ECB01/08/2024RCA WAS ISSUED ON 07/14/2022 BY INSPECTOR BADGE # 3440 FOR WORK WITHOUT PERMIT: INSPECTOR AT TIME OF INSPECTION OBSERVED A TWO-STORY REAR EXTENSION BEING CONSTRUCTED. THREE WORKERS ON SITE, ADDITIONAL STRUCTURE$2K due
Miscellaneous one family · 2,003 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.