← Back
Two family converted from one family
189-22 117TH ROAD
QUEENS · St. Albans · BIN 4624098
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
1,960 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: UNIQUE PROPERTY GROUP, INC. · 3,308 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivil
Roof1p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar2p · 2 filings · 20 docs
Site & exterior3p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASH CARRY PROPERTY1807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2022$998K—CASH & CARRY PROPERTY CORP → UNIQUE PROPERTY GROUP, INC.$509/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES208/24/2022
TABRIZ DESIGN GROUP303/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor903/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275308/24/2022
TRIANGLE INSPECTION & TES7495112/29/2021
Building Lifecycle
All (45)Filed (5)Permit Issued (4)Signed Off (3)Violation (2)Inspection (9)Special Inspection (22)
11/25/2025
Violation issued (HPD, open)
I
09/23/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/30/2022
Signed off — Alteration
Q00655155-I1
08/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/29/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Final
HARI SONI
08/29/2022
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
08/29/2022
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
08/24/2022
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, PARTIAL DEMOLITION, FULL RENOVATION, AND CHANGE TO METES AND BOUNDS. EXISTING ROOF AND ATTIC TO BE DEMOLISHED AND NEW ROOF WITH SPLAY PROPOSED. TWO-FAMILY TO REMAIN.
Q00610887-P1
08/10/2022
Signed off — Alteration
Q00615571-I1
08/10/2022
Signed off — Alteration
Q00698241-I1
08/04/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/10/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/08/2022
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/02/2022
Violation issued (ECB, closed)
Construction
03/30/2022
Permit issued — Curb Cut
Q00698241-I1-CC
03/14/2022
Filed — Alteration
Q00698241-I1
01/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2022
Permit issued — Plumbing
Q00655155-I1-PL
12/29/2021
Filed — Alteration
Q00655155-I1
12/20/2021
Permit issued — Earth Work
Q00610887-I1-GC-CX
11/15/2021
Permit issued — Construction Fence
Q00615571-I1-FN
11/10/2021
Filed — Alteration
Q00615571-I1
10/14/2021
Filed — Alteration CO
PROPOSED HORIZONTAL ENLARGEMENT, PARTIAL DEMOLITION, FULL RENOVATION, AND CHANGE TO METES AND BOUNDS. EXISTING ROOF AND ATTIC TO BE DEMOLISHED AND NEW ROOF WITH SPLAY PROPOSED. TWO-FAMILY TO REMAIN.
Q00610887-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC03/30/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/06/2022
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC12/20/2021
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC11/15/2021
1 project · most recent 01/19/2022
General Wiring
FiledStatusContractorScope
01/19/2022CompleteC & A ELECTRICAL CORPGeneral Wiring
1 project · most recent 08/24/2022
FiledStatusContractorScope
08/24/2022Permit IssuedJ&J DESIGNS INC1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2022Fail-Final CND-Occupancy InspectionFailView ↗
06/10/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/08/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
01/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/14/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/29/2022Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/29/2022MasonryBAKHTIAR SHAMLOOspecial
08/29/2022Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/29/2022Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/29/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
08/29/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/29/2022Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/29/2022Footing and FoundationBAKHTIAR SHAMLOOprogress
08/29/2022Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
08/29/2022Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/29/2022FinalHARI SONIprogress
08/29/2022MeteringBAKHTIAR SHAMLOOenergy_progress
08/29/2022Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/29/2022HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
08/29/2022Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/29/2022Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/29/2022Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
08/29/2022Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
08/29/2022Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/29/2022Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/29/2022Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
08/29/2022Maintenance informationBAKHTIAR SHAMLOOenergy_progress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00615571-I1Request digital key ↗
08/26/2026Q00655155-I1Request digital key ↗
08/26/2026Q00698241-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00610887-I1Open ↗
08/13/2026Q00610887-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00610887-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00615571-I1Open ↗
08/26/2026Q00655155-I1Open ↗
08/25/2026Q00610887-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/19/2026Q00610887-I1Open ↗
09/19/2026Q00610887-I1Open ↗
09/19/2026Q00610887-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/19/2026Q00610887-I1Open ↗
09/19/2026Q00610887-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00610887-I1Open ↗
08/13/2026Q00610887-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00655155-I1Open ↗
08/25/2026Q00610887-I1Open ↗
08/25/2026Q00610887-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00610887-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00610887-I1Open ↗
08/13/2026Q00610887-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00610887-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00610887-I1Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/25/2026Q00610887-I1Open ↗
08/25/2026Q00610887-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00610887-I1Open ↗
08/13/2026Q00610887-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00610887-I1Open ↗
08/13/2026Q00610887-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00610887-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00610887-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00610887-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00610887-I1Open ↗