← Back
Two stories - detached, small or mid-size
189-47 46 AVENUE
QUEENS · BIN 4124849
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R4-1Zoning
2,060 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,900 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 24p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/05/2023$940K—Private party → Private party$456/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.203/28/2025
TWIG CONSULTING ENGINEERS PC409/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LION JOINT VENTURES LLCGeneral Contractor507/08/2026
KJK ELECTRIC INCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI5865303/28/2025
Building Lifecycle
All (60)Filed (6)Permit Issued (4)Signed Off (3)Inspection (7)Objection (12)Special Inspection (28)
06/11/2025
Signed off — Alteration
Q00851517-I1
05/01/2025
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
05/01/2025
Special inspection requirement — Fenestration areas
THOMAS TUNG
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
05/01/2025
Special inspection requirement — Structural Steel - Welding
XIAOJUN WANG
05/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
05/01/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
THOMAS TUNG
05/01/2025
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
05/01/2025
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
05/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
THOMAS TUNG
05/01/2025
Special inspection requirement — Final
CALVIN TRAN
05/01/2025
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
03/28/2025
Filed — Alteration CO
CONVERT EXISTING (1) FAMILY HOUSE INTO (2) FAMILY HOUSE; ENCLOSE EXISTING PORCH WITH CONCRETE PLATFORM AT THE REAR OF THE HOUSE. OBTAIN NEW C OF O.
Q00894332-P2
09/04/2024
Signed off — Alteration
PLUMBING WORK AS PER PLAN, THERE IS NO CHNAGE OF EGRESS, USE AND OCCUPANCY.
Q00872648-I1
09/04/2024
Signed off — Alteration
INTERIOR NON-STRUCTURAL DEMOLITION ONLY, FULL RENOVATION WITH PLUMBING WORK ARE FILED UNDER SEPARATED APPLICATION, THERE IS NO CHANGE OF EGRESS, USE AND OCCUPANCY.
Q00860275-I1
09/04/2024
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
09/04/2024
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
09/04/2024
Special inspection requirement — Fenestration areas
THOMAS TUNG
09/04/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
THOMAS TUNG
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
09/04/2024
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
09/04/2024
Special inspection requirement — Structural Steel - Welding
XIAOJUN WANG
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
09/04/2024
Special inspection requirement — Final
CALVIN TRAN
09/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
THOMAS TUNG
09/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
03/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/18/2023
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
09/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
THOMAS TUNG
09/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
THOMAS TUNG
09/13/2023
Filed — Alteration
PLUMBING WORK AS PER PLAN, THERE IS NO CHNAGE OF EGRESS, USE AND OCCUPANCY.
Q00872648-P1
09/13/2023
Permit issued — Structural
Q00894332-I1-GC-CX
09/05/2023
Objection raised — Scope
09/05/2023
Objection resolved — Addressed
07/31/2023
Objection raised — Scope
07/31/2023
Objection resolved — Addressed
07/28/2023
Objection resolved — Addressed
07/27/2023
Objection resolved — Addressed
07/22/2023
Objection resolved — Addressed
07/22/2023
Objection resolved — Addressed
07/12/2023
Objection raised — Scope
07/12/2023
Objection raised — Fire_Protection
07/12/2023
Objection raised — Zoning
07/12/2023
Objection raised — Zoning
06/29/2023
Filed — Alteration CO
CONVERT EXISTING (1) FAMILY HOUSE INTO (2) FAMILY HOUSE; ENCLOSE EXISTING PORCH WITH CONCRETE PLATFORM AT THE REAR OF THE HOUSE. OBTAIN NEW C OF O.
Q00894332-I1
06/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2023
Permit issued — Plumbing
Q00872648-I1-PL
05/10/2023
Filed — Alteration
PLUMBING WORK AS PER PLAN, THERE IS NO CHNAGE OF EGRESS, USE AND OCCUPANCY.
