ECB10/11/2025AT TIME OF INSPECTION, NO WATCHPERSON PRESENT ON SITE AS REQUIRED; CONTRARY TO BC 3303.3, ONCE THE FOUNDATION IS POURED, SITES EXCEEDING 5,000 SQ FT MUST MAINTAIN A COMPETENT WATCHPERSON DURING ALL NON-WORKING$2K due
ECB06/12/2026AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1 AND 2, UPON REVIEW OF THE SITE SAFETY PLAN IT REVEAL THAT SIDEWALK SHED AT EXPOSURE #1 SHOULD BE INSTALLHearing held — result not yet published$2K proposed
ECB06/12/2026AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING, I OBSERVED 1 WORKER OPERATING A FORKLIFT, UPON REQUEST FOR HIS CERTIFICATE TO OPERATE ACCORDING TO THE MANUFACTURE SPECIFICATION NONE WAS PRESENTED OR ATHearing held — result not yet published$2K proposed
ECB06/12/2026AT THE TIME OF MY INSPECTION, I OBSERVED JERSEY BARRIERS WITH CHAIN LINK FENCE ON TOP COVERED WITH DEBRIS NETTING, UPON REVIEW OF THE DOT PERMIT IT ALLOWED TO ONLY OCCUPY 8 FEET OF ROADWAY AND THE BARRIERS WASHearing held — result not yet published$5K proposed
ECB05/28/2026AT TIME OF INSPECTION OF A 6-STORY ACTIVE JOB SITE, STANDPIPE SYSTEM AND ALARM SYSTEM WERE IN READINESS. UPON REQUEST, NO ELECTRICAL PERMIT FOR THE STANDPIPE ALARM SYSTEM WAS PROVIDED. DEPARTMENT RECORDS SHOW NHearing held — result not yet published
ECB05/04/2026OBSERVATION: @ EXPOSURE#1 SCAFFOLD ON NEEDLE BEAMS UPON MY REQUEST FOR NEEDLE BEAMS DRAWING NONE WAS PROVIDED/DISPLAYED. PSWO FOR NO MANUFACURE SPECS FOR NEEDLE BEAMS. STOP ALL SCAFFOLD WORK.PROVIDED MANUFACTURHearing held — result not yet published$1K proposed
Parochial school, yeshiva · Owner of record: MDY QUENTIN LLC · 13,284 sf lot · 0.19 FAR built · Flood zone X