| Owner | Filings | Most Recent |
|---|---|---|
| ROYALE CONDOMINIUM | 46 | 03/21/2026 |
| 63RD 64TH STREET ASSOCIATES | 35 | 04/09/2026 |
| K E S CONSTRUCTION | 15 | 07/08/2026 |
| DOUGLAS ELLIMAN | 12 | 03/22/2026 |
| DOUGLAS ELLIMAN PROPERTY MGMT | 7 | 06/28/2026 |
| GATESIDE | 6 | 03/21/2026 |
| 63 64 STREET ASSOCIATES | 3 | 07/08/2026 |
| BRONX | 1 | 03/22/2026 |
| ADCO BUILDERS | 1 | 03/22/2026 |
| DESIGN HOME INTERIORS | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| DAVID MANN ARCHITECT | 4 | 05/18/2026 |
| TWIGCON LLC | 1 | 04/01/2026 |
| A-SQUARED | 1 | 01/27/2026 |
| CTA ARCHITECTS | 3 | 11/18/2025 |
| MW PROFESSIONAL ENGINEERING, P.C. | 1 | 11/04/2025 |
| WELLS ENGINEERING, PLLC | 2 | 06/10/2025 |
| MCLAREN ENGINEERING GROUP | 2 | 03/12/2025 |
| MSM ENGINEERING SERVICES, PLLC | 3 | 03/11/2025 |
| SHAHRISH SHUVO ENGINEERING P.C. | 2 | 02/07/2025 |
| MDA DESIGNGROUP | 1 | 01/27/2025 |
| CES ENGINEERING LLC | 4 | 01/17/2025 |
| HOWARD I SHAPIRO & ASSOCIATES | 3 | 08/01/2024 |
| LANDOW AND LANDOW ARCHITECTS | 3 | 02/08/2024 |
| SEVERUD ASSOCIATES | 2 | 01/30/2024 |
| CTA ARCHITECTS P.C. | 1 | 01/24/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 05/09/2023 |
| AT ARCHITECTS | 1 | 01/05/2023 |
| NDKAZALAS ARCHITECTURE P.C. | 1 | 11/11/2022 |
| HC ARCHITECT, PC | 3 | 06/28/2022 |
| JOEL PHAGOO P.E. PLLC | 1 | 06/03/2022 |
| TINMOUTH CHANG ARCHITECTS | 2 | 06/15/2021 |
| STEVEN LOEB | 1 | 05/18/2021 |
| VINCENT J. LIOTTA P.E. | 1 | 04/09/2021 |
| MARK WITTENBERG, R.A., P.C. | 1 | 12/07/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| A E C CONSULTING EXPEDITING | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 4 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 2 | 03/21/2026 |
| DOMINION EXPEDITING | 3 | 03/21/2026 |
| LLOYD NOEL BUILDING CONSULTANT | 3 | 03/21/2026 |
| ANDRA CONSTANTIN EXPEDITER | 2 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 12 | 03/21/2026 |
| AK CONSULTING SERVICES | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 4 | 03/21/2026 |
| NEXUS CONSULTING NYC, INC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ROCKLEDGE SCAFFOLD CORP | General Contractor | 12 | 08/26/2026 |
| JDM CONTRACTING SERVICES | General Contractor | 10 | 07/08/2026 |
| K.E.S CONSTRUCTION CO INC | General Contractor | 7 | 07/08/2026 |
| EV HOME RENOVATIONS CORP | General Contractor | 5 | 04/09/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| VAN GOGH PAINTERS LLC | General Contractor | 4 | 07/08/2026 |
| EH PLUMBING & HEATING COR | Plumbing | 2 | 07/08/2026 |
| JOBCO INCORPORATED | General Contractor | 2 | 03/21/2026 |
| STARR TENT & EVENT GROUP | General Contractor | 2 | 03/21/2026 |
| AMERICAN INDUSTRIES LLC | General Contractor | 2 | 03/21/2026 |
| PRIME RENOVATIONS INC | General Contractor | 2 | 07/08/2026 |
| UPDATE SYSTEMS ELECTRICAL | Electrical | 1 | 03/22/2026 |
| WALSH LAWRENCE | Electrical | 1 | 03/21/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 1 | 04/09/2026 |
| DESIGN HOME INTERIORS INC | General Contractor | 1 | 04/09/2026 |
| KSW MECHANICAL,LLC | General Contractor | 1 | 07/08/2026 |
| NOOR MECHANICAL SERVICES | General Contractor | 1 | 04/09/2026 |
| APOLLO PLBG & HTG INC | Plumbing | 1 | 06/28/2026 |
| AURA PLUMBING INC | Plumbing | 1 | 07/08/2026 |
| DEMAR PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| EVERYDAY MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| FERNANDEZ HTG & MECH CORP. | Plumbing | 1 | 07/08/2026 |
| MARQUIS P & H CO., INC | Plumbing | 1 | 07/08/2026 |
| M C M PLBG & HTG, INC | Plumbing | 1 | 07/08/2026 |
| BESTCO ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| H. A. BADER CONSULTANTS | 2332 | 4 | 05/18/2026 |
| ACE STRUCTURAL ENGINEERIN | 496 | 2 | 04/01/2026 |
| METRIC CONSULTING AND INS | 1803 | 6 | 11/18/2025 |
| MW PROFESSIONAL ENGINEERI | 570 | 1 | 11/04/2025 |
| WELLS DESIGN & CONSULTING | 7750 | 3 | 06/10/2025 |
