Over six families without stores
Los Sures Sip
188 SOUTH 2ND STREET · BIN 3063132
💬 Discuss this project
1910Year Built
6Stories
C1Building Class
R6Zoning
31,500 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized42 Active Violations 2 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: Los Sures Sip HDFC · 6,000 sf lot · 5.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLos SuresUnder Construction36p · 6 filings · 20 docs
Floor 6Los Sures Rehabilitation mechanical demolitionUnder Construction25p · 2 filings · 20 docs
Floor 5Los Sures Rehabilitation mechanical demolitionUnder Construction25p · 2 filings · 20 docs
Floor 4Los Sures Rehabilitation mechanical demolitionUnder Construction25p · 2 filings · 20 docs
Floor 3Los Sures Rehabilitation mechanical demolitionUnder Construction25p · 2 filings · 20 docs
Floor 2Los Sures Rehabilitation mechanical demolitionUnder Construction25p · 2 filings · 20 docs
Floor 1Unit 1B, Unit 1C, Unit 1DUnder Construction34p · 3 filings · 20 docs
CellarLos Sures Rehabilitation boiler replacementUnder Construction32p · 5 filings · 20 docs
Site & exteriorSidewalk shed constructionUnder Construction34p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Southside United-Los Sures Management2310/04/2026
Los Sures Sip HDFC303/22/2026
Atlas Building103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Collado Engineering409/19/2026
Synergic Design Architects105/28/2026
Cta Architects311/14/2025
Mje Professional Services110/07/2024
Cowley Engineering106/29/2024
Ashraf109/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HH Building Consulting & Architectu203/21/2026
Municipal Building Consultants603/21/2026
Rigid Structural Design203/21/2026
SNR Expediting Design203/21/2026
Theresa Voltaggio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor607/08/2026
Steel SystemsScaffold407/08/2026
AJC Plumbing & HeatingPlumbing309/29/2026
Reliable EnterprisesScaffold203/21/2026
Accord PowerGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803809/19/2026
Synergic Design8561105/28/2026
Cowley Engineering186106/29/2024
Building Lifecycle
All (118)Filed (12)Permit Issued (13)Signed Off (3)Violation (60)Special Inspection (30)
09/28/2026
Permit issued — Boiler Equipment
B01460260-I1-BE
09/19/2026
Filed — Alteration
Boiler replacement including ventilation, MER replacement and hot water flow replacement. New insulation of steam piping. No change to use, egress, or occupancy.
B01460260-I1
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
A
08/14/2026
Violation issued (HPD, open)
B
06/10/2026
Permit issued — Solar
B01391123-I1-SL
06/02/2026
Permit issued — Plumbing
B01065621-I1-PL
05/28/2026
Filed — Alteration
Installation of 11.44 kw solar energy system on roof. No change of occupancy, use or egress.
B01391123-I1
05/05/2026
Violation issued (HPD, closed)
A
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
04/22/2026
Special inspection requirement — Final
Malathi Ananthakrishnan
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
03/03/2026
Permit issued — Structural
B01069006-I1-GC-CX
03/03/2026
Permit issued — General Construction
B01065618-I1-GC
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
C
01/04/2026
Violation issued (HPD, open)
C
01/04/2026
Violation issued (HPD, open)
C
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
B
01/04/2026
Violation issued (HPD, open)
C
01/04/2026
Violation issued (HPD, open)
B
11/14/2025
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS CONSISTING OF MINOR DEMOLITION AND CONSTRUCTION AS PER PLANS FILED HEREWITH. STRUCTURAL, MECHANICAL AND PLUMBING FILED SEPARATELY.
B01065618-P3
11/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
10/09/2025
Signed off — Alteration
B01130743-I1
10/07/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01123334-I1
10/07/2025
Permit issued — General Construction
B01069006-I1-GC-CX
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
B
06/18/2025
Violation issued (HPD, open)
B
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
A
06/18/2025
Violation issued (HPD, open)
C
06/10/2025
Violation issued (HPD, closed)
A
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, closed)
C
04/17/2025
Violation issued (HPD, open)
B
04/17/2025
Violation issued (HPD, open)
B
03/25/2025
Permit issued — General Construction
B01065618-I1-GC
03/04/2025
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATIONS CONSISTING OF MINOR DEMOLITION AND CONSTRUCTION AS PER PLANS FILED HEREWITH. STRUCTURAL, MECHANICAL AND PLUMBING FILED SEPARATELY.
