← Back
Two stories - detached, small or mid-size
188-15 122 AVENUE
QUEENS · St. Albans · BIN 4273075
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2Zoning
1,368 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,240 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1p · 1 filing · 9 docs
Floor 11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
German407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/23/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/17/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01150994-I1
12/30/2024
Permit issued — Solar
Q01150994-I1-SL
12/23/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01150994-I1
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/04/2024
Special inspection requirement — Final
Walid Abdulla
12/04/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/30/2024
1 project · most recent 02/20/2025
General Wiring
FiledStatusContractorScope
02/20/2025CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/04/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/04/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/04/2024FinalWalid Abdullaprogress
12/04/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01150994-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01150994-I1Open ↗
08/23/2026Q01150994-I1Open ↗
08/23/2026Q01150994-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01150994-I1Open ↗
08/23/2026Q01150994-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01150994-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01150994-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01150994-I1Open ↗