← Back
BuildNYC
Two family frame
1884 UNIVERSITY AVENUE
BRONX · BIN 2008530
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R7-1Zoning
2,192 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 3,898 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
CivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 51 filing · 15 docs
Floor 4
Floor 3
Floor 2Unit 2C, Unit 2D, Unit 2E1 filing · 15 docs
Floor 11 filing · 15 docs
Filed — no permit issuedConstruction fence installation5p · 2 filings · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2026$1.4M—Private party → 1884 HOLDINGS LLC$616/sf building
03/03/2025$642K—Private party → Private party$293/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou410/13/2026
Tal Azulay310/12/2026
Leandro Nils Dickson Architect310/07/2026
Aryeh Siegel Architect109/04/2026
Building Lifecycle
10/27/2026
Objection raised — Other
10/26/2026
Objection raised — Other
10/15/2026
Objection resolved — Resolved
10/14/2026
Objection raised — Other
10/13/2026
Filed — New Building
INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE
X01447033-S9
48 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/13/2026——Heating and Air Conditioning Systems
1 project · most recent 10/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/13/2026——Gas, Storm, Water/Sanitary
2 projects · most recent 10/13/2026
Fence
FiledStatusContractorScope
10/13/2026——Fence
09/04/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
10/06/2026Post-installed Anchors—special
10/06/2026Concrete - Cast-In-Place—special
10/06/2026Construction Operations Influencing Adjacent Structures—special
10/06/2026Subgrade Inspections—special
10/06/2026Subsurface Conditions – Fill Placement & In-Place Density—special
10/06/2026Subsurface Investigations (Borings/Test Pits)—special
10/06/2026Concrete - Cast-In-Place—special
10/06/2026Construction Operations Influencing Adjacent Structures—special
10/06/2026Masonry—special
10/06/2026Post-installed Anchors—special
10/06/2026Sprinkler Systems—special
10/06/2026Standpipe Systems—special
10/06/2026Fire-Resistant Penetrations and Joints—special
10/05/2026Post-installed Anchors—special
10/05/2026Footing and Foundation—progress
10/05/2026Fire-Resistant Penetrations and Joints—special
10/05/2026Final—progress
10/05/2026Standpipe Systems—special
10/05/2026Final—progress
09/10/2026Air barrier — testing —energy_progress
08/18/2026Fire-Resistant Penetrations and Joints—special
08/18/2026Energy Code Compliance Inspections—progress
08/18/2026Fire-Resistance Rated Construction—progress
08/18/2026Electrical motors and elevators—energy_progress
08/18/2026Interior lighting power—energy_progress
Latest 25 of 38.
12 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account