← Back
BuildNYC
Two stories - detached, small or mid-size
188-05 LIBERTY AVENUE
QUEENS · St. Albans · BIN 4457637
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 5 Boro Plaza · 0.32 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5 Boro Plaza203/22/2026
188-05 Liberty Ave103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Walid Abdulla110/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor110/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/08/2026
Building Lifecycle
10/20/2026
Permit issued — Solar
Q01468985-I1-SL
10/08/2026
Filed — Alteration
Q01468985-I1
10/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/08/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
26 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service10/20/2026
BIS—ISSUEDArkenstone Builders07/01/2025
BISOTISSUEDK.M.D. Construction08/21/2014
BISEQISSUEDK.M.D. Construction08/20/2014
BISPLISSUEDRock E Small Plumbing & Heating08/21/2006
BIS—ISSUEDHomeowner02/21/2006
3 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026Permit IssuedSunrun Solar Electl—
09/07/2026Permit IssuedExpert Electric Cont NY I—
12/06/2024CompletePower Surge ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/08/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/08/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
10/02/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/02/2026Energy Code Compliance InspectionsWalid Abdullaprogress
10/02/2026FinalWalid Abdullaprogress
45 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account