B01065618-P1
02/21/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
02/21/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
02/21/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
02/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAJC Plumbing & Heating09/28/2026
DOB NOWSolarPermit IssuedAccord Power06/10/2026
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating06/02/2026
DOB NOWStructuralPermit IssuedA.A.D. Construction03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction10/07/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/25/2025
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating12/13/2024
DOB NOWSuspended ScaffoldSigned-offMSR Construction11/14/2024
DOB NOWStructuralPermit IssuedA.A.D. Construction11/07/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises10/08/2024
DOB NOWSidewalk ShedSigned-offSteel Systems07/12/2021
DOB NOWSidewalk ShedSigned-offSteel Systems09/23/2020
BISOTISSUEDPna Contracting09/15/2021
BISOTISSUEDPna Contracting01/27/2021
BISOTISSUEDFG-PH08/28/2018
BISOTISSUEDFG-PH11/10/2016
BISPLISSUEDCegf & G Plumbing05/28/2016
BISOTISSUEDFG-PH11/12/2015
BISEQISSUEDColgate Enterprise04/24/2015
BISPLISSUEDCegf & G Plumbing12/08/2014
BISOTISSUEDFG-PH12/08/2014
BISEQISSUEDH & B Construction NY12/23/2010
BISFBISSUEDOlympian Fuel Oil12/17/2010
BISEQISSUEDH & B Construction NY07/29/2010
1 project · most recent 07/25/2024
Water/Sanitary
FiledStatusContractorScope
07/25/2024Permit IssuedAJC Plumbing & HeatingWater/Sanitary
4 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedAccord Power Electric—
07/21/2025Permit IssuedTechno-Volt ElectricGeneral Wiring
10/07/2024CompleteRichard Neu—
09/14/2020CompleteTop Shelf Electric—
1 project · most recent 06/29/2024
Steel
FiledStatusContractorScope
06/29/2024Permit IssuedA.A.D. ConstructionSteel
1 project · most recent 05/28/2026
FiledStatusContractorScope
05/28/2026Permit IssuedAccord Power26 panels, 11.44 kw, 4,116.88 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/22/2026Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
04/22/2026Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
04/22/2026FinalMalathi Ananthakrishnanprogress
04/22/2026Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
04/22/2026Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
11/04/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
11/04/2025Post-installed AnchorsSAMI HAJJAR P.Especial
11/04/2025MasonrySAMI HAJJAR P.Especial
11/04/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/04/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
11/04/2025FinalSAMI HAJJAR P.Eprogress
11/04/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/04/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/21/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
02/21/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/21/2025MasonrySAMI HAJJAR P.Especial
02/21/2025Post-installed AnchorsSAMI HAJJAR P.Especial
02/21/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
02/21/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
02/21/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/21/2025FinalSAMI HAJJAR P.Eprogress
09/12/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/06/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/21/2024Structural Steel - DetailsEric Cowleyspecial
06/21/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 37.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/24/2026B01069006-I1Request digital key ↗
08/24/2026B01065621-I1Request digital key ↗
08/24/2026B01084361-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00402011-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
04/03/2023321715845Open ↗
03/31/2023321715845Open ↗
07/12/2022321715845Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
01/27/2021321715845Open ↗
08/29/2018321803143Open ↗
04/23/2015340251783Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
11/26/2019321715845Open ↗
12/04/2018321803143Open ↗
12/04/2018321803143Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B01391123-I1Open ↗
09/01/2026B01391123-I1Open ↗
09/01/2026B01391123-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01069006-I1Open ↗
08/24/2026B01065621-I1Open ↗
08/24/2026B01084361-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01391123-I1Open ↗
09/01/2026B01391123-I1Open ↗
08/29/2026B01065620-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/26/2019321715845Open ↗
08/06/2018321803143Open ↗
09/30/2014320978554Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/26/2019321715845Open ↗
08/06/2018321803143Open ↗
04/23/2015340251783Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/29/2010320193447Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/23/2015340251783Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/30/2014320978554Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/23/2015340251783Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/23/2010320243303Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
05/10/2021321715845Open ↗
08/06/2018321803143Open ↗
▸BISSTREET TREE CHECKLIST1
11/23/2010320243303Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00402011-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01069006-I1Open ↗
08/24/2026B01065621-I1Open ↗
08/19/2026B01065618-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/29/2010320193447Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/27/2021321715845Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/23/2010320243303Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS2
11/27/2018321803143Open ↗
09/22/2017320946036Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/15/2023321715845Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/06/2018321803143Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/30/2014320978554Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/15/2023321715845Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/15/2023321715845Open ↗
04/23/2015340251783Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/26/2019321715845Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/19/2026B01065618-P1Open ↗
08/19/2026B01065618-I1Open ↗
08/13/2026B01065621-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/17/2023321715845Open ↗
12/04/2018321803143Open ↗
11/27/2018321803143Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/30/2014320978554Open ↗
07/29/2010320193447Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/30/2014320978554Open ↗
08/21/2014320946036Open ↗
▸BISSHED LETTER1
12/30/2010320193447Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
07/11/2022321715845Open ↗
11/26/2019321715845Open ↗
11/27/2018321803143Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/15/2023321715845Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET6
11/26/2019321715845Open ↗
08/06/2018321803143Open ↗
09/30/2014320978554Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
02/06/2019320978554Open ↗
01/09/2019320978554Open ↗
12/04/2018321803143Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
04/03/2023321715845Open ↗
07/12/2022321715845Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/23/2015340251783Open ↗
▸Other Documents3
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01065620-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01130743-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01130743-I1Open ↗