← Back
BuildNYC
Adult care facility
189 SOUTH 2ND STREET
BROOKLYN · BIN 3062992
💬 Discuss this project
1910Year Built
3Stories
I7Building Class
R6Zoning
—Gross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Adult care facility · Owner of record: EL Regreso · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Sidewalk shed installation18p · 2 filings · 13 docs
Sub-Basement980 Prospect LLC2p · 1 filing · 4 docs
Site & exteriorLa Casa De Salud16p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
980 Prospect2407/08/2026
EL Regreso2003/22/2026
La Casa de Salud407/08/2026
141 South 3rd Street403/21/2026
EL Regreso Foundation403/21/2026
Acacia Network303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Celtic Services NYC403/21/2026
Eurocelt Expediting1203/21/2026
Haider Engineering, P.E203/21/2026
Haider Engineering P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K&E BuildersScaffold1907/08/2026
Celtic Services NYCScaffold1304/09/2026
HKS ConstructionScaffold707/08/2026
Reliable EnterprisesScaffold303/21/2026
4000 ElectricElectrical103/22/2026
Reliant Electrical Cont'gElectrical103/22/2026
Building Lifecycle
All (97)Filed (11)Permit Issued (18)Signed Off (7)Violation (59)Special Inspection (2)
05/05/2026
Violation issued (HPD, open)
A
02/14/2022
Signed off — Alteration
B00073622-I1
02/14/2022
Signed off — Alteration
B00058443-I1
02/10/2022
Permit issued — Construction Fence
B00058443-I1-FN
09/03/2021
Permit issued — Supported Scaffold
B00073622-I1-SF
07/28/2021
Violation issued (FDNY_ORDER, closed)
07/25/2021
Violation issued (FDNY_ORDER, closed)
05/17/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00042533-I1
05/11/2021
Signed off — Alteration
B00395958-I1
03/19/2021
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00033666-I1
03/18/2021
Signed off — Alteration
B00248499-I1
03/18/2021
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00421736-I1
11/10/2020
Filed — Alteration
INSTALLATION OF SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00421736-I1
11/10/2020
Permit issued — Supported Scaffold
B00421736-I1-SF
10/30/2020
Special inspection requirement — Final
Baris Acar
09/25/2020
Permit issued — Sidewalk Shed
B00395958-I1-SH
09/14/2020
Filed — Alteration
B00395958-I1
06/05/2020
Special inspection requirement — Final
Baris Acar
06/04/2020
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00033666-P3
05/28/2020
Violation issued (ECB, closed)
Construction
05/22/2020
Violation issued (ECB, closed)
Construction
05/22/2020
Violation issued (ECB, closed)
Construction
05/22/2020
Violation issued (ECB, closed)
Construction
05/22/2020
Violation issued (ECB, closed)
Construction
05/21/2020
Violation issued (ECB, closed)
Construction
05/21/2020
Violation issued (ECB, closed)
Construction
01/17/2020
Permit issued — Supported Scaffold
B00033666-I1-SF
01/17/2020
Permit issued — Supported Scaffold
B00248499-I1-SF
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/02/2020
Permit issued — Supported Scaffold
B00248499-I1-SF
12/16/2019
Permit issued — Supported Scaffold
B00033666-I1-SF
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2019
Permit issued — Supported Scaffold
B00248499-I1-SF
10/23/2019
Permit issued — Supported Scaffold
B00033666-I1-SF
10/18/2019
Filed — Alteration
B00248499-I1
10/16/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00033666-P2
10/07/2019
Violation issued (ECB, closed)
Construction
10/07/2019
Violation issued (ECB, closed)
Construction
10/07/2019
Violation issued (ECB, closed)
Construction
10/07/2019
Violation issued (ECB, closed)
Construction
10/07/2019
Violation issued (ECB, closed)
Construction
09/04/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00042533-P2
08/27/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
B00033666-P1
07/31/2019
Violation issued (ECB, closed)
Site Safety
07/31/2019
Violation issued (ECB, closed)
Construction
07/31/2019
Violation issued (ECB, closed)
Construction
07/31/2019
Violation issued (ECB, closed)
