← Back
BuildNYC
Two family converted from one family
189-28 TURIN DRIVE
QUEENS · St. Albans · BIN 4221076
💬 Discuss this project
1950Year Built
1.5Stories
B3Building Class
R3AZoning
2,150 sfGross Floor Area
2Units
Two family converted from one family · 3,919 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic6p · 1 filing · 20 docs
Floor 1Unit Z1016p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Site & exterior6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Episcopal Church of St Alban T1407/08/2026
St Albans Episcopal Church103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&A Construction Services410/20/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Clancy GroupGeneral Contractor407/08/2026
Istra Electrical ContractorsElectrical103/22/2026
Johnny's P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE+CONSTRUCTION1326310/20/2022
Building Lifecycle
11/29/2022
Signed off — Alteration CO
moderate interior renovation of partitions, GWB, Tilework,trim, cosmetic finishes, bathroom vent raise doormer in attic space. Obtain a Certificate of occupancy for two family Residential dwelling.
Q00582031-S1
11/29/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2022
Filed — Alteration CO
moderate interior renovation of partitions, GWB, Tilework,trim, cosmetic finishes, bathroom vent raise doormer in attic space. Obtain a Certificate of occupancy for two family Residential dwelling.
Q00582031-P2
10/20/2022
Special inspection requirement — Metering
Joshua Pulver
10/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohnny Nanhu12/20/2021
DOB NOWGeneral ConstructionSigned-offThe Clancy Group12/10/2021
DOB NOWMechanical SystemsPermit IssuedThe Clancy Group12/07/2021
1 project · most recent 10/20/2022
Others
FiledStatusContractorScope
10/20/2022Signed-offThe Clancy GroupOthers
1 project · most recent 07/19/2022
General Wiring
FiledStatusContractorScope
07/19/2022CompleteIstra Electrical ContractorsGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/29/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2022Fail-Final CND-Occupancy InspectionFailView ↗
06/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/20/2022MeteringJoshua Pulverenergy_progress
10/20/2022Fire-Resistant Penetrations and JointsJoshua Pulverspecial
10/20/2022Mechanical SystemsJoshua Pulverspecial
10/20/2022Energy Code Compliance InspectionsJoshua Pulverprogress
10/20/2022FinalJoshua Pulverprogress
10/20/2022Lighting controlsJoshua Pulverenergy_progress
08/23/2022Fire-Resistant Penetrations and JointsJoshua Pulverspecial
08/23/2022Mechanical SystemsJoshua Pulverspecial
08/23/2022Energy Code Compliance InspectionsJoshua Pulverprogress
08/23/2022FinalJoshua Pulverprogress
08/23/2022Lighting controlsJoshua Pulverenergy_progress
08/23/2022MeteringJoshua Pulverenergy_progress
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account