← Back
Elevator apt, semi-fireproof with stores
188-11 HILLSIDE AVENUE
QUEENS · BIN 4223680
💬 Discuss this project
2022Year Built
7Stories
D7Building Class
R6AZoning
116,353 sfGross Floor Area
102Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 188-11 HILLSIDE PARTNERS LLC · 25,224 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof9p · 5 filings · 20 docs
Floor 76p · 3 filings · 20 docs
Floor 68p · 4 filings · 20 docs
Floor 56p · 2 filings · 20 docs
Floor 45p · 3 filings · 20 docs
Floor 34p · 2 filings · 20 docs
Floor 27p · 4 filings · 20 docs
Floor 15p · 4 filings · 20 docs
Cellar11p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PIERMONT PROPERTIES6807/08/2026
188-11 HILLSIDE PARTNERS LLC2603/22/2026
RACANELLI CONSTRUCTION1803/22/2026
HUDSON VALLEY REALT ESTATE HOLDI603/22/2026
C O BOWNE ASSOC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2017$9.2M—HUDSON VALLEY REAL ESTATE HOLDING CORP → H.J.N. HOTELS CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADG303/21/2026
WILLIAM VITACCO ASSOCIATES1803/21/2026
AE DESIGN SOLUTION1003/21/2026
Rigid Structural Design, LLC103/21/2026
SOL BUILDING CONSULTING SERVICES403/21/2026
PERCIBALLI INDUSTRIES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1207/08/2026
RACANELLI CONSTRUCTION COGeneral Contractor807/08/2026
ETHOS PLUMBING CORPPlumbing707/08/2026
A & F FIRE PROTECTION COFire Protection607/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor204/09/2026
HIG ELECTRIC ASSC NYC INCElectrical203/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
CAS EQUIPMENT LLCGeneral Contractor104/09/2026
KNOCKOUT CONSTRUCTION INC.General Contractor104/09/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018311/14/2025
ADG ACHITECTURE AND DESIG3044210/27/2025
SPECIAL TESTING & CONSULT16881504/24/2024
SOIL MECHANICS DRILLING C2325109/12/2019
Building Lifecycle
All (253)Filed (36)Permit Issued (33)Signed Off (15)Violation (44)Inspection (15)Objection (80)Special Inspection (30)
02/05/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-I1
02/02/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-S3
01/26/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-S2
01/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/26/2025
Permit issued — Sprinklers
Q01116396-S2-EW-SP
12/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Carrano
12/12/2025
Special inspection requirement — Mechanical Systems
William Ryan
12/12/2025
Special inspection requirement — Final
William Ryan
12/12/2025
Special inspection requirement — Final
Christopher Carrano
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Carrano
11/21/2025
Signed off — Alteration
Q00230829-I1
11/14/2025
Filed — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-P2
11/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/12/2025
Special inspection requirement — Final
William Ryan
11/12/2025
Special inspection requirement — Mechanical Systems
William Ryan
10/27/2025
Filed — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-P1
10/23/2025
Special inspection requirement — Final
Christopher Carrano
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Carrano
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Christopher Carrano
09/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/08/2025
Permit issued — Mechanical Systems
Q01116396-S3-MS
08/06/2025
Permit issued — Plumbing
Q01116396-S2-PL
07/22/2025
Permit issued — General Construction
Q01116396-I1-GC
07/09/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00516457-I1
06/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00539711-I1
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Plumbing
06/05/2025
Objection raised — Fire_Protection
06/05/2025
Objection raised — Fire_Protection
06/05/2025
Objection raised — Mechanical
06/05/2025
Objection raised — Fire_Protection
05/20/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/14/2025
Filed — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-S2
05/14/2025
Signed off — Alteration
Installation of plumbing systems as per plans filed herewith in conjunction to NB #420666087.
Q00250369-I1
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/13/2025
Filed — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-S3
05/12/2025
Objection raised — Structural
05/12/2025
Objection raised — Fire_Protection
05/12/2025
Objection raised — Fire_Protection
05/12/2025
Objection raised — Admin
04/24/2025
Permit issued — Plumbing
Q00250369-I1-PL
04/23/2025
Filed — Alteration
SCOPE OF WORK INCLUDES INSTALLATION OF MECHANICAL HVAC SYSTEM FOR CELLAR TENANT'S SPACE.
Q01116396-I1
04/04/2025
Special inspection requirement — Sprinkler Systems
William Ryan
07/01/2024
Signed off — Alteration
Installation of mechanical systems as per plans filed herewith in conjunction to NB #420666087.
