ECB02/05/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39086598R ISSUED ON 05/18/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT$6K due
ECB04/22/2021UPON INSPECTION OF DEVICE IT WAS FOUND TO BE OUT-OF- SERVICE REMEDY; REPAIR AND RESTORE DEVICE TO SERVICE THEN NOTIFY NYCDOB OF SERVICE RESTORENothing owed — awaiting certificate of correction
ECB09/22/2016FAILURE TO MAINTAIN EXTERIOR BLDG EAST ELEV EXP#1 @ EAST ENTRANCE-DRIVE THRU STONE FACIA CRACKED, LIGHT FIXTURES MISS LENS,CEILING PANELS MISSING-LOOSE & MISSING BRICK VANEER @ NORTH ELEV EXP#4 FLRS 3-4 III EVINothing owed — awaiting certificate of correction
ECB06/10/2016FAILURE TO MAINTAIN EXTERIOR BLDG EAST ELEV. EXP#1-N.E CRACK PANEL 3RDFLR 10 FLR. BROKEN GLASS BLOCK E CRACKS 1TO2FLR WINDOW SCREEN DISLODGED OVER CAR ENTRANCE-CAR OUT DOOR ENTRANCE MISSING CEILINGS STRIPPED PANothing owed — awaiting certificate of correction
ECB12/10/2014WORK WITHOUT A PERMIT. TIME: 10:45AM. FIRE DEPT CONNECTION WAS RELOCATED FROM ORIGINAL LOCATION DUE TO INSTALLATION OF TEMP BOILER OUTSIDE OF BLDG. NO PERMITS ON FILE FOR RELOCATION OF FIRE DEPT CONNECTION. REMNothing owed — awaiting certificate of correction
ECB04/18/2012FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCES.(I)SPALLED MASONRY WAS FOUND @ MARBLE FILLS & CRACK OBSERVED BY BOLT & NUT ANCHORAGE AREA BTWN 10 & 11 FLR @ NORTHWEST CORNER FIN.SAME WAS FOUND @ 8 FLR @ NORTH ELNothing owed — awaiting certificate of correction
ECB03/21/2003USE OR INSTALLATION OF PLUMBING MATERIALS OR EQUIPMENT WHICH DO NOT COMPLY WITH RS-16. LOCATION: 11 FLOOR JUM CAPS INSTALLED THROUGHOUT NEW WORK NO PRESSURE RELIEF VENTS FOR OFFSET OF SANITARY DRAIN STACKS. REMNothing owed — awaiting certificate of correction
ECB01/17/20031R12-3X11-10H12-16L11-16L11-17H12-65U5-81U5. 1-R-12 CONSTANT PRESURE NOT ALLOWED 3-X-11 OUTSIDE COMMUNICATION 16-L-11 ADJUST GAP BETWEEN HOISTWAY DOORS WHERE NECESSARY 16-L-11 NOT SELF CLOSING B,1,5,6,7,8,9 17-Nothing owed — awaiting certificate of correction
ECB07/21/2000FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 10 OF 1980 AND THE DEPDT OF BLDG RULES AND REGULATIONS.REMEDY:FILE THE REQUIRENothing owed — awaiting certificate of correction
ECB05/17/1999FAILURE TO SUBMIT A FOURTH ROUND TECHNICAL REPORT: PERIODIC INSPECTIONOF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 10 OF 1980 AND THE DEPARTMENT OF BUILDINGS RULES AND REGULATIONS. REMEDY:Nothing owed — awaiting certificate of correction
Hospital, sanitarium, mental institution · 293,586 sf lot · 3.66 FAR built · Flood zone X500