Condo, residential tower (mixed-use, multi-family elevator) [derived]
1884 BROADWAY
BROOKLYN · BIN 3428937
💬 Discuss this project
2021Year Built
7Stories
RMBuilding Class
R6Zoning
90,387 sfGross Floor Area
68Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: DK KINGS 1 LLC · 15,844 sf lot · 5.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Roof10p · 7 filings · 20 docs
Bulkhead1p · 2 filings · 9 docs
Floor 73p · 4 filings · 18 docs
Floor 63p · 4 filings · 18 docs
Floor 53p · 5 filings · 20 docs
Floor 43p · 5 filings · 20 docs
Floor 32p · 3 filings · 16 docs
Floor 2Under Construction52p · 6 filings · 20 docs
Floor 1Under Construction69p · 7 filings · 20 docs
Cellar3p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNSHINE PLAZA3107/08/2026
OWNERS REP103/22/2026
BROADWAY 18841603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1703/21/2026
Rigid Structural Design, LLC303/21/2026
AE DESIGN SOLUTION1403/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNSHINE CONSTR USA INCGeneral Contractor1507/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor707/08/2026
SUCCESS DEVELOPERS LLCGeneral Contractor604/09/2026
METFLOW FIRE CONTROLPlumbing603/22/2026
METFLOW FIRE CONTROL LLCFire Protection307/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor203/22/2026
CREATIVE PLUMBING INPlumbing207/08/2026
GOING SIGN SVCNGScaffold107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616802/18/2026
BGM ENGINEERING, LLC1514604/28/2022
Building Lifecycle
All (218)Filed (32)Permit Issued (23)Signed Off (24)Violation (60)Inspection (21)Objection (28)Special Inspection (30)
09/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/25/2026
Special inspection requirement — Preliminary
FAHAD FATEH
03/25/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/25/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/25/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/25/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/24/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Cost
03/10/2026
Objection resolved — Addressed
03/09/2026
Objection raised — Scope
02/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work type filed for Daycare at first floor of existing 7 Story Building
B01023706-P6
02/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/29/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/29/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/29/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/29/2026
Special inspection requirement — Preliminary
FAHAD FATEH
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/08/2025
Permit issued — General Construction
B01023706-I1-GC
12/08/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/18/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing work type filed for Daycare at first floor of existing 7 Story Building
B01023706-P5
09/18/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
09/18/2025
Special inspection requirement — Preliminary
FAHAD FATEH
09/18/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/18/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/18/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/10/2025
Violation issued (HPD, closed)
C
09/10/2025
Violation issued (HPD, closed)
C
09/10/2025
Violation issued (HPD, closed)
B
09/10/2025
Violation issued (HPD, closed)
B
09/10/2025
Violation issued (HPD, closed)
B
08/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work type filed for Daycare at first floor of existing 7 Story Building
B01023706-S2
06/30/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
Plumbing work type filed for Daycare at first floor of existing 7 Story Building
B01023706-S4
06/16/2025
Violation issued (HPD, closed)
A
06/11/2025
Signed off — Alteration
Sprinkler work type filed for Daycare at first floor of existing 7 Story Building
B01198416-I1
06/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Permit issued — General Construction
B01023706-I1-GC
05/14/2025
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01156947-I1
05/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/07/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/24/2025
Permit issued — Sprinklers
B01198416-I1-EW-SP
04/07/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
04/01/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/01/2025
Objection raised — Scope
04/01/2025
Objection raised — Cost
03/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2025
Filed — Alteration