Q00872648-I1
04/28/2023
Permit issued — General Construction
Q00851517-I1-GC
04/19/2023
Permit issued — General Construction
Q00860275-I1-GC
04/17/2023
Filed — Alteration
INTERIOR NON-STRUCTURAL DEMOLITION ONLY, FULL RENOVATION WITH PLUMBING WORK ARE FILED UNDER SEPARATED APPLICATION, THERE IS NO CHANGE OF EGRESS, USE AND OCCUPANCY.
Q00860275-I1
04/17/2023
Special inspection requirement — Final
CALVIN TRAN
04/04/2023
Filed — Alteration
Q00851517-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLION JOINT VENTURES09/13/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG06/10/2023
DOB NOWGeneral ConstructionSigned-offLION JOINT VENTURES04/28/2023
DOB NOWGeneral ConstructionSigned-offLION JOINT VENTURES04/19/2023
2 projects · most recent 04/02/2024
General Wiring
FiledStatusContractorScope
04/02/2024CompleteKJK ELECTRIC INCGeneral Wiring
05/02/2023CancelledKJK ELECTRIC INCGeneral Wiring
1 project · most recent 03/28/2025
Steel
FiledStatusContractorScope
03/28/2025Permit IssuedLION JOINT VENTURES LLCSteel
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/01/2025Fenestration air leakageTHOMAS TUNGenergy_progress
05/01/2025Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
05/01/2025Fenestration areasTHOMAS TUNGenergy_progress
05/01/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
05/01/2025Structural Steel - WeldingXIAOJUN WANGspecial
05/01/2025Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
05/01/2025Exterior Insulation and Finish Systems (EIFS)THOMAS TUNGspecial
05/01/2025Structural Steel - DetailsXIAOJUN WANGspecial
05/01/2025Energy Code Compliance InspectionsTHOMAS TUNGprogress
05/01/2025Fire-Resistance Rated ConstructionTHOMAS TUNGprogress
05/01/2025FinalCALVIN TRANprogress
05/01/2025Air barrier - visual inspectionTHOMAS TUNGenergy_progress
09/04/2024Air barrier - visual inspectionTHOMAS TUNGenergy_progress
09/04/2024Fenestration air leakageTHOMAS TUNGenergy_progress
09/04/2024Fenestration areasTHOMAS TUNGenergy_progress
09/04/2024Exterior Insulation and Finish Systems (EIFS)THOMAS TUNGspecial
09/04/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
09/04/2024Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
09/04/2024Structural Steel - DetailsXIAOJUN WANGspecial
09/04/2024Structural Steel - WeldingXIAOJUN WANGspecial
09/04/2024Energy Code Compliance InspectionsTHOMAS TUNGprogress
09/04/2024FinalCALVIN TRANprogress
09/04/2024Fire-Resistance Rated ConstructionTHOMAS TUNGprogress
09/04/2024Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
09/18/2023Energy Code Compliance InspectionsCALVIN TRANprogress
Latest 25 of 28.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00851517-I1Request digital key ↗
08/24/2026Q00860275-I1Request digital key ↗
08/24/2026Q00872648-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00894332-I1Open ↗
08/13/2026Q00894332-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00894332-I1Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature18
09/19/2026Q00860275-I1Open ↗
09/01/2026Q00894332-P2Open ↗
09/01/2026Q00894332-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00894332-P2Open ↗
09/01/2026Q00894332-P2Open ↗
09/01/2026Q00894332-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00851517-I1Open ↗
08/24/2026Q00872648-P1Open ↗
08/24/2026Q00872648-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00894332-I1Open ↗
08/13/2026Q00894332-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00851517-I1Open ↗
08/24/2026Q00872648-P1Open ↗
08/24/2026Q00872648-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents9
▸DOB NOWPlot Diagram2
08/13/2026Q00894332-P2Open ↗
08/13/2026Q00894332-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00894332-I1Open ↗
08/13/2026Q00894332-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q00894332-I1Open ↗
08/13/2026Q00894332-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00894332-P2Open ↗
08/13/2026Q00894332-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00894332-I1Open ↗