| HUDSON PEAKS CONSULTING L | 8381 | 2 | 03/12/2025 |
| M.G. MCLAREN ENGINEERING | 2999 | 2 | 03/12/2025 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 1 | 01/27/2025 |
| TWIG SPECIAL INSPECTIONS | 885 | 6 | 01/17/2025 |
| CATALPA SPECIAL INSPECTIO | 2004 | 1 | 02/26/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 08/25/2026 |
| DOB NOW | Plumbing | Permit Issued | APOLLO PLBG & HTG INC | 06/26/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 05/29/2026 |
| DOB NOW | Construction Fence | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 05/05/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | K.E.S. CONSTRUCTION CO IN | 04/13/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTURAL PRESERVATION S | 03/11/2026 |
| DOB NOW | General Construction | Permit Issued | EV HOME RENOVATIONS | 02/17/2026 |
| DOB NOW | General Construction | Signed-off | NOOR MECHANICAL SERVICES | 01/12/2026 |
| DOB NOW | Structural | Permit Issued | K.E.S CONSTRUCTION CO INC | 12/03/2025 |
| DOB NOW | General Construction | Permit Issued | K.E.S CONSTRUCTION CO INC | 12/03/2025 |
| DOB NOW | General Construction | Signed-off | EV HOME RENOVATIONS | 11/28/2025 |
| DOB NOW | Plumbing | Permit Issued | PROCORE MECHANICAL CORP | 10/09/2025 |
| DOB NOW | General Construction | Signed-off | EV HOME RENOVATIONS | 09/23/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 06/02/2025 |
| DOB NOW | Construction Fence | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 05/06/2025 |
| DOB NOW | General Construction | Permit Issued | K.E.S CONSTRUCTION CO INC | 03/19/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/18/2025 |
| DOB NOW | Plumbing | Signed-off | FERNANDEZ HTG & MECH CORP. | 03/11/2025 |
| DOB NOW | Structural | Permit Issued | K.E.S CONSTRUCTION CO INC | 03/05/2025 |
| DOB NOW | Structural | Signed-off | A.W. & S. CONSTRUCTION CO | 03/04/2025 |
| DOB NOW | General Construction | Signed-off | JOBCO INCORPORATED | 02/27/2025 |
| DOB NOW | Plumbing | Signed-off | MARQUIS P & H CO., INC | 02/21/2025 |
| DOB NOW | General Construction | Signed-off | EV HOME RENOVATIONS | 02/07/2025 |
| DOB NOW | General Construction | Signed-off | DESIGN HOME INTERIORS INC | 02/04/2025 |
| DOB NOW | Structural | Signed-off | JDM CONTRACTING SERVICES | 01/06/2025 |
| DOB NOW | General Construction | Signed-off | JDM CONTRACTING SERVICES | 01/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JDM CONTRACTING SERVICES | 01/06/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | K.E.S. CONSTRUCTION CO IN | 10/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JDM CONTRACTING SERVICES | 07/09/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | K.E.S. CONSTRUCTION CO IN | 06/19/2024 |
| DOB NOW | Plumbing | Signed-off | M C M PLBG & HTG, INC | 06/18/2024 |
| DOB NOW | Structural | Signed-off | JDM CONTRACTING SERVICES | 06/17/2024 |
| DOB NOW | General Construction | Signed-off | JDM CONTRACTING SERVICES | 06/17/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 06/06/2024 |
| DOB NOW | Construction Fence | Permit Issued | ROCKLEDGE SCAFFOLD CORP | 05/07/2024 |
| DOB NOW | General Construction | Permit Issued | K.E.S CONSTRUCTION CO INC | 04/01/2024 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/26/2024 |
| DOB NOW | Structural | Permit Issued | K.E.S CONSTRUCTION CO INC | 03/25/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | K.E.S. CONSTRUCTION CO IN | 02/23/2024 |
| DOB NOW | Plumbing | Signed-off | DEMAR PLUMBING CORP | 06/20/2023 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/18/2026 | Permit Issued | PROCORE MECHANICAL CORP | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 08/14/2026 | Permit Issued | AMPACITY ELECTRICAL INC | General Wiring |
| 08/12/2026 | Permit Issued | MAX ELECTRIC CO., INC | General Wiring |
| 07/07/2026 | Pending Payment Verification | GREEN POWER ELECTRIC CORP | General Wiring |
| 01/13/2026 | Complete | CL ELECTRICAL CORP | — |