Sprinkler work type filed for Daycare at first floor of existing 7 Story Building
B01198416-I1
03/20/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC05/20/2025
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC04/24/2025
DOB NOWSignSigned-offPOLSINELLI, HENRY12/18/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC06/20/2024
DOB NOWMechanical SystemsSigned-offSUCCESS DEVELOPERS LLC05/29/2024
DOB NOWGeneral ConstructionPermit IssuedSUCCESS DEVELOPERS LLC05/22/2024
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC04/15/2022
DOB NOWMechanical SystemsSigned-offSUNSHINE CONSTR USA INC02/16/2022
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC12/03/2021
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC12/01/2021
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC12/01/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/13/2021
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES06/30/2021
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC06/07/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES05/13/2021
DOB NOWStructuralSigned-offSUNSHINE CONSTR USA INC05/06/2021
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN03/24/2021
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC12/04/2020
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC11/02/2020
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC04/21/2020
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC01/14/2020
DOB NOWConstruction FenceSigned-offSUNSHINE CONSTR USA INC12/16/2019
BIS—ISSUEDSUNSHINE CONSTR USA INC06/03/2022
BIS—ISSUEDSUNSHINE CONSTR USA INC12/07/2021
BIS—ISSUEDSUNSHINE CONSTR USA INC12/07/2021
BISOTISSUEDSUNSHINE CONSTR USA INC10/02/2020
BISOTISSUEDSUNSHINE CONSTR USA INC09/25/2020
1 project · most recent 02/18/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedSUCCESS DEVELOPERS LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric TURYE3843BN40AN 384,000 BTU ×1
Heating
Mitsubishi Electric TURYE3843BN40AN 430,000 BTU ×1
Ventilation
Aldes LE2000I 1,500 CFM · Erv ×1
1 project · most recent 02/18/2026
Water/Sanitary
FiledStatusContractorScope
02/18/2026Signed-offCREATIVE PLUMBING INWater/Sanitary
14 projects · most recent 05/14/2025
General Wiring
FiledStatusContractorScope
05/14/2025CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
05/17/2022CompleteM.R. ELEC'L SERVICE LLCGeneral Wiring
10/25/2021CompleteSTAR ELEC'L CONTRACTORS C—
05/07/2021CompleteV. VASS ELECTRIC CORP—
01/15/2020CompleteS&R ELECTRIC & CONTRACTINGeneral Wiring
12/06/2019CompleteV. VASS ELECTRIC CORP—
12/06/2019CompleteV. VASS ELECTRIC CORP—
12/06/2019CompleteV. VASS ELECTRIC CORP—
12/06/2019CompleteV. VASS ELECTRIC CORP—
12/05/2019CompleteV. VASS ELECTRIC CORP—
11/04/2019CompleteV. VASS ELECTRIC CORP—
11/04/2019CompleteV. VASS ELECTRIC CORP—
11/04/2019CompleteV. VASS ELECTRIC CORP—
11/04/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
09/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/07/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2024Pass-Final PL - UndergroundPassView ↗
09/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/28/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
03/25/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/25/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/25/2026Fenestration air leakageFAHAD FATEHenergy_progress
03/25/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/25/2026Fenestration areasFAHAD FATEHenergy_progress
03/25/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/25/2026PreliminaryFAHAD FATEHprogress
03/25/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/29/2026PreliminaryFAHAD FATEHprogress
01/29/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/29/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/29/2026Fenestration areasFAHAD FATEHenergy_progress
01/29/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/29/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/29/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
09/18/2025Fenestration areasFAHAD FATEHenergy_progress
09/18/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/18/2025PreliminaryFAHAD FATEHprogress
09/18/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/18/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
09/18/2025Fenestration air leakageFAHAD FATEHenergy_progress
09/18/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/18/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/20/2025Sprinkler SystemsFAHAD FATEHspecial
Latest 25 of 65.
