← Back
BuildNYC
Four families
1879 WOODBINE STREET
QUEENS · Ridgewood · BIN 4082984
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R5BZoning
3,450 sfGross Floor Area
4Units
Rent Stabilized8 Active Violations ▸
Four families · Owner of record: 18-79 Woodbine Street · 2,500 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof10p · 2 filings · 20 docs
Floor 214p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
18-79 Woodbine Street2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Draft Master Engineering302/11/2021
Structural Engineering Integrated211/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Plans and Permits403/21/2026
Draft Master Engineering603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
F&S Contracting GroupGeneral Contractor307/08/2026
Bypass MechanicalPlumbing207/08/2026
A D Renovation SolutionGeneral Contractor103/21/2026
Dfe Contractorspecialty_contractor107/08/2026
Just Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Draft Master Engineering701302/11/2021
Ase Engineering5785411/24/2020
Building Lifecycle
06/12/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
12/02/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
04/16/2024
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/29/2023
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/08/2022
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBypass Mechanical04/27/2021
DOB NOWStructuralSigned-offF&S Contracting Group01/12/2021
DOB NOWPlumbingSigned-offBypass Mechanical12/17/2020
DOB NOWStructuralSigned-offF&S Contracting Group12/17/2020
DOB NOWMechanical SystemsSigned-offDfe Contractor08/13/2020
DOB NOWPlumbingSigned-offMohamed Abdelrazek07/06/2020
DOB NOWStructuralSigned-offF&S Contracting Group02/04/2020
BISOTISSUEDF&S Contracting Group12/23/2020
BISOTISSUEDA D Renovation Solution11/12/2020
BISOTISSUEDA D Renovation Solution04/30/2020
BISOTISSUEDA D Renovation Solution03/11/2020
1 project · most recent 08/10/2020
General Wiring
FiledStatusContractorScope
08/10/2020CompleteWCK ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/10/2021Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
02/10/2021HVAC insulation and sealing ANTHONY GURBALLenergy_progress
02/10/2021HVAC and service water heating system controls ANTHONY GURBALLenergy_progress
02/10/2021HVAC and service water heating equipment ANTHONY GURBALLenergy_progress
02/10/2021Maintenance informationANTHONY GURBALLenergy_progress
02/10/2021Energy Code Compliance InspectionsANTHONY GURBALLprogress
11/30/2020FinalChris Yiuprogress
11/30/2020Structural Stability – Alterations of existing buildingsalon egozispecial
11/30/2020Structural Steel - High Strength Boltingalon egozispecial
11/30/2020Structural Steel - Weldingalon egozispecial
12/03/2019HVAC and service water heating system controls ANTHONY GURBALLenergy_progress
12/03/2019FinalANTHONY GURBALLprogress
12/03/2019Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
12/03/2019Mechanical SystemsANTHONY GURBALLspecial
12/03/2019Maintenance informationANTHONY GURBALLenergy_progress
12/03/2019HVAC insulation and sealing ANTHONY GURBALLenergy_progress
12/03/2019HVAC and service water heating equipment ANTHONY GURBALLenergy_progress
72 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account