| 08/28/2025 | Complete | K & G ELECTRIC CO., INC | General Wiring |
| 06/24/2025 | Complete | WIRE ELECTRIC INST CO INC | — |
| 06/11/2025 | Complete | WIRE ELECTRIC INST CO INC | — |
| 05/16/2025 | Complete | WIRE ELECTRIC INST CO INC | — |
| 05/16/2025 | Complete | WIRE ELECTRIC INST CO INC | — |
| 03/13/2025 | Complete | UPDATE SYSTEMS ELECTRICAL | General Wiring |
| 07/28/2023 | Complete | TM SELECT ELECTRIC CORP | — |
| 06/25/2023 | Complete | ELECTRICAL CHARGES CORP | — |
| 04/17/2023 | Complete | BESTCO ELECTRICAL CORP | General Wiring |
| 03/07/2023 | Permit Issued | THE METRO GROUP ELECTRIC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2022 | Permit Issued | ROCKLEDGE SCAFFOLD CORP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/06/2026 | Permit Issued | STRUCTURAL PRESERVATION S | Suspended Scaffold |
| 11/04/2025 | Signed-off | NOOR MECHANICAL SERVICES | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/06/2026 | Permit Issued | STRUCTURAL PRESERVATION S | — |
| 08/01/2024 | Permit Issued | K.E.S. CONSTRUCTION CO IN | Suspended Scaffold (SC) |
| 02/14/2024 | Permit Issued | K.E.S. CONSTRUCTION CO IN | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/17/2026 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 04/17/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/02/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/04/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/29/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/22/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 05/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/27/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/22/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/21/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/18/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/15/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/24/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/24/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/25/2021 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/09/2026 | Fire-Resistant Penetrations and Joints | Howard Bader | special |
| 03/06/2026 | HVAC-R and service water piping design and insulation | ANTHONY UGBEBOR | energy_progress |
| 03/06/2026 | Permanent certificate | ANTHONY UGBEBOR | energy_progress |
| 01/07/2026 | Lighting in dwelling units | ANTHONY UGBEBOR | energy_progress |
| 01/07/2026 | Lighting controls | ANTHONY UGBEBOR | energy_progress |
| 11/04/2025 | Tenant Protection Plan Compliance | MING WAI WONG | special |
| 11/04/2025 | Post-installed Anchors | MING WAI WONG | special |
| 11/04/2025 | Fire-Resistant Penetrations and Joints | MING WAI WONG | special |
| 11/04/2025 | Final | MING WAI WONG | progress |
| 10/03/2025 | Masonry | SAMI HAJJAR P.E | special |
| 10/03/2025 | Final | Daniel Allen | progress |
| 10/03/2025 | Tenant Protection Plan Compliance | — | special |
| 10/03/2025 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| 10/03/2025 | Construction Operations Influencing Adjacent Structures | SAMI HAJJAR P.E | special |
| 09/08/2025 | Post-installed Anchors | ANTHONY UGBEBOR | special |
| 09/08/2025 | Final | ANDREW THOMPSON | progress |
| 09/08/2025 | Fire-Resistant Penetrations and Joints | ANTHONY UGBEBOR | special |
| 09/08/2025 | Post-installed Anchors | ANTHONY UGBEBOR | special |
| 09/08/2025 | Fire-Resistant Penetrations and Joints | ANTHONY UGBEBOR | special |
| 06/23/2025 | Fire-Resistant Penetrations and Joints | Tyrone Wells | special |
| 06/02/2025 | Fire-Resistant Penetrations and Joints | Tyrone Wells | special |
| 03/25/2025 | Fire-Resistant Penetrations and Joints | Jeremy Billig | special |
| 03/25/2025 | Tenant Protection Plan Compliance | GIORGI KHARDZEISHVILI | special |
| 03/25/2025 | Final | Jeremy Billig | progress |
| 03/25/2025 | Structural Stability – Alterations of existing buildings | Jeremy Billig | special |