▾Documents — 292 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch23
09/02/2026B00107507-I1Request digital key ↗
09/02/2026B00107490-I1Request digital key ↗
09/02/2026B00107518-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/02/2026B00256759-I1Request digital key ↗
09/02/2026B00256785-I1Request digital key ↗
09/02/2026B00256822-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00256796-I1Request digital key ↗
09/02/2026B00355615-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00269391-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026B00469870-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION16
08/16/2022321941182Open ↗
08/12/2022321941182Open ↗
03/01/2022321941182Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
06/08/2022321941182Open ↗
05/20/2021321941182Open ↗
05/10/2021340745466Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
01/20/2021340739400Open ↗
▸BISEQUIPMENT (EQ) PERMITS1
09/29/2020321941182Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/05/2021321941182Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B01023706-I1Open ↗
08/13/2026B01023706-P6Open ↗
08/13/2026B01023706-P2Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM2
07/28/2020321941182Open ↗
07/07/2020321941182Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/04/2020321941182Open ↗
▸BISVERIFY TAX LOT1
11/05/2021321941182Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/05/2021321941182Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/04/2020321941182Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
08/03/2020321941182Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/04/2020321941182Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01023706-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWProgress Inspector Seal & Signature33
09/25/2026B01023706-P6Open ↗
09/25/2026B01023706-P6Open ↗
09/25/2026B01023706-P6Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/02/2026B00107507-I1Open ↗
09/02/2026B00107490-I1Open ↗
09/02/2026B00107518-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/25/2026B01023706-P6Open ↗
09/23/2026B01023706-I1Open ↗
09/20/2026B00488495-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/20/2021340739400Open ↗
08/04/2020340745466Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/01/2020340745466Open ↗
10/09/2019321941182Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/04/2020340745466Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/20/2021340739400Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/04/2020340745466Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWFDNY: Letter of No Objection2
08/13/2026B00488495-P1Open ↗
08/13/2026B00488495-I1Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/09/2021321941182Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
07/28/2020321941182Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/18/2022321941182Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
01/20/2021340739400Open ↗
08/03/2020321941182Open ↗
07/28/2020321941182Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/29/2020321941182Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/20/2021340739400Open ↗
▸BISSTREET TREE SIGNOFF1
12/02/2021321941182Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01023706-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01023706-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01023706-I1Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/16/2022321941182Open ↗
12/27/2021321941182Open ↗
04/19/2021321941182Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/27/2021321941182Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/09/2019321941182Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
06/07/2022321941182Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
04/19/2021321941182Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01023706-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00529012-I1Open ↗
▸Inspections & Test Reports34
▸BISTECHNICAL REPORT: RESPONSIBILITY15
08/16/2022321941182Open ↗
12/27/2021321941182Open ↗
05/28/2021340745466Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
09/02/2022321941182Open ↗
09/02/2022321941182Open ↗
05/03/2021321941182Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
05/07/2021321941182Open ↗
05/03/2021321941182Open ↗
04/19/2021321941182Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF3
03/15/2022321941182Open ↗
03/15/2022321941182Open ↗
09/29/2020321941182Open ↗
▸BISSOIL REPORT2
08/04/2020340745466Open ↗
07/28/2020321941182Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
08/03/2020321941182Open ↗
07/28/2020321941182Open ↗
▸BISFUEL-GAS PIPING (WELDING)1
04/19/2021321941182Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
05/07/2021321941182Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
08/03/2020321941182Open ↗
▸Approvals, Objections & Sign-offs24
▸BISSCHEDULE A - OCCUPANCY / USE13
08/16/2022321941182Open ↗
08/12/2022321941182Open ↗
07/14/2020321941182Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/03/2020321941182Open ↗
08/03/2020321941182Open ↗
07/28/2020321941182Open ↗
Showing 3 of 7 on file for this type
▸BISNYCT APPROVAL REQUIRED-LOT LINE 16' FROM SUBWAY1
08/18/2022321941182Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
11/05/2021321941182Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
07/07/2020321941182Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/28/2021340745466Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/08/2022321941182Open ↗
05/20/2021321941182Open ↗
09/29/2020321941182Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
05/07/2021321941182Open ↗
▸BISCOST AFFIDAVIT1
08/04/2020340745466Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION23
08/31/2022321941182Open ↗
08/31/2022321941182Open ↗
08/08/2022321941182Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET3
01/18/2023322111166Open ↗
07/24/2020321941182Open ↗
10/09/2019321941182Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/20/2021340739400Open ↗
08/04/2020340745466Open ↗
▸Other Documents20
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
06/15/2020321941182Open ↗
06/15/2020321941182Open ↗
06/10/2020321941182Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026B01023706-P2Open ↗
08/13/2026B01023706-I1Open ↗
08/13/2026B01023706-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026B01023706-P6Open ↗
08/13/2026B01023706-I1Open ↗
08/13/2026B01023706-P5Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
07/28/2020321941182Open ↗
07/06/2020321941182Open ↗
07/01/2020321941182Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/11/2023322111166Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
03/15/2022321941182Open ↗
▸BISSMOKE CONTROL SYSTEMS1
01/06/2022321941182Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/05/2021321941182Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01023706-I1Open ↗