Construction
07/31/2019
Violation issued (ECB, closed)
Construction
07/31/2019
Violation issued (ECB, closed)
Construction
07/31/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCeltic Services NYC02/10/2022
DOB NOWSupported ScaffoldSigned-offCeltic Services NYC09/03/2021
DOB NOWSupported ScaffoldSigned-offK&E Builders11/10/2020
DOB NOWSidewalk ShedSigned-offReliable Enterprises09/25/2020
DOB NOWSupported ScaffoldSigned-offK&E Builders01/17/2020
DOB NOWSupported ScaffoldSigned-offK&E Builders01/17/2020
DOB NOWSupported ScaffoldSigned-offK&E Builders01/02/2020
DOB NOWSupported ScaffoldSigned-offK&E Builders12/16/2019
DOB NOWSupported ScaffoldSigned-offK&E Builders10/23/2019
DOB NOWSupported ScaffoldSigned-offK&E Builders10/23/2019
DOB NOWSupported ScaffoldSigned-offCeltic Services NYC05/03/2019
DOB NOWSidewalk ShedSigned-offHKS Construction03/20/2019
DOB NOWSupported ScaffoldSigned-offK&E Builders12/03/2018
DOB NOWSupported ScaffoldSigned-offCeltic Services NYC09/13/2018
DOB NOWSidewalk ShedSigned-offHKS Construction07/27/2018
DOB NOWConstruction FenceSigned-offCeltic Services NYC07/03/2018
DOB NOWSidewalk ShedSigned-offHKS Construction05/11/2018
DOB NOWSupported ScaffoldSigned-offK&E Builders04/17/2018
BIS—ISSUEDThe J. Pilla Group10/12/2021
BISPLISSUEDMJ General Mechanical02/08/2021
BIS—RE-ISSUEDThe J. Pilla Group09/22/2020
BISSPISSUEDGo Pro Fire Protection08/05/2020
BISEQISSUEDThe J. Pilla Group07/01/2020
BIS—ISSUEDThe J. Pilla Group03/04/2020
BISEQISSUEDThe J. Pilla Group07/02/2019
BIS—ISSUEDThe J. Pilla Group05/09/2019
BISPLISSUEDSP Plumbing and Heating01/07/2019
BISEQISSUEDThe J. Pilla Group07/10/2018
BIS—RE-ISSUEDThe J. Pilla Group07/10/2018
BISOTISSUEDCeltic Services NYC07/06/2018
BISOTISSUEDFG-PH11/11/2010
BISMHISSUEDFG-PH08/23/2010
BISBLISSUEDFlytiger P & H04/28/2010
BISOTISSUEDO.L. Fortune Construction03/22/2010
BIS—ISSUEDFortune Construction02/09/2001
BISEQISSUEDFortune Construction02/09/2001
5 projects · most recent 02/11/2021
General Wiring Lighting
FiledStatusContractorScope
02/11/2021CompleteReliant Electrical Cont'gGeneral Wiring, Lighting
10/22/2019CompleteWCK Electric—
06/10/2019CompleteNTS Electrical—
02/04/2019CompleteRichard Neu—
05/11/2018Complete4000 Electric—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
10/30/2020FinalBaris Acarprogress
06/05/2020FinalBaris Acarprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
La Casa De SaludMedical / HealthcareFloors 1, 5
Project B00421736 Alteration · LOC Issued · 11/10/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 331 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch - Supported Scaffold6
09/03/2026B00033666-I1Request digital key ↗
09/02/2026B00248499-I1Request digital key ↗
09/02/2026B00421736-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch4
09/03/2026B00033666-I1Request digital key ↗
09/03/2026B00042533-I1Request digital key ↗
09/03/2026B00058443-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026B00042533-I1Request digital key ↗
09/02/2026B00395958-I1Request digital key ↗
08/15/2026B00042533-P2Request digital key ↗
▸Applications & Permits78
▸BISPLAN / WORK APPROVAL APPLICATION58
03/01/2023320350008Open ↗
06/30/2022321183517Open ↗
06/27/2022321183517Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION14
11/16/2020321183517Open ↗
11/13/2020321183517Open ↗
08/05/2020340389065Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/01/2021340400319Open ↗
04/19/2017340400319Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/01/2023320350008Open ↗
08/05/2020340389065Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
06/25/2018340612554Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
06/25/2018340612554Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAMENDED ZONING DIAGRAM1
08/17/2020321183517Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/28/2022321183517Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/18/2021321183517Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026B00033666-I1Open ↗
