DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB12/16/2016VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB05/17/1990AH
ECB05/10/20163A,50,18A. FULTON V.T. BLK 10HP,NB84522,HP STEAM,GAS-FIRED,1999 3A SECTIONS OF THE FLUE PIPE CORRODED. REPLACE AND SECURE ALL DEFECTIVE SECTIONS.18A-EXTERNAL CORROSION AT HANDHOLD OPENINGS.REMOVE SCALE AND RUSTNothing owed — awaiting certificate of correction
ECB05/08/2007B4A/11C/50A/.50A-REVERSE BLOWDOWN VALVE.SLOW OPENING VALVE TERMINATE AT LAST POSITION.Nothing owed — awaiting certificate of correction
ECB04/13/200550A/50B FULTON VT BOILER 10HP NB 84522 GAS 1999 50A PRIMARY BLOWDOWN VALVE CORRODED REPALCE 50B-IMPROEPR ARRANGEMENT OF THE BLOWDOWN VALVES INSTALL A SCREW-TYPE (SLOW)VALVE AT THE OUTLET END OF THE BLOWDOWNNothing owed — awaiting certificate of correction