ECB10/28/2026A time of inspection no access to interior, however observed 2ND floor enlargement completed without permits. Work has been performed 100% completed without permits., obtain permit$2K due
DOB12/10/2025Structure rendered non comliant. At time of inpection damage observed to roof joist and wall framing with severe fire damage and charring roof penetration at exposing interior to the elements . Exposure # 3 w all missing n 2ND floor . Owner to hire nyspe to submit report to ertinspections@buildings.NYC.gov.w/in 10DAYS addressing all conditons
DOB12/10/2025Structure rendered non compliant. At time of inspection observed sever e fire , water & smoke damage throughout,all windows have been removed severe charringof roof joist.and wall framing. Roof at exp.# 4 open & exposed to the elements exp # 3 wall masonary. Vacate entire premises forwith
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.