ECB02/20/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 12/16/2024 BY BADGE 2871,AT REAR A HUGE 2 STORY STRUCTURE ERECTED ,WITH FINISHED ROOF AND SIDING. THERE IS NO PERMIT IN DEPT RECORDS FOR THIS WORK ., OBTA$12K due
Two stories - detached, small or mid-size · 2,700 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.