← Back
BuildNYC
Two family frame
188-21 118TH AVENUE
QUEENS · St. Albans · BIN 4623561
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
1,786 sfGross Floor Area
2Units
Two family frame · Owner of record: 188-23 118th Ave, St Albans Management · 2,500 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 29p · 2 filings · 20 docs
Floor 1Curb cut installation10p · 3 filings · 20 docs
Cellar9p · 2 filings · 20 docs
Site & exterior2p · 2 filings · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2026$1.1M—188-23 118TH AVE. ST. ALBANS MANAGEMENT LLC → Private party$616/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Group Enterprises207/08/2025
Tabriz Design Group401/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Home Developmentspecialty_contractor303/21/2026
Gerebuzza ConstructionGeneral Contractor203/21/2026
Rock E Small Plumbing & HeatingPlumbing207/08/2026
Chandrabali RamanandGeneral Contractor107/08/2026
Gerebuzza ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275407/08/2025
Triangle Inspection & Tes7495101/07/2022
Building Lifecycle
02/09/2026
Signed off — New Building
MECHANICAL FILING FOR ERV UNIT IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00519166 FOR TWO STORY AND CELLAR TWO FAMILY DWELLING
Q00519166-I1
09/16/2025
Signed off — New Building
MECHANICAL FILING FOR ERV UNIT IN CONJUNCTION WITH NEW BUILDING APPLICATION # Q00519166 FOR TWO STORY AND CELLAR TWO FAMILY DWELLING
Q00519166-S1
08/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/04/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPrecision Home Development06/11/2025
DOB NOWCurb CutSigned-offChandrabali Ramanand10/03/2024
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating08/28/2024
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating08/04/2023
DOB NOWGeneral ConstructionPermit IssuedGerebuzza Construction02/02/2023
DOB NOWConstruction FenceSigned-offGerebuzza Construction01/24/2023
1 project · most recent 07/08/2025
Ventilation Systems
FiledStatusContractorScope
07/08/2025Signed-offPrecision Home DevelopmentVentilation Systems
1 project · most recent 06/23/2023
General Wiring
FiledStatusContractorScope
06/23/2023CompleteSupreme ElectricGeneral Wiring
1 project · most recent 07/08/2025
FiledStatusContractorScope
07/08/2025Signed-offPrecision Home Development—
1 project · most recent 07/08/2025
Earthwork
FiledStatusContractorScope
07/08/2025Signed-offPrecision Home DevelopmentEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/11/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
08/04/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/04/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/04/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/04/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/04/2025Footing and FoundationBAKHTIAR SHAMLOOprogress
08/04/2025FinalHARI SONIprogress
08/04/2025HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
08/04/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
08/04/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
08/04/2025MasonryBAKHTIAR SHAMLOOspecial
08/04/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/04/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/04/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/04/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
08/04/2025Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
08/04/2025MeteringBAKHTIAR SHAMLOOenergy_progress
08/04/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
08/04/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/04/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
06/11/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
06/11/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
06/11/2025Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
06/11/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
06/11/2025MasonryBAKHTIAR SHAMLOOspecial
06/11/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 46.
73 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account