← Back
Two family converted from one family
188 WYONA STREET
BROOKLYN · East New York (North) · BIN 3083701
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R5BZoning
3,441 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,117 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 STREET1407/08/2026
BNA SERVICES703/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2021$990K—443 THIERIOT AVE LLC → Private party$288/sf building
11/19/2019$375K—Private party → 443 THIERIOT AVE LLC$109/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/16/2025
SION CONSULTING ENGINEERING PC508/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING203/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BNA SERVICES INCGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/16/2025
AR-TECH ENGINEERING, P.C.6659208/03/2021
BIG APPLE GROUP NY A RMA9168208/03/2021
SION CONSULTING ENG. PC1108203/23/2021
Building Lifecycle
All (43)Filed (6)Permit Issued (3)Signed Off (2)Violation (9)Special Inspection (23)
12/19/2025
Permit issued — Solar
B01330310-I1-SL
12/16/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01330310-I1
12/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/08/2025
Special inspection requirement — Final
Walid Abdulla
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/11/2021
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD PLUMBING
B00320730-I1
08/06/2021
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
08/06/2021
Special inspection requirement — HVAC insulation and sealing
ALBERTO ROMAN
08/06/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALBERTO ROMAN
08/06/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SOORJBALLY HARILALL
08/06/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
08/06/2021
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
08/03/2021
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PLUMBING
B00320730-A2
05/18/2021
Signed off — Alteration
B00364530-I1
03/23/2021
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PLUMBING
B00320730-P8
03/23/2021
Special inspection requirement — HVAC insulation and sealing
sion hourizadeh
03/23/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
03/23/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
sion hourizadeh
03/23/2021
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
03/23/2021
Special inspection requirement — HVAC and service water heating equipment
sion hourizadeh
03/23/2021
Special inspection requirement — HVAC and service water heating system controls
sion hourizadeh
03/08/2021
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PLUMBING
B00320730-P1
03/04/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
sion hourizadeh
03/04/2021
Special inspection requirement — HVAC insulation and sealing
sion hourizadeh
03/04/2021
Special inspection requirement — HVAC and service water heating equipment
sion hourizadeh
03/04/2021
Special inspection requirement — HVAC and service water heating system controls
sion hourizadeh
03/04/2021
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
03/04/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
02/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2020
Violation issued (ECB, closed)
Construction
11/10/2020
Violation issued (ECB, closed)
Construction
11/10/2020
Violation issued (ECB, closed)
Unknown
11/10/2020
Violation issued (ECB, closed)
Construction
11/10/2020
Violation issued (ECB, closed)
Construction
11/04/2020
Permit issued — Plumbing
B00320730-I1-PL
10/28/2020
Violation issued (ECB, closed)
Construction
09/04/2020
Violation issued (ECB, closed)
Unknown
07/06/2020
Permit issued — Construction Fence
B00364530-I1-FN
07/01/2020
Filed — Alteration
B00364530-I1
02/28/2020
Filed — Alteration
THIS APPLICATION IS FILED TO ADD PLUMBING
B00320730-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC12/19/2025
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN11/04/2020
DOB NOWConstruction FenceSigned-offBNA SERVICES INC07/06/2020
BIS—ISSUEDBNA SERVICES INC11/10/2020
BIS—ISSUEDBNA SERVICES INC08/06/2020
2 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025CompleteSUNRUN SOLAR ELECTL CORP—
10/26/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 12/16/2025
FiledStatusContractorScope
12/16/2025Signed-offSUNRUN INSTALLATION SVC28 panels, 11.48 kw, 294.32 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
12/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/08/2025FinalWalid Abdullaprogress
12/08/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/08/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/06/2021HVAC and service water heating equipment ALBERTO ROMANenergy_progress
08/06/2021HVAC insulation and sealing ALBERTO ROMANenergy_progress
08/06/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALBERTO ROMANspecial
08/06/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSOORJBALLY HARILALLspecial
08/06/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
08/06/2021HVAC and service water heating system controls ALBERTO ROMANenergy_progress
03/23/2021HVAC insulation and sealing sion hourizadehenergy_progress
03/23/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/23/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiession hourizadehspecial
03/23/2021Energy Code Compliance Inspectionssion hourizadehprogress
03/23/2021HVAC and service water heating equipment sion hourizadehenergy_progress
03/23/2021HVAC and service water heating system controls sion hourizadehenergy_progress
03/04/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiession hourizadehspecial
03/04/2021HVAC insulation and sealing sion hourizadehenergy_progress
03/04/2021HVAC and service water heating equipment sion hourizadehenergy_progress
03/04/2021HVAC and service water heating system controls sion hourizadehenergy_progress
03/04/2021Energy Code Compliance Inspectionssion hourizadehprogress
03/04/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00320730-I1Request digital key ↗
09/01/2026B00320730-A2Request digital key ↗
08/15/2026B00320730-P8Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00364530-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/19/2026B01330310-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
06/28/2021322028275Open ↗
06/25/2021322028275Open ↗
03/02/2021322028275Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
11/10/2020322028275Open ↗
11/10/2020322028275Open ↗
08/06/2020322028275Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/16/2021322028275Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
06/18/2021322028275Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/16/2021322028275Open ↗
▸BISZONING DIAGRAM1
06/24/2020322028275Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
06/19/2020322028275Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B00320730-I1Open ↗
09/02/2026B00320730-I1Open ↗
09/02/2026B00320730-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00320730-I1Open ↗
09/02/2026B00320730-I1Open ↗
08/29/2026B00320730-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026B01330310-I1Open ↗
08/13/2026B00320730-A2Open ↗
08/13/2026B00364530-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/16/2020322028275Open ↗
▸Trade Schedules & Equipment2
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/16/2021322028275Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/16/2021322028275Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/16/2020322028275Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026B01330310-I1Open ↗
08/13/2026B00320730-I1Open ↗
08/13/2026B00320730-A2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/01/2020322028275Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/13/2021322028275Open ↗
07/19/2020322028275Open ↗
06/23/2020322028275Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/16/2021322028275Open ↗
▸BISINTERIOR LIGHTING POWER1
04/16/2021322028275Open ↗
▸BISFENESTRATION AREAS1
04/16/2021322028275Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/16/2021322028275Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/26/2021322028275Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/16/2020322028275Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/16/2021322028275Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/16/2021322028275Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/16/2021322028275Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/13/2021322028275Open ↗
07/13/2021322028275Open ↗
07/19/2020322028275Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/16/2021322028275Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/16/2021322028275Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/16/2021322028275Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
04/16/2021322028275Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/16/2021322028275Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE7
06/28/2021322028275Open ↗
06/25/2021322028275Open ↗
03/02/2021322028275Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026B01330310-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/08/2020322028275Open ↗
01/16/2020322028275Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/26/2021322028275Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION6
08/26/2021322028275Open ↗
06/21/2021322028275Open ↗
03/08/2021322028275Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
04/27/2020322028275Open ↗
04/22/2020322028275Open ↗
▸BISEFILING COVER SHEET1
01/16/2020322028275Open ↗
▸Other Documents10
▸BISPLOT DIAGRAM3
09/16/2021322028275Open ↗
09/16/2021322028275Open ↗
01/16/2020322028275Open ↗
▸BISSHUTOFF DAMPERS1
04/16/2021322028275Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/23/2020322028275Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/26/2021322028275Open ↗
▸BISMAINTENANCE INFORMATION1
07/30/2020322028275Open ↗
▸BISPERMANENT CERTIFICATE1
07/30/2020322028275Open ↗
▸BISTCO - Supporting Documents1
08/02/2021322028275Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/16/2021322028275Open ↗