/2022240282564Open ↗
06/11/2021240282564Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION1
12/22/2020240282564Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature25
09/02/2026X00434109-P1Open ↗
09/02/2026X00434109-P1Open ↗
09/02/2026X00434109-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026X00434109-P1Open ↗
09/02/2026X00434109-P1Open ↗
09/01/2026X00434109-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00434109-I1Open ↗
08/25/2026X00434109-P1Open ↗
08/25/2026X00434109-P2Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/02/2020240282564Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
09/02/2020240282564Open ↗
11/21/2017220488130Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026X00434109-I1Open ↗
08/25/2026X00434109-P1Open ↗
08/25/2026X00434109-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026X01168717-I1Open ↗
08/13/2026X01168717-S1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026X01168717-I1Open ↗
08/13/2026X01168717-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/02/2020240282564Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/02/2020240282564Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/02/2020240282564Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE8
02/11/2022240282564Open ↗
02/09/2022240282564Open ↗
06/11/2021240282564Open ↗
Showing 3 of 8 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/10/2020240282564Open ↗
09/02/2020240282564Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
02/11/2022240282564Open ↗
06/21/2021240282564Open ↗
02/08/2021240282564Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET1
11/21/2017220488130Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2020240282564Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM2
09/02/2020240282564Open ↗
11/21/2017220488130Open ↗