← Back
BuildNYC
Two stories - detached, small or mid-size
188-23 118TH AVENUE
QUEENS · St. Albans · BIN 4271369
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,485 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 188-23 118th Ave, St Albans Management · 2,500 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 21p · 1 filing · 4 docs
Floor 17p · 3 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Site & exteriorRenovation and partial demolition of existing one-family bui6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2025$795K—188-23 118TH AVE ST. ALBANS MANAGEMENT LLC → Private party— not available
06/21/2019$485K—Private party → 188-23 118TH AVE, ST. ALBANS MANAGEMENT LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Design Group709/17/2024
Tabriz Group Enterprises106/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Design Group403/21/2026
Tabriz Group Enterprise103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gerebuzza ConstructionGeneral Contractor403/21/2026
Future RestorationScaffold203/21/2026
Gerebuzza ConstructionScaffold203/21/2026
Rock E Small Plumbing & HeatingPlumbing207/08/2026
Chandrabali RamanandGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275603/09/2023
Building Lifecycle
10/31/2024
Signed off — Alteration
Q00457977-I1
10/30/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/11/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/03/2024
Permit issued — Curb Cut
Q00457977-I1-CC
09/17/2024
Filed — Alteration
Q00457977-I1
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offChandrabali Ramanand10/03/2024
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating08/31/2023
DOB NOWPlumbingSigned-offRock E Small Plumbing & Heating07/22/2022
DOB NOWGeneral ConstructionSigned-offGerebuzza Construction06/14/2022
DOB NOWEarth WorkSigned-offGerebuzza Construction04/08/2022
DOB NOWConstruction FenceSigned-offGerebuzza Construction04/08/2022
DOB NOWConstruction FenceSigned-offFuture Restoration11/24/2020
BIS—ISSUEDN/A02/10/2023
1 project · most recent 07/19/2022
General Wiring
FiledStatusContractorScope
07/19/2022CompleteSupreme ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/30/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/11/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
02/27/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
02/27/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
02/27/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
02/27/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/27/2023MasonryBAKHTIAR SHAMLOOspecial
02/27/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/27/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/27/2023Energy Code ComplianceBAKHTIAR SHAMLOOprogress
02/27/2023FinalHARI SONIprogress
02/27/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
02/27/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
02/27/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
02/27/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
02/27/2023Air barrier continuity plan testingBAKHTIAR SHAMLOOenergy_progress
02/27/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
02/27/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
02/27/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
02/27/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
02/27/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
02/27/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
02/27/2023MeteringBAKHTIAR SHAMLOOenergy_progress
06/29/2022Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/07/2022FinalHARI SONIprogress
04/07/2022Footing and FoundationBAKHTIAR SHAMLOOprogress
04/07/2022Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
Latest 25 of 51.
115 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account