Q00250280-I1
06/26/2024
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2024
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2024
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2024
Special inspection requirement — HVAC insulation and sealing
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2024
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
Latest 60 of 253 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP12/26/2025
DOB NOWMechanical SystemsSigned-offCAS EQUIPMENT08/08/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/06/2025
DOB NOWGeneral ConstructionSigned-offKNOCKOUT CONSTRUCTION INC.07/22/2025
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP04/24/2025
DOB NOWCurb CutSigned-offRACANELLI CONSTRUCTION CO05/07/2024
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP05/01/2024
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP03/18/2024
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP02/14/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/25/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC08/04/2023
DOB NOWMechanical SystemsSigned-offRACANELLI CONSTRUCTION CO07/31/2023
DOB NOWStructuralSigned-offRACANELLI CONSTRUCTION CO07/20/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING06/15/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/22/2023
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC04/20/2023
DOB NOWStandpipeSigned-offADVANCED AUTO SPR.CO.,INC04/20/2023
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO01/26/2023
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP11/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING08/22/2022
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING06/30/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/17/2022
DOB NOWStandpipeSigned-offADVANCED AUTO SPR.CO.,INC05/09/2022
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC05/09/2022
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP10/19/2021
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING09/17/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING07/01/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/14/2021
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC05/14/2021
DOB NOWStandpipeSigned-offADVANCED AUTO SPR.CO.,INC05/14/2021
DOB NOWPlumbingSigned-offETHOS PLUMBING CORP03/01/2021
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO01/26/2021
DOB NOWConstruction FenceSigned-offRACANELLI CONSTRUCTION CO06/27/2019
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/30/2024
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/29/2024
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/26/2023
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/24/2022
BIS—ISSUEDRACANELLI CONSTRUCTION CO07/09/2021
BIS—ISSUEDRACANELLI CONSTRUCTION CO07/09/2021
BIS—ISSUEDRACANELLI CONSTRUCTION CO01/22/2021
+ 16 more permits on file
1 job · most recent 11/14/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/14/2025Signed-offCAS EQUIPMENT LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RZQ24TBVJUB 48,000 BTU · Vrf Outdoor ×6
1 job · most recent 11/14/2025
Sprinkler System
FiledStatusContractorScope
11/14/2025Signed-offFULL CAPACITY FIRE CORPSprinkler System
1 job · most recent 11/14/2025
Water/Sanitary
FiledStatusContractorScope
11/14/2025Signed-offINFINITI ESC PLUMBING CORWater/Sanitary
11 jobs · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteKEPLER ELECTRICAL CONTGeneral Wiring
12/12/2023CompleteGENMAR ELECT. CONT'G CORPGeneral Wiring
12/28/2022CompleteGENMAR ELECT. CONT'G CORP108 meters, 108 new_meters
12/28/2022CompleteGENMAR ELECT. CONT'G CORP1 meters
03/24/2022CompleteCORPORATE ELEC. GROUP INC—
03/24/2022CompleteCORPORATE ELEC. GROUP INC—
10/13/2021CompleteHIG ELECTRIC ASSC NYC INCGeneral Wiring
09/13/2021CompleteV. VASS ELECTRIC CORP—
09/03/2021CompleteHIG ELECTRIC ASSC NYC INC1 meters, 1 new_meters
05/21/2021CompleteHIG ELECTRIC ASSC NYC INC—
05/17/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/20/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/17/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/14/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/22/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
09/22/2023Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
09/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
12/12/2025Fire-Resistance Rated ConstructionChristopher Carranoprogress
12/12/2025Mechanical SystemsWilliam Ryanspecial
12/12/2025FinalWilliam Ryanprogress
12/12/2025FinalChristopher Carranoprogress
12/12/2025Fire-Resistant Penetrations and JointsChristopher Carranospecial
11/12/2025FinalWilliam Ryanprogress
11/12/2025Mechanical SystemsWilliam Ryanspecial
10/23/2025FinalChristopher Carranoprogress
10/23/2025Fire-Resistant Penetrations and JointsChristopher Carranospecial
10/23/2025Fire-Resistance Rated ConstructionChristopher Carranoprogress
04/04/2025Sprinkler SystemsWilliam Ryanspecial
06/26/2024HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/26/2024Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/26/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/26/2024Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/26/2024HVAC insulation and sealing SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/26/2024HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/26/2024Electrical energy consumptionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/26/2024Electrical motorsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
04/19/2024Electrical motorsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
04/19/2024Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
04/19/2024Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
04/19/2024FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
04/19/2024Electrical energy consumptionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
04/19/2024HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 49.