09/03/2026B00033666-P3Open ↗
09/03/2026B00033666-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/16/2020340389065Open ↗
03/13/2020340389065Open ↗
07/10/2018321183517Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/19/2017340400319Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00421736-I1Open ↗
08/25/2026B00033666-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/25/2018340612554Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/25/2018340612554Open ↗
▸Trade Schedules & Equipment32
▸BISSCHEDULE B - PLUMBING12
05/18/2021321183517Open ↗
04/28/2021321183517Open ↗
04/23/2021321183517Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS9
06/25/2021321183517Open ↗
06/25/2021321183517Open ↗
06/25/2021321183517Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/01/2021321183517Open ↗
06/25/2021321183517Open ↗
06/25/2021321183517Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/23/2022321183517Open ↗
▸BISBOROUGH COMMISSIONER TO ADDRESS OPENFIRE ALARM.1
09/23/2022321183517Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/08/2021321183517Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/08/2021321183517Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/18/2021321183517Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
04/19/2017340400319Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT1
10/01/2021321183517Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/19/2017340400319Open ↗
▸BISSTREET TREE SIGNOFF1
12/19/2022321183517Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00248499-I1Open ↗
▸Environmental & Asbestos1
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/10/2018321183517Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/06/2021321183517Open ↗
11/01/2021321183517Open ↗
10/27/2021321183517Open ↗
Showing 3 of 8 on file for this type
▸BISNYCECC ANALYSIS1
06/25/2018340612554Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/10/2018321183517Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/28/2022321183517Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY24
12/06/2021321183517Open ↗
11/01/2021321183517Open ↗
10/27/2021321183517Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
07/10/2018321183517Open ↗
07/10/2018321183517Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/29/2017340389065Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISSCHEDULE A - OCCUPANCY / USE16
06/30/2022321183517Open ↗
04/21/2022321183517Open ↗
04/05/2022321183517Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/03/2026B00033666-P1Open ↗
09/03/2026B00033666-I1Open ↗
09/03/2026B00033666-P3Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/06/2022321400033Open ↗
01/18/2022340612554Open ↗
08/05/2021340389065Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER4
06/08/2021321183517Open ↗
12/20/2019321183517Open ↗
07/31/2018321183517Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
06/08/2021321183517Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
08/18/2021321183517Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT9
07/13/2021340612554Open ↗
06/25/2018340612554Open ↗
03/29/2017340389065Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/12/2021321400033Open ↗
06/08/2021321183517Open ↗
06/08/2021340389065Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/10/2018321183517Open ↗
06/25/2018340612554Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
08/17/2021340400319Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
11/16/2020321183517Open ↗
▸Filing & Intake Forms40
▸BISADDITIONAL INFORMATION28
07/26/2022321183517Open ↗
12/13/2021321400033Open ↗
10/01/2021321183517Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/25/2018340612554Open ↗
Showing 1 of 3 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026B00042533-P2Open ↗
08/13/2026B00042533-I1Open ↗
▸BISPROVIDE UPDATED IRS TAX EXEMPT DOCUMENT1
08/18/2021321183517Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
06/25/2018340612554Open ↗