← Back
Two family frame
1874 EAST 9 STREET
BROOKLYN · Gravesend (East)-Homecrest · BIN 3178793
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R5Zoning
2,416 sfGross Floor Area
2Units
Two family frame · Owner of record: 1874 E 9 REALTY LLC · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Filed — no permit issued78p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2024$4.8M—1874 EAST 9TH STREET 11223 LLC → 1874 E 9 REALTY LLC$1,987/sf building
05/02/2017$2.5M—Private party → Private party$1,055/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HESHAM ELSHAMY PE208/17/2026
BGM ENGINEERING408/11/2026
EYAL LEVITT ARCHITECT PC307/14/2026
Building Lifecycle
All (59)Filed (9)Objection (20)Special Inspection (30)
08/26/2026
Objection resolved — Resolved
08/24/2026
Objection raised — Other
08/19/2026
Objection resolved — Resolved
08/17/2026
Filed — Alteration
8'-0" construction fence at perimeter of property
B01445529-I1
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S6
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S7
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S5
08/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S4
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/05/2026
Objection resolved — Resolved
08/05/2026
Special inspection requirement — Final
08/05/2026
Special inspection requirement — Footing and Foundation
08/03/2026
Objection raised — Admin
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/30/2026
Objection raised — Admin
07/30/2026
Objection raised — Admin
07/30/2026
Objection raised — Inspections
07/30/2026
Objection raised — Admin
07/30/2026
Objection raised — Admin
07/30/2026
Objection raised — Mechanical
07/30/2026
Special inspection requirement — Structural Cold-Formed Steel
07/30/2026
Special inspection requirement — Structural Steel - Details
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/16/2026
Special inspection requirement — Footing and Foundation
07/16/2026
Special inspection requirement — Final
07/16/2026
Special inspection requirement — Final
07/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S1
07/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S2
07/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-S3
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
07/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/22/2026
Special inspection requirement — Post-installed Anchors
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/22/2026
Special inspection requirement — Maintenance information
06/22/2026
Special inspection requirement — Ventilation and air distribution system
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/15/2026
Special inspection requirement — Maintenance information
06/11/2026
Special inspection requirement — Final
05/04/2026
Objection raised — Structural
05/04/2026
Objection raised — Zoning
05/04/2026
Objection raised — Scope
05/04/2026
Objection raised — Other
04/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
- HORIZONTAL & VERTICAL ENLARGEMENT TO EXISTING DWELLING - REMOVE EXISTING WOOD FRAME AND REPLACE WITH COLD FORM STEEL AND UPGRADE CONSTRUCTION CLASS
B01381710-I1
Nothing on file for this building.
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/11/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-EM288TSXU-A 238,000 BTU · Vrf Outdoor ×1
Ventilation
1 project · most recent 08/11/2026
Sprinkler System
FiledStatusContractorScope
08/11/2026——Sprinkler System
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026——Gas, Storm, Water/Sanitary
1 project · most recent 08/11/2026
Steel Wood
FiledStatusContractorScope
08/11/2026——Steel, Wood
1 project · most recent 08/17/2026
Fence
FiledStatusContractorScope
08/17/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/10/2026Structural Stability – Alterations of existing buildings—special
08/05/2026Final—progress
08/05/2026Footing and Foundation—progress
08/03/2026Structural Stability – Alterations of existing buildings—special
07/30/2026Structural Cold-Formed Steel—special
07/30/2026Structural Steel - Details—special
07/24/2026Structural Stability – Alterations of existing buildings—special
07/24/2026Structural Stability – Alterations of existing buildings—special
07/24/2026Structural Stability – Alterations of existing buildings—special
07/16/2026Footing and Foundation—progress
07/16/2026Final—progress
07/16/2026Final—progress
07/10/2026Energy Code Compliance Inspections—progress
07/10/2026Duct leakage testing, insulation and design—energy_progress
06/22/2026HVAC-R and service water heating system controls—energy_progress
06/22/2026HVAC-R and service water heating equipment—energy_progress
06/22/2026HVAC-R and service water piping design and insulation—energy_progress
06/22/2026Post-installed Anchors—special
06/22/2026Fire-Resistant Penetrations and Joints—special
06/22/2026Maintenance information—energy_progress
06/22/2026Ventilation and air distribution system—energy_progress
06/15/2026HVAC-R and service water heating system controls—energy_progress
06/15/2026Fire-Resistant Penetrations and Joints—special
06/15/2026Fire-Resistant Penetrations and Joints—special
06/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
Latest 25 of 40.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026B01381710-S3Request digital key ↗
09/03/2026B01381710-I1Request digital key ↗
09/03/2026B01381710-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026B01381710-I1Open ↗
08/13/2026B01381710-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026B01445529-I1Open ↗
08/17/2026B01381710-S6Open ↗
08/17/2026B01381710-S5Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01381710-S6Open ↗
08/17/2026B01381710-S5Open ↗
08/17/2026B01381710-S4Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWSite Survey: Initial2
08/17/2026B01381710-I1Open ↗
08/13/2026B01381710-I1Open ↗