▾Documents — 310 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch11
08/27/2026Q00516457-I1Request digital key ↗
08/27/2026Q00516457-P1Request digital key ↗
08/27/2026Q00516457-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
08/27/2026Q00251627-I1Request digital key ↗
08/27/2026Q00251627-P2Request digital key ↗
08/26/2026Q00250369-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/22/2026Q00250280-P3Request digital key ↗
08/22/2026Q00250280-P2Request digital key ↗
08/15/2026Q00250280-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/28/2026Q00243501-P2Request digital key ↗
08/15/2026Q00243501-P1Request digital key ↗
08/15/2026Q00243501-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/24/2026Q00250332-P2Request digital key ↗
08/24/2026Q00250332-I1Request digital key ↗
08/15/2026Q00250332-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/15/2026Q00250500-I1Request digital key ↗
08/14/2026Q00250500-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/24/2026Q00250359-P1Request digital key ↗
08/15/2026Q00250359-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026Q00168012-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00230829-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION25
02/20/2024420666087Open ↗
04/28/2022420666087Open ↗
04/26/2022420666087Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION14
08/10/2021420666087Open ↗
08/10/2021420666087Open ↗
06/23/2021420666087Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/03/2025440565559Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/26/2025421134383Open ↗
05/26/2020420666087Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
03/26/2025421134383Open ↗
05/26/2020420666087Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/26/2025421134383Open ↗
▸BISVERIFY TAX LOT1
05/09/2024420666087Open ↗
▸BISZONING DIAGRAM1
05/26/2020420666087Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/28/2026Q00243501-I1Open ↗
08/28/2026Q00243501-P1Open ↗
08/28/2026Q00243501-P2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/29/2026Q01116396-S3Open ↗
09/23/2026Q01116396-I1Open ↗
09/23/2026Q01116396-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/29/2026Q01116396-S3Open ↗
09/23/2026Q01116396-I1Open ↗
09/23/2026Q00250332-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/13/2019421888434Open ↗
03/18/2019421888434Open ↗
11/05/2007410022504Open ↗
▸BISPC FULL REPORT1
11/05/2007410022504Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/07/2019440565559Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/05/2007410022504Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/05/2007410022504Open ↗
▸Trade Schedules & Equipment5
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL2
05/19/2025440565559Open ↗
08/14/2020420666087Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/29/2025420666087Open ↗
▸BISELECTRIC CUT-OFF1
08/13/2019421888434Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/13/2019421888434Open ↗
▸Safety & Tenant Protection8
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
08/13/2019421888434Open ↗
06/18/2019421888434Open ↗
03/18/2019421888434Open ↗
▸BISSTREET TREE CHECKLIST2
01/27/2020420666087Open ↗
11/07/2019440565559Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/14/2020420666087Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
06/03/2025440565559Open ↗
▸BISSTREET TREE SIGNOFF1
06/13/2025420666087Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/05/2007410022504Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/14/2020420666087Open ↗
08/14/2020420666087Open ↗
08/14/2020420666087Open ↗
Showing 3 of 5 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/17/2024420666087Open ↗
▸BISFENESTRATION AREAS1
04/17/2024420666087Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/17/2024420666087Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/17/2024420666087Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/14/2020420666087Open ↗
08/14/2020420666087Open ↗
08/14/2020420666087Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
07/28/2021420666087Open ↗
07/28/2021420666087Open ↗
06/15/2021420666087Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/24/2025420666087Open ↗
08/14/2020420666087Open ↗
▸BISBPP: FIELD INSPECTION1
05/20/2025440565559Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/14/2020420666087Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/17/2024420666087Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/17/2024420666087Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/17/2024420666087Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
04/17/2024420666087Open ↗
▸BISSOIL REPORT1
04/23/2020420666087Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00224998-I1Open ↗
▸Approvals, Objections & Sign-offs18
▸BISSCHEDULE A - OCCUPANCY / USE5
02/20/2024420666087Open ↗
12/15/2020420666087Open ↗
12/11/2020420666087Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/28/2020440565559Open ↗
04/23/2020420666087Open ↗
08/13/2019421888434Open ↗
Showing 3 of 4 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM3
08/13/2019421888434Open ↗
08/13/2019421888434Open ↗
08/13/2019421888434Open ↗
▸BISSUPERSEDING LETTER3
08/10/2021420666087Open ↗
06/23/2021420666087Open ↗
11/19/2020420666087Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/24/2008410022504Open ↗
▸BISLANDMARKS APPROVAL1
08/13/2019421888434Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/26/2007410022504Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE5
01/09/2023420666087Open ↗
05/25/2022420666087Open ↗
06/23/2021420666087Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
11/07/2007410022504Open ↗
11/07/2007410022504Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
03/15/2023420666087Open ↗
08/13/2019421888434Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
08/13/2019421888434Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
05/20/2025440565559Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION17
04/22/2024420666087Open ↗
12/29/2023420666087Open ↗
07/12/2022420666087Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM5
05/25/2022420666087Open ↗
08/10/2021420666087Open ↗
07/28/2021420666087Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
07/19/2019420666087Open ↗
07/19/2019420666087Open ↗
03/18/2019421888434Open ↗
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/26/2025421134383Open ↗
03/26/2025421134383Open ↗
05/26/2020420666087Open ↗
Showing 3 of 5 on file for this type
▸BISLOWEST FLOOR ELEVATION1
04/17/2024420666087Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/20/2025440565559Open ↗
▸BISVESTIBULES1
04/17/2024420666087Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/20/2025440565559Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/17/2024420666087Open ↗
▸BISNEW HOUSE NUMBER DOCUMENTATION1
08/15/2020420666087Open ↗