← Back
BuildNYC
BRONX
1888 CEDAR AVENUE
BRONX · BIN 2802725
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 4 docs
Floor 41 filing · 4 docs
Floor 31 filing · 4 docs
Floor 21 filing · 4 docs
Floor 1
Cellar1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Siqeca PE310/08/2026
Prime Zone Building Consulting111/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Prime Zone Building Consulting103/21/2026
Building Lifecycle
All (39)Filed (4)Objection (5)Special Inspection (30)
10/08/2026
Filed — New Building
PROPOSED FOUR (4) STORY NEW BUILD'G W/BULKHEAD, THIRTEEN (13) DWELLING UNITS, OBTAIN NEW CERTIFICATE OF OCCUPANCY.
X01320305-S3
10/07/2026
Objection raised — Scope
10/06/2026
Objection raised — Scope
09/18/2026
Filed — New Building
PROPOSED FOUR (4) STORY NEW BUILD'G W/BULKHEAD, THIRTEEN (13) DWELLING UNITS, OBTAIN NEW CERTIFICATE OF OCCUPANCY.
X01320305-S2
09/10/2026
Filed — New Building
PROPOSED FOUR (4) STORY NEW BUILD'G W/BULKHEAD, THIRTEEN (13) DWELLING UNITS, OBTAIN NEW CERTIFICATE OF OCCUPANCY.
X01320305-S1
09/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/10/2026
Special inspection requirement — Structural Steel - Details
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/19/2026
Special inspection requirement — Structural Cold-Formed Steel
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
08/19/2026
Special inspection requirement — Post-installed Anchors
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/19/2026
Special inspection requirement — Subgrade Inspections
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/19/2026
Special inspection requirement — Structural Steel - Welding
08/19/2026
Special inspection requirement — Masonry
08/19/2026
Special inspection requirement — Underpinning
08/19/2026
Special inspection requirement — Subgrade Inspections
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/18/2026
Special inspection requirement — Footing and Foundation
08/18/2026
Special inspection requirement — Final
08/18/2026
Special inspection requirement — Final
08/18/2026
Special inspection requirement — Footing and Foundation
08/18/2026
Special inspection requirement — Final
01/19/2026
Objection resolved — Resolved
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Zoning
11/26/2025
Filed — New Building
PROPOSED FOUR (4) STORY NEW BUILD'G W/BULKHEAD, THIRTEEN (13) DWELLING UNITS, OBTAIN NEW CERTIFICATE OF OCCUPANCY.
X01320305-I1
11/17/2025
Special inspection requirement — Metering
11/17/2025
Special inspection requirement — Fenestration areas
11/17/2025
Special inspection requirement — Air barrier - visual inspection
11/17/2025
Special inspection requirement — Lighting controls
11/17/2025
Special inspection requirement — Protection of exposed foundation insulation
11/17/2025
Special inspection requirement — Lighting in dwelling units
11/17/2025
Special inspection requirement — Insulation placement and R values
11/17/2025
Special inspection requirement — Exterior lighting power
11/17/2025
Special inspection requirement — Fenestration air leakage
Nothing on file for this building.
1 project · most recent 10/08/2026
Masonry
FiledStatusContractorScope
10/08/2026——Masonry
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/10/2026Structural Steel - High Strength Bolting—special
09/10/2026Structural Steel - Details—special
08/19/2026Concrete - Cast-In-Place—special
08/19/2026Subsurface Investigations (Borings/Test Pits)—special
08/19/2026Structural Cold-Formed Steel—special
08/19/2026Structural Stability – Alterations of existing buildings—special
08/19/2026Concrete - Cast-In-Place—special
08/19/2026Post-installed Anchors—special
08/19/2026Structural Stability – Alterations of existing buildings—special
08/19/2026Subgrade Inspections—special
08/19/2026Subsurface Investigations (Borings/Test Pits)—special
08/19/2026Structural Steel - Welding—special
08/19/2026Masonry—special
08/19/2026Underpinning—special
08/19/2026Subgrade Inspections—special
08/19/2026Structural Stability – Alterations of existing buildings—special
08/18/2026Footing and Foundation—progress
08/18/2026Final—progress
08/18/2026Final—progress
08/18/2026Footing and Foundation—progress
08/18/2026Final—progress
11/17/2025Metering—energy_progress
11/17/2025Fenestration areas—energy_progress
11/17/2025Air barrier - visual inspection—energy_progress
11/17/2025Lighting controls—energy_progress
Latest 25 of 37.
▾Documents — 7 on file (BIS + DOB NOW)
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
10/08/2026X01320305-S3Open ↗
10/08/2026X01320305-S1Open ↗
10/08/2026X01320305-S2Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
10/08/2026X01320305-S3Open ↗
10/08/2026X01320305-S2Open ↗
▸DOB NOWSOIL REPORT2
10/08/2026X01320305-S3Open ↗
10/08/2026X01320305-S2Open ↗