← Back
BuildNYC
Elevator apt, semi-fireproof without stores
188 ST NICHOLAS AVENUE
MANHATTAN · BIN 1058455
💬 Discuss this project
1920Year Built
7Stories
D1Building Class
R7AZoning
64,058 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized150 Active Violations 148 unresolved · 2 paperwork only 5 likely answered 2 old, status unconfirmed ▸FISP: UNSAFE
Elevator apt, semi-fireproof without stores · 11,523 sf lot · 5.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold outrigger and material hoist11p · 4 filings · 20 docs
BulkheadLocalized exterior repairs1p · 1 filing · 9 docs
CellarGas piping for replacement boiler13p · 3 filings · 20 docs
Site & exteriorSidewalk shed installationUnder Construction19p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
F E Nadal903/21/2026
F E Nadal Corp F E Nadal103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering609/03/2026
PS Engineers109/05/2024
Cta Architects112/18/2023
Paul Perdek, Professional Engineering102/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PS Engineers803/21/2026
AE Design Solution203/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockledge ScaffoldScaffold804/09/2026
Maspeth ContractingScaffold203/21/2026
Bci CommunicationsGeneral Contractor103/21/2026
Maspeth ContractingGeneral Contractor107/08/2026
G Bassolino PlumbingPlumbing103/21/2026
Leardon Boiler Worksspecialty_contractor107/08/2026
P.H. WorksPlumbing108/26/2026
Ward PlumbingPlumbing107/08/2026
Clear Communications GroupGeneral Contractor105/16/2001
Leardon Boiler WorksGeneral Contractor110/26/2015
L & Z RestorationGeneral Contractor105/17/2010
Odyssia Global CommercialGeneral Contractor107/21/2010
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catalpa Special Inspectio2004112/18/2023
Metric Consulting1803112/18/2023
Bazini Engineering1808303/24/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
09/23/2026
Signed off — Alteration
REPLACE BOILER AND GAS/OIL BURNER AS PER PLANS. CHANGE GRADE OF FUEL FROM #4 TO #2. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00786021-I1
09/10/2026
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00786036-I1
09/03/2026
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS/OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00786036-P2
08/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
263 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offP.H. Works08/25/2026
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold01/21/2026
DOB NOWSuspended ScaffoldSigned-offMaspeth Contracting02/28/2025
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold02/12/2025
DOB NOWSupported ScaffoldSigned-offMaspeth Contracting09/06/2024
DOB NOWSuspended ScaffoldSigned-offMaspeth Contracting07/11/2024
DOB NOWGeneral ConstructionSigned-offMaspeth Contracting05/31/2024
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold02/14/2024
DOB NOWMechanical SystemsSigned-offLeardon Boiler Works03/24/2023
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold02/15/2023
DOB NOWPlumbingSigned-offWard Plumbing01/17/2023
DOB NOWBoiler EquipmentSigned-offLeardon Boiler Works09/28/2022
DOB NOWSidewalk ShedPermit IssuedRockledge Scaffold02/14/2022
BISBLISSUEDLeardon Boiler Works03/09/2016
BISPLISSUEDG.bassolino Plumbing02/22/2016
BISOTISSUEDLeardon Boiler Works10/26/2015
BISBLISSUEDLeardon Boiler Works10/10/2014
BISPLISSUEDG.bassolino Plumbing10/10/2014
BISOTISSUEDOdyssia Global Commercial07/21/2010
BISOTISSUEDL & Z Restoration05/17/2010
BISOTISSUEDBci Communications05/07/2010
BISOTISSUEDBci Communications01/02/2009
BISMHISSUEDClear Communications Group05/16/2001
1 project · most recent 09/03/2026
Gas
FiledStatusContractorScope
09/03/2026Signed-offP.H. WorksGas
1 project · most recent 02/11/2022
FiledStatusContractorScope
02/11/2022Permit IssuedAnthony G Ferry—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/03/2023Energy Code Compliance InspectionsERIC BERLENTprogress
11/03/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
11/03/2023MasonrySAMI HAJJAR P.Especial
11/03/2023Tenant Protection Plan ComplianceERIC BERLENTspecial
11/03/2023FinalChrista Waringprogress
03/26/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
03/22/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
03/22/2023Mechanical SystemsJoseph Bazinispecial
03/22/2023Chimneys and ventsJoseph Bazinispecial
03/22/2023FinalJoseph Baziniprogress
107 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account