← Back
BuildNYC
Two family converted from one family
188 WYONA STREET
BROOKLYN · BIN 3083701
💬 Discuss this project
1910Year Built
2.5Stories
B3Building Class
R5BZoning
3,441 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 3,117 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 2 filings · 20 docs
Attic4p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
Site & exteriorConversion of 1 family to 2 family dwelling1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 Street1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2021$990K—443 THIERIOT AVE LLC → Private party$288/sf building
11/19/2019$375K—Private party → 443 THIERIOT AVE LLC$109/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering112/16/2025
Sion Consulting Engineering508/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sion Consulting Engineering203/21/2026
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bna ServicesScaffold303/21/2026
Sunrun Installation Servicespecialty_contractor104/09/2026
Nophier Plumbing & HeatingPlumbing107/08/2026
Bna ServicesGeneral Contractor211/10/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272112/16/2025
AR-Tech Engineering6659208/03/2021
Big Apple Group NY A Rma9168208/03/2021
Sion Consulting Engineering1108203/23/2021
Building Lifecycle
12/19/2025
Permit issued — Solar
B01330310-I1-SL
12/16/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01330310-I1
12/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/08/2025
Special inspection requirement — Final
Walid Abdulla
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service12/19/2025
DOB NOWPlumbingSigned-offNophier Plumbing & Heating11/04/2020
DOB NOWConstruction FenceSigned-offBna Services07/06/2020
BIS—ISSUEDBna Services11/10/2020
BIS—ISSUEDBna Services08/06/2020
2 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025CompleteSunrun Solar Electl—
10/26/2020CompletePower Surge ElectricGeneral Wiring
1 project · most recent 12/16/2025
FiledStatusContractorScope
12/16/2025Signed-offSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
12/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/08/2025FinalWalid Abdullaprogress
12/08/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/08/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/06/2021HVAC insulation and sealing ALBERTO ROMANenergy_progress
08/06/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALBERTO ROMANspecial
08/06/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSOORJBALLY HARILALLspecial
08/06/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
08/06/2021HVAC and service water heating system controls ALBERTO ROMANenergy_progress
08/06/2021HVAC and service water heating equipment ALBERTO ROMANenergy_progress
03/23/2021HVAC insulation and sealing sion hourizadehenergy_progress
03/23/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/23/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiession hourizadehspecial
03/23/2021Energy Code Compliance Inspectionssion hourizadehprogress
03/23/2021HVAC and service water heating equipment sion hourizadehenergy_progress
03/23/2021HVAC and service water heating system controls sion hourizadehenergy_progress
03/04/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
03/04/2021HVAC and service water heating equipment sion hourizadehenergy_progress
03/04/2021HVAC and service water heating system controls sion hourizadehenergy_progress
03/04/2021Energy Code Compliance Inspectionssion hourizadehprogress
03/04/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiession hourizadehspecial
03/04/2021HVAC insulation and sealing sion hourizadehenergy_